ML20207J890
| ML20207J890 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/10/1999 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20207J895 | List: |
| References | |
| 50-373-99-01, 50-373-99-1, 50-374-99-01, 50-374-99-1, NUDOCS 9903160426 | |
| Download: ML20207J890 (3) | |
See also: IR 05000373/1999001
Text
_
__
__
_
_
m
_
__ _
,
- pa 44
9
UNITED STATES
$
NUCLEAR REGULATORY COMMISSION
'
[
REGION 111
.y
E
801 WARRENVILLE ROAD
e
LISLE, ILLINOIS 60532-4351
g
4., %.../
March 10, 1999
Nir. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
1
^TTN: Regulatory Services
Executive Towers West 111
1400 Opus Place, Suite 500
Downers Grove,IL 60515
j
SUBJECT:
LASALLE INSPECTION REPORT 50-373/99001(DRP); S0-374/99001(DRP)
Dear Mr. Kingsley:
,
This refers to the inspection conducted January 6 through February 16,1999, at the LaSalle
j
Nuclear Power Station. The purpose of the inspection was to determine whether activities
authorized by the license were conducted safely and in accordance with NRC requirements. At
the conclusion of the inspection, the findings were discussed with those members of your staff
identified in the enclosed report. No cited violations of NRC requirements were identified during
the course of this inspection,
j
Overall, performance of plant personnel was acceptable. Operators were knowledgeable of
plant and equipment status, maintained accurate records, and effectively communicated
operational information. In two instances, which included a loss of the heater drain pump
supply to the reactor feedwater pumps and a decrease in the main condenser vacuum while
realigning the off-gas system, operators appropriately responded to the unplanned plant
transients which resulted from equipment prcolems. The decrease in condenser vacuum was
attributed to the leaking valves in the off-gas system and although the plant responded as
designed, plant material condition impacted operations.
Personnel errors occurred during the inspection period. Inattention to detail and lack of a
questioning attitude by maintenance and operations personnel resulted in lapses in
\\
configuration control and some problems with the foreign material exclusion (FME) program,
g
For exarnple, operators inadvertently drained 25,000 gallons of condensate to the Unit 2
suppression pool through a drain valve that was not closed, construction personnel terminated
electrical leads onto a breaker while out-of-service cards were affixed to the leads, and
maintenance personnel did not adequately secure an FME cover onto a disassembled
emergency core cooling system valve. Although none of the issues was safety significant, they
demonstrated the continuing need for management attention to address human performance at
LaSalle Station.
9903160426 990310
ADG0K 05000373
G
. _ . - - . . - _ . . - _ _ - . - . . -
_
- . - . . .
-
-
. - - . - - . .
. - . . - - . -
..
.
.
.,
e
i
1
O. Kingsley
-2-
)
!
In accordance with 10 CFR 2.790 of the'NRC's " Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
!
!
Sincerely,
j
-
original signed by
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos.: 50-373;50-374
Enclosure:
Inspection Report 50-373/99001(DRP);
50-374/99001(DRP)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Vice President, Regulatory Services
DCD - Licensing
J. Benjamin, Site Vice President
T. O'Connor, Station Manager
!
R. Brady, Jr., Regulatory Assurance Supervisor
M. Aguilar, Assistant Attorney General
State Liaison Officer
i
Chairman, Illinois Commerce Commission
i
DOCUMENT NAME: G:\\LASA\\LAS99001.DRP
To recewe a copy of this document,ind6cate in the box "C" = Copy without attachment / enclosure "E" * Copy with ettschment/ enclosure "N" = No
a
OFFICE
Rlli
gl./
l6- RK
l
Rlll
l
l
NAME
Huber:dp /
Leach
Grant @CL,
DATE
03/ /99
03/ /9D4
0340/9( \\[\\
OFFICIAL RECORD COPY ~ N
_
_
_
__
. . _ _ _
,
.
.
.
. . .-..
._.
-
-.
.-
.
. . - . .
.
. . - .
..
.
.
3
.
.
.
l
i
O. Kingsley
-3-
Distribution:
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
l
J. Caldwell, Rlli w/enci -
B. Clayton, Rlli w/enci
l
BRI LaSalle w/enci
ERP w/ encl
l
DRS (2) w/enci
.
Rlll PRR w/enci'
PUBLIC 1E-01 w/enci
I
!
Docket File w/enci
l
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
j
,
!
l
-
1
'
l
l
i
l
l
i
100003
!
l
l.
i
l
l
1