Text
Q Comm mu calth lilison (:omgi.tny
!;thalle (eencrating St.ition 2(dll Nortti list Roat!
M.irseilles,11. 61.4 i l T57 Tel M15357 6'61 July 9,1999 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 1
NRC Docket Nos. 50-373 and 50-374,
Subject:
90-Day Post Outage ISI Letter Enclosed please find the Post-Outage (90 day) Summary Report for Inservice Inspection examinations and Repair / Replacement activities conducted from the beginning of the First inspection Period of the second Ten Year Inspectim Interval through the L2R07 refueling outage. This report has been submitted to you in accordance with the requirements of ASME Section XI, Article IWA-6200. The Commercial Service Date for LaSalle Onit 2 is October 17,1984.
Unit 2 is owned and operated by Commonwealth Edison Company, whose address is:
One First National Plaza P.O. Box 767 Chicago, Illinois 60690 Unit 2 has a gross generating capacity of 3323 MWt and began commercial Operation on October 17,1984.
/
4p 9907230354 990709
{
PDR ADOCK 05000373 G
PDR i
A linicum (lomjiJn) u
L 1
July 10,1999 U.S. Nuclear Regulatory Commission Page 2 Should you have any questions conceming this letter, please contact Frank A. Spangenberg, Ill, Regulatory Assurance Manager, at (815) 357-6761, extension 2383.
Respectfully, hA
~b Jeffrey A. Benjamin Site Vice President LaSalle County Station I
Enclosure cc:
Regional Administrator-NRC Region 111 i
NRC Senior Resident inspector - LaSalle County Station
)
v