U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-373/86041(DRSS); 50-374/86041(DRSS)
Docket Nos. 50-373; 50-374 Licenses No. NPF-11; NPF-18 Safeguards Group IV Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:
LaSalle County Station, Units 1 and 2 Inspection At:
LaSalle County, Illinois Type of Inspection: Urannounced Physical Security Dates of Inspection: October 27-31, 1986 Dates of Previous Physical Security Inspection: July 28 through August 1, 1986 Inspectors:
[
M96 W.L.Pirtle Date
'
fPhysicalSecurityInspector hhh Iff2 eft 6
'
. Drouin Date ysical Security Inspector Approved By:
pf.R. Creed, Chief Date 3'afeguards Section
!
Inspection Summary i
Inspection on October 27-31, 1986 (Reports No. 50-373/86041(DRSS);
'
No. 50-374/86041(DR5S))
Areas Inspected:
Included a review of the licensee's actions on previous inspection findings; Management Effectiveness-Security Program; Security Organization; Security Program Audits; Records and Reports; Testing and Maintenance; Compensatory Measures; Assessment Aids; and Alarm Stations.
The inspection was conducted by two NRC inspectors and the inspection was initiated during the day shift.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below:
Assessment Aids: Assessment capabilities upon initiation of some alarms did not meet security plan criteria (refer to Paragraph 7 of the Report Details).
Er. closure contatns g2OgDgggggoobO73 Upon separation this G
PDR page is Decontrolled i
_ _ _ _ _ - - - _ _ _ _ _ - - _
_
.
.
Eight previous inspection findings were closed.
The licensee's progress in resolving an area of concern pertaining to improved close circuit television assessment capability was reviewed.
Progress toward improved power supply for the security radio net was also reviewed. Both issues warrant increased management support. Areas to be strengthened programmatically in security audits were also discussed.
(Details - UNCLASSIFIED )