Forwards Insp Repts 50-373/99-01 & 50-374/99-01 on 990106- 0216.No Violations Identified.Personnel Errors Occurred During Insp Period.Overall Performance of Plant Personnel Acceptable
ML20207J890
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/10/1999
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20207J895 List:
References
50-373-99-01, 50-373-99-1, 50-374-99-01, 50-374-99-1, NUDOCS 9903160426
Download: ML20207J890 (3)


See also: IR 05000373/1999001

Text

_ __ __ _ _ m _ __ _

  1. pa 449$ UNITED STATES

,

'

NUCLEAR REGULATORY COMMISSION

[ REGION 111

.y E 801 WARRENVILLE ROAD

g e LISLE, ILLINOIS 60532-4351

4., %.../ March 10, 1999

Nir. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company 1

^TTN: Regulatory Services

Executive Towers West 111

1400 Opus Place, Suite 500

l

Downers Grove,IL 60515 j

SUBJECT: LASALLE INSPECTION REPORT 50-373/99001(DRP); S0-374/99001(DRP)

Dear Mr. Kingsley: ,

l

This refers to the inspection conducted January 6 through February 16,1999, at the LaSalle j

Nuclear Power Station. The purpose of the inspection was to determine whether activities I

authorized by the license were conducted safely and in accordance with NRC requirements. At

the conclusion of the inspection, the findings were discussed with those members of your staff

identified in the enclosed report. No cited violations of NRC requirements were identified during

the course of this inspection, j

Overall, performance of plant personnel was acceptable. Operators were knowledgeable of

plant and equipment status, maintained accurate records, and effectively communicated  !

I

operational information. In two instances, which included a loss of the heater drain pump

supply to the reactor feedwater pumps and a decrease in the main condenser vacuum while

realigning the off-gas system, operators appropriately responded to the unplanned plant

transients which resulted from equipment prcolems. The decrease in condenser vacuum was

attributed to the leaking valves in the off-gas system and although the plant responded as

designed, plant material condition impacted operations.

Personnel errors occurred during the inspection period. Inattention to detail and lack of a l

questioning attitude by maintenance and operations personnel resulted in lapses in

configuration control and some problems with the foreign material exclusion (FME) program,

\g

For exarnple, operators inadvertently drained 25,000 gallons of condensate to the Unit 2

suppression pool through a drain valve that was not closed, construction personnel terminated

electrical leads onto a breaker while out-of-service cards were affixed to the leads, and

maintenance personnel did not adequately secure an FME cover onto a disassembled

emergency core cooling system valve. Although none of the issues was safety significant, they

demonstrated the continuing need for management attention to address human performance at

LaSalle Station.

!

l

l

9903160426 990310

PDR ADG0K 05000373

G PDR

. _ . - - . . - _ . . - _ _ - . - . . - _ - . - . . . - - . - - . - - . . . - . . - - . - ..

.

.

., e

i

1

O. Kingsley -2- )

!

!

In accordance with 10 CFR 2.790 of the'NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.  !

!

Sincerely, j

-

original signed by

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-373;50-374

License Nos.: NPF-11; NPF-18

Enclosure: Inspection Report 50-373/99001(DRP);

50-374/99001(DRP)

cc w/ encl: D. Helwig, Senior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Vice President, Regulatory Services l

DCD - Licensing

J. Benjamin, Site Vice President

T. O'Connor, Station Manager  !

R. Brady, Jr., Regulatory Assurance Supervisor

M. Aguilar, Assistant Attorney General

State Liaison Officer i

Chairman, Illinois Commerce Commission

i

DOCUMENT NAME: G:\LASA\LAS99001.DRP

To recewe a copy of this document,ind6cate in the box "C" = Copy without attachment / enclosure "E" * Copy with ettschment/ enclosure "N" = No

a

OFFICE Rlli gl./ l6- RK l Rlll l l

NAME Huber:dp / Leach Grant @CL,

DATE 03/ /99 03/ /9D4 0340/9( \[\

OFFICIAL RECORD COPY ~ N

_ _ _ __ . . _ _ _

, . . . . . .-.. ._. - -. .- . . . - . . . . . - . ..

. .

.

3 . .

l

i

O. Kingsley -3-

Distribution: I

SAR (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

l

J. Caldwell, Rlli w/enci -

B. Clayton, Rlli w/enci

l BRI LaSalle w/enci

ERP w/ encl

l

DRS (2) w/enci

.

Rlll PRR w/enci'

PUBLIC 1E-01 w/enci I

! Docket File w/enci

l GREENS

LEO (E-Mail)

DOCDESK (E-Mail) j

,

! l

-

l

I

'

1

l

l

l

!

i

l

l

!

i

l

I

l

! 100003

l

l.

i

l

l

1