Forwards Safety Insp Repts 50-373/90-11 & 50-374/90-11 on 900514-0613.No Violations Noted
ML20055D806
Person / Time
Site: LaSalle  
Issue date: 06/29/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20055D807 List:
References
NUDOCS 9007100037
Download: ML20055D806 (2)


See also: IR 05000373/1990011

Text

i

..

.

'

.

,

.

JUN 2 0 I M

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTH: Mr. Cordell' Reed

Senior Vice President

Opus West 111

1400 Opus place

Downers Grove, IL 60515

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. A.'Hasse,

Ms. P. R. Rescheske, Mr. G. M. Nejfelt and Mr. R. A. Langstaff of this office

on May'14 through June 13, 1990, of activities at LaSalle Nuclear Power Station

Units 1 and 2 authorized by NRC Operating Licenses No. NPF-11 and NPF-18, and

to the discussion of our findings with Mr. G. J. Diederich and others of your -

staff at the conclusion of the on-site portion of the inspection.

,

The purpose of this inspection was to determine if design changes and

i

modifications were being conducted in accordance with regulatory requirements.

>

and to follow up on previously-identified violations and other items of-

concern. Within these areas, the inspection consisted of a selected

examination of procedures and representative records, observations, and

'

interviews with personnel.

No violations of NRC requirements were identified during the course of.this

inspection. Design changes and modifications were being conducted in accordance:

with programmatic and regulatory requirements. Actions on previously-identified

items were appropriate and in most cases complete.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

1

OR CINAL StGNED St CE0tFREY C. CJG'ti.

>

-n

"

Geoffrey C. Wright, Chief

g

Operations Branch

$$$-

Enclosure:

Inspection Reports

$f

No. 50-373/90011(DRS);

i

go

No. 50-374/90011(DRS)

.

M

,

88

See Attached Distribution

'

  • "

'

1

1

111

11

Rlll

I

R

R 1

s49

d/elte

3( t

alstaff

111ps M es

'

"

s

i v

/s?/g0

/21/90-

/27/90

/2 # 90

/29/90

4/2.j/90V/g90

/-f O/; e

-

n1W

r.

ligi

r:

>

s

i

c

.

.

'

..;*

!

. , , ,

,-

j

..

..

,

,-

-

t

!

Conunonwealth Edison Company

2

JUN 2 0E0

'

!

-

i

Distribution'

l

'i

- cc w/ enclosure:

.

.!

'f ,

D.-Galle, Vice President'- BWR,

ij

_ Operations

'

. T.,Kovach, Nuclear

Licensing. Manager,.

G.'J. Diederich, Station-

,

= Manager

- DCD/DCB(RIDS):

.. ..

.

_ .

)

- - '

Licensing Fee Managenwnt Branch

]

- Resident inspector, Rlli

j

Richard llubbard

_

-

.

_j

J. W; McCaffrey, Chief Public

j

- Utilities Division

Patricia O'Brien, Governor's

j

Office of Consumer Services

-

R. Pulsifer, NRR LPM

_

_

!

Robert Newmann, Office of Public

.)

,

Counsel, State'of Illinois Center-

!

-1

.{

-i

-!

Na

-t

?

.

a

>

L

.

,

r

i.l

-

!

. _ .

_

!

!

>

.

'

.

y

'

5

- .

f

^

, .

'

,

1

~

,

.-'

'

'

<

s <

m

p

'

1;

.I

L. :

,,' .

o

-