w

i

. :

<

AUG 9

1969

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

i

!

'

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2, RESPONSE TO INSPECTION REPORT

NOS. 50-373/87027 AND 50-374/87026

References:

(a)

Letter dated September 11, 1987, J. J. Harrison to Cordell Reed

(b)

Letter dated October 13, 1987, L. D. Butterfield to A. B. Davis

(c) Letter dated January 4, 1988, J. J. Harrison to Cordell Reed

(d) Letter dated March 15, 1989, H. J. Miller to Cordell Reed

(e) Letter dated April 28, 1989, W. E. Morgan to A. B. Davis

(f) Letter dated July 11, 1989, W. E. Morgan to A. B. Davis

,

In reference (a), the NRC brought to your attention a violation of your commitment

to the fire protection program requirements. The violation pertained to the

failure of Procedure No. LOA-FP-01 entitled " Fire Alarm Response" to describe

the need for brigade assistance upon receipt of an alarm in the control room.

This provided for an unacceptable time delay in fire brigade response to a fire

through the allowed and established practice of dispatching an individual to an

alarmed area, without alerting and assembling the fire brigade, after an unplanned

control room annunciation of the activation of a fire detector / alarm. Reference

(b) documented Commonwealth Edison Company's (Ceco) position that a violation

was not warranted.

In Reference (c), the NRC acknowledged the receipt of CECO's

position and indicated that this issue was being referred to NRC Headquarters.

Reference (d) provided the NRC's reaffirmation that a violation of NRC require-

ments had occurred.

In Reference (e), mention was made of the April 13, 1989

.

meeting held between Commonwealth Edison and NRC personnel at NRC Headquarters

'

'

to discuss resolution of this issue. At this meeting it was determined that

Commonwealth Edison would perform an evaluation to identify areas at LaSalle

County Station which needed to have immediate assembly of the fire brigade upon

receipt of an unplanned fire alarm in the control room. This Commonwealth Edison

letter identified certain plant areas needing the assembly of the fire brigade

on an interim basis until a more in-depth analysis was completed. Reference (f)

provided the in-depth analysis which you requested the NRC to review for accept-

i

ability. Since this analysis is being viewed as a deviation from your license

commitment and may have generic applicability, we are forwarding your request

to NRC Headquarters for their review of this issue. Any further correspondence

regarding this issue should be sent to NRC Headquarters through normal

correspondence channels.

r

4

gsquRBs88lb

I6ol

1o

V

o

-

1

I

' ? ,.

.-

,

. - . .

,

Commonwealth Edison Company

2

AUG'9

1939

l

,

1

Should you have any further questions regarding this matter, we will be glad

to discuss them with you.

!

l

Sincerely,

ORIGINAL SIGEND BY T. O. MARTIN (FOR)

H. J. Miller, Director

i

Division of Reactor Safety

cc:

T. Kovach, Nuclear

Licensing Manager

G. J. Diederich, Station

Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

David Rosenblatt, Governor's

Office of Consumer Services

Os

j

Rlll

RIII

RII;

RIII

RI I

RIII

RIII

,

Niie/lc

/#

8/7/89)karison

G d

-

Co

be

n

8/9 /89

8/ /89

/j/89

8/g/89

8/g /89

I

8/7 /89

u_--