_ __
os urg\\
hcfqt Y f/
UNITED STATES I
+- '[
g NUCLEAR REGULATORY COMMISSION Ce j
WASHINGTON, D. C. 20555 i
/
\\
- ++
June 16, 1989 I
i Docket No. 50-374 i
Mr. Thomas J. Kovach j
' Nuclear Licensing Manager Commonwealth Edison Company l
Post Office Box 767 1
Chicago, Illinois 60690
Dear Mr. Kovach:
SUBJECT:
REQUEST FOR TEMPORARY WAIVER FOR COMPLIANCE FROM TECHNICAL I
SPECIFICATION 3.8.1.1 REGARDING-DEM0t!STRATING OPERABILITY OF
-)
REMAINING EMERGENCY AC POWER SOURCES WITH DIESEL GENERATOR 2B i
INOPERABLE - LASALLE COUNTY STATION UNIT 2 i
By letter dated June 16, 1989, Ccrmonwealth Edison Company (CECO, the licensee) i requested a Temporary Waiver of Compliance from'the LaSalle Unit 2 Technical ~
j Specification (TS) 3.8.1.1 Action e which requires, if diesel generator 2B.
1 is inoperable, that the operability be demonstrated for the remaining two i
diesel generators for Unit 2 by starting each generator,'one at a time, at l
1 east once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter in accordance with TS 4.8.1.1.2.a.4.
The NRC staff has agreed to grant a Temporary Waiver of Compliance for LaSalle County Station Unit 2 from Action e of Specification 3.8.1.1 which would.
i forego the once per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> testing requirement for the remaining two diesel generators to demonstrate operability. This Temporary Waiver of Compliance is effective beginning June 16, 1989 and is effective until issuance of the amendment. This Temporary Waiver of Compliance is granted to eliminate the multiple testing requirements to demonstrate operability on the remaining Unit 2 diesel generators during the duration of this LCO. This waiver is consistent with the NRC position contained in Generic Letter 84-15 which states that fast start testing of emergency diesel generators should be reduced so that mechanical stress and wear in diesel engines are minimized and relia-
{
bility is not diminished.
l L
It was further agreed that Ceco would submit a supplement to the existing l
diesel generator Technical Specification amendment submittal dated March 16, 1989 in response to GL 84-15 by June 23, 1989 that would eliminate these unnecessary testing requirements and that would also address the testing requirements for all five diesel generators for both units, bp 8906260197 890616
'I PDR ADOCK 05000374 p
PDL.
i i
Mr. Thomas J. Kovach )
The management of CECO should note that its submittal in response to GL 84-15 for a Technical Specification change was deficient in that it failed to f
provide.the changes that are required by this waiver. Had the appropriate i
changes been identified in your submittal, this waiver could have been avoided.
I Sincerely, l
i l
B ron L. Sie 1, Acting Assistant Director for Regions III and V l
Division of Reactor Projects III, IV, V, and Special Projects.
Office of Nuclear Reactor Regulation cc: See next page f
1
/
)
l 1
l l
i i
1
Mr. Thomas J. Kovach LaSalle County Nuclear Power Station Commonwealth Edison Company Units 1 & 2 cc:
Phillip P. Steptoe, Esquire John W. McCaffrey Sidley and Austin Chief, Public Utilities Division One First National Plaza 501C Chicago, Illinois 60603 100 West Randolph Street Chicago, Illinois 60601 Assistant Attorney General i
100 West Randolph Street 1
Suite 12 i
Chicago, Illinois 60601 Resident Inspector /LaSalle, NPS U.S. Nuclear Regulatory Commission Rural Route No. I i
P. O. Box 224 Marseilles, Illinois 61341 Chairman LaSalle County Board of Supervisors I
LaSalle County Courthouse Ottawa, Illinois 61350 Attorney General 500 South 2nd Street Springfield, Illinois 62701 Chairman Illinois Comerce Comission Leland Building 527 East Capitol Avenue Springfield, Illinois 62706 Mr. Michael C. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outt:r Park Drive 5th Floor Springfield, Illinois 62704 Regioreal Administrator, Region III U. S. Nuclear Regulatory Comission 799 Roosevelt Road, Bldg. f4 Glen Ellyn, Illinois 60137
June 16j1989
$r.ThomasJ.Kovach The management of CECO should note that its submittal in response to GL'84-15
.for a Technical Specification change was deficient in that~it failed to provide the changes that are required by this waiver. Had the appropriate
' changes been identified in your submittal, this waiver could have.been avoided.
Sincerely, 1
Byron L. Siegel, Acting Assistant Director for Regions III and V Division of' Reactor Projects IZI, j
IV, V, and Special Projects Office of Nuclear Reactor Regulation
?
cc: See next page
.l DISTRIBUTION Docket file BGrimes NRC & Local PDRs ACRS (10)
PDIII-2 r/f Plant file MVirgilio PShemanski LLuther BSiegel BSiegel EJordan i
l l
1 PDIII-2 hh PDIII PDIII-2 PDIII-2
/
LLuther:
BSiegel PShemansk MVirgilio 6/ / 6 /89 6//A /89 6//(, /89 6/[(f/89 6861 '9I aune