W
,
,
JAN 21 1987
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Pcs t Office Box 767
Chicago, IL 60690
Ger.tlemen:
SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORTS N0. 50-373/86040
AND NO 50-374/86040)
This refers to the inspections conducted during the period October 8 through
November 17, 1986, of activities authorized by NRC Operating Licenses
No. NPF-11 and No. NPF-18 for the LaSalle County Nuclear Power Station,
Units 1 and 2.
The inspection identified one procedural violation and one
Technical Specification violation during the performance of a surveillance
test on the Residual Heat Removal System for Unit i on October 17, 1986.
As stated in our correspo dence to you dated December 2, 1986, the two
violations were under corsideration for escalated enforcement action. As
a result of our review ve have decided to issue one Severity Level IV
violation for the Techrscal Specification violation and request an enforcement
conf,erence on the procedural violations.
The procedure violation concerns
issues which have occurred in the past and corrective actions have not been
effective in prevent 11g their recurrence.
The subject of the violation was
failure of the contr(1 room operator to recognize off normal conditions and
failure to perform a proper second verification.
A telephone convers.ition was held between Mr. G. Wright of my staff and
Mr. Turbak of your staff and it is our understanding that February 13, 1987,
at 2:00 p.m. (CST) in the Region III office in Glen Ellyn, IL would be an
acceptable date f ar an enforcement conference. Be prepared to discuss the
actions you have taken or plan to take to prevent recurrence of these problems.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to take to prevent recurrence.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
A
,qC
B701290078 870121
ADOCK 05000373
G
FDR
j
// /
..
.
.
J AN 2~1 1987
Commonwealth Edison Company
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ORIGUTAL SIGNED BY C. E. NORELIUS
Charles E. Norelius, Director
Division of Reactor Projects
Enclosure: Notice of
Violation
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
G. J. Diederich, Plant
Manager
.
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
David Rosenblatt, Governor's
Office of Consumer Services
3
RII
RIIISN
R I
Rvr .
b
u.,,,a k
[J8
,
,h
ht/jr
4 41
nti
ius
abo
\\\\QY)
t/ *
7
gko a1
lj2ije7