IR 05000373/1986012
| ML20203D507 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/16/1986 |
| From: | Creed J, Drouin B, Pirtle G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20203D504 | List: |
| References | |
| 50-373-86-12, 50-374-86-12, NUDOCS 8604220130 | |
| Download: ML20203D507 (1) | |
Text
_
..,
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-373/86012(DRSS); 50-374/86012(DRSS)
Docket Nos. 50-373; 50-374 License No. NPF-11; NPF-18 Safeguards Group IV Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:
I.aSalle County Station, Units 1 and 2 Inspection At:
LaSalle County, IL Type of Inspection: Unannounced Physical Security Inspection Date of Inspection: March 24-27, 1986 Dates of Previous Physical Security Inspection: August 27-18, 1985 September 3-6, 1985 Inspectors:
_%
>
G. L. Pirtle P'
Date
- F - Physi 1 Security nspector
,
Y/6 dL s L---~
p@
'B. Drouin Date
--
Physical Security Inspector
&
4 / b !Y b Approved By:
(b
J. R. Creed, Chief Date g
Safeguards Sectiun Inspection Summary Inspection on March 24-27,1986 (Reports No. 50-373/86012(DRSS);
50-374/86012(DRSS))
Areas Inspected:
Included Security Plan and Implementation Procedures; Records and Reports; Testing and Maintenance; Compensatory Measures; Access Control - Personnel; Licensee's Actions on Previous Inspection Findings; and Independent Inspection Effort. The inspection was initiated during the day shift.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined.
(Details - UNCLASSIFIED )
Enclosure contains 8604220130 860416 SAFEGUARDS INFORMTION PDR ADOCK 05000373 Upon separation this PDR O
page is Decontrolled
-
-.
-