Text
!
.A-
.
.
[
December 16,199ff
t
,
.
.
i
Mr. Oliver D. Kingsley -
_
President, Nuclear Generation Group
p
Commonwealth Edison Company
L
ATTN: Regulatory Services
Executive Towers West lil .
1400 Opus Place, Suite 500
Downers Grove,IL 60515
SUBJECT:
TEMPORARY INSTRUCTION 2515/138 INSPECTION REPORTS
50-373/98025(DRS); 50-374/98025(DRS)
l-
Dear Mr. Kingsley:
'
l
On November 6,1998, the NRC completed a special inspeciion at the LaSalle County Station,
j
Units 1 and 2. The enclosed report summarizes the results of this inspection.
,
The inspection was an evaluation of your operator workaround (OWA) program, conducted
under NRC temporary' instruction TI-138," Evaluation of the Cumulative Effect of Operator
[.
= Workarounds." The purpose of this inspection was two fold.. First, to evaluate the effectiveness
- of the program in evaluating the cumulative effect of OWAs on the ability of operators to safely
_ operate the plant'and e 'ectively respond to abnormal and emergency plant conditions. Second,
to gather information to support an evaluation of the need for additional NRC guidance
conceming OWAs. The inspection consisted of a selective evaluation of procedures and
representative records, observations of control room and in-plant activities, and interviews with
select personnel.
.The inspectors concluded that the LaSalle Station had established a program with procedural
guidance, that adequately addressed the pertinent issues concerning OWAs. It was concluded
,
that your operators were adequately knowledgeable, with some minor exceptions, of OWAs and
l
compensatory actions. Also, your staff was actively ernphasizing the identification, tracking, and
. timely resolution of OWAs. The inspectors also determined that there was a lack of specific
N.qb
guidance on how to perform an aggregate assesse.vit of the cumulative effects of OWAs on
l
safe plant operation.
!
. In addition, the inspectors noted that your def nition of OWA was limiting, in that the OWA
L
deficiency must be an " obstacle to safe plant operations." Your staff had changed the definition
of OWA to differentiate between safe and ncrmal plant operations, with deficiencies affecting
l
' normal plant operations recategorized as an operator challenge (OC).' The inspectors noted
l
that obstacles to normal plant operations could'potentially escalate to hinder safa plant
operations; thereby, making the NRC's definition of an OWA, per Tl 138, more effectua!. But,
the inspectors concluded that the implementation of the OWA and OC procedures collectively
,
had the capability of addressing the overall plant workaround issues.
- -
1
3
9812280083 981216
ADOCK 05000373
_
_
_
__
~.
__
-
_
.
.
. . .
.
. - =
. .
.
. - . .
,
.
.
O. Kingsley
-2-
,
Based on the small cross-sectional review of selected items, the inspectors concluded that the
existing discrepancies identified and tracked by your staff would not have prevented the safe
operation of Unit 1.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
1
Original Signed by Geoffrev E. Grant
Geoffrey E. Grant, Director
Division of Reactor Projects
'
Docket Nos.: 50-373;50-374
Enclosure.
Inspection Report 50-373/98025(DRS); 50-374/98025(DRS)
cc w! encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Regulatory Services Manager
D. Greene, Licensing Director
DCD - Licensing
F. Dacimo, Site Vice President
T. O'Connor, Station Manager
P. Barnes, Regulatory Assurance Supervisor
R. Hubbard'
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
,
DOCUMENT NAME: G\\DRS\\LAS98025.WPD
!
' To receive a copy of this document, ind6cate in the box *C" = Copy without/enetosure "E" = Copy with att enclosure "N" s No copy
OFFICE
Rlllef l0
Rill
lv Rill
l0
l
,
L
NAME
Peter!(of
Leach #9C4
Lanksbury4hh
Grant 6%
DATE
12/9/98
12/7/98
12/tt /98
12/l(d9(
/'
'
OFFICIAL RECORD COPY
'V
i
!
_
_
,
m.
.
. . _ .
-
. .
. .
. . -
-.. .
....
....
.
. . - . _ _ .
~ .
. =
.
p T'
l9
!...
!,.
O. Kingsley
-3-
i
i.-
~
Distribution:
L
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
l
C. Pederson, Rlli w/enci
l.
.' B. Clayton, Rlli w/ encl
SRI LaSalle w/enci
DRP w/enci
TSS w/enci
,
DRS (2) w/enci
,
l
Rlli PRR w/enci
+4 PUBLIC IE-42 w/enci
j
Docket File w/enci -
'
l
GREENS
LEO (E-Mail)
DOCDESK (E-Mail) .
M. Bies w/ encl
l
i
.
]
\\
kI
1
!
230015
.
w