Forwards SE Accepting one-time Request for Relief from Certain Provisions of Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a for Certain Plant Safety/Relief Valves
ML20198B374
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 12/14/1998
From: Richards S
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20198B377 List:
References
TAC-MA3758, NUDOCS 9812180154
Download: ML20198B374 (5)


Text

~

.~

- -. - - - -.. - -. - - - - -. - -. ~

December 14, 1998 Mr. Oliv;r D. Kingsity, Pr:sid:nt Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

EVALUATION OF INSERVICE TESTING RELIEF REQUEST - LASALLE COUNT / STATION, UNIT 1 (MA3758)

Dear Mr. Kingsley:

By letter dated October 8,1998, Commonwealth Edison Company (Comed) submitted a one-time request for relief from certain provisions of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) pursuant to 10 CFR 50.55a for certain plant safety / relief valves.

As required by 10 CFR 50.55a, inservice testing (IST) of certain ASME Code Class 1,2, and 3 pumps and valves must be performed in accordance with Section XI of the ASME Code, except where altematives are authorized or relief is granted by the Commission pursuant to paragraphs (a)(3)(l), (a)(3)(li), or (f)(6)(i). In order to obtain authorization or relief, the licensee must demonstrate that (1) the proposed alternatives provide an acceptable level of quality and safety, (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, or (3) conformance is impractical for its facility.

Guidance on acceptable altematives to Section XI requirements for certain aspects of the IST program was provided by the NRC in Generic Letter 89-04.

The staff has reviewed the relief request proposed in your letter of October 8,1998. The alternative you have proposed (a two-month extension of the interval) to the ASME Code testing of the main stesim line safety relief va;ves is authorized pursuant to 10 CFR 50.55a(a)(3)(li) in that compliance with the code require ments would result in hardship without a compensating increase in the level of quality and safety. The specific details are contained in the enclosed safety evaluation.

Sincerely, ORIG. SIGNED BY

\\

Stuart A. Richards, Project Director i

Project Directorate lll-2 Division of Reactor Projects - lilllV Office of Nuclear Reactor Regulation

\\

Docket No. 50-373 Distribution:

poestFNG PUBLIC PDill-2 r/f

Enclosure:

Safety Evaluation E. Adensam S. Richards C. Moore

- D. Skay OGC ACRS cc w/ encl: See next page G. Hammer R. Lanksbury, Rill R. Wessman DOCUMENT NAME: G:\\PDill-2\\CM\\LASALLE\\LA3758.RLF See previous concurrence

  • 4

- To receive a copy of this document, Irw Ggte hghe box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE -

PM:PDill-2 AMll-2 L.BC:EMEB OGC-D:PDill-2 6

s NAME DSKAYG F

!W4D$ptE RWESSMAN*

MYoung*

SRICHARDSM DATE 12/ (O /98 1264 /98 11/12/98 11/25/98 12/ Ff /98 OFFICIAL RECORD COPY -

9812190154 961214 PDR ADOCK 05000373 gg P

PDR

}' } ((

g

Mr. Oliv r D. Kingsley, Pr2sid:nt Nuclear Generation Group.

Commonwealth Edison Company Executive Towers West ll1 1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

EVALUATION OF INSERVICE TESTING RELIEF REQUEST - LASALLE COUNTY STATION, UNIT 1 (MA3758)

Dear Mr. Kingsley:

By letter dated October 8,1998, Commcnwealth Edison Company (Comed) submitted a one-time request for relief from certain provisions of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) pursuant to 10 CFR 50.55a for certain plant safety / relief valves.

As required by 10 CFR 50.55a, inservice testing (IST) of certain ASME Code Class 1,2, and 3 pumps and valves must be performed in accordance with Section XI of the ASME Code, except where attematives are authorized or relief is granted by the Commission pursuant to paragraphs (a)(3)(i), (a)(3)(h), or (f)(6)(i). In order to obtain authorization or relief, the licensee must demonstrate that (1) the proposed alternatives provide an acceptable level of quality and safety, (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, or (3) conformance is impractical for its facility.

Guidance on acceptable alternatives to Section XI requirements for certain aspects of the IST program was provided by the NRC in Generic Letter 89-04.

The staff has reviewed the relief request proposed in your letter of October 8,1998. The altemative you have proposed to the ASME Code testing of the main steam line safety relief valves is authorized pursuant to 10 CFR 50.55a(a)(3)(li) In that compliance with the code requirements would result in hardship without a compensating increase in the level of quality and safety.' The speci*c deteils are contained in the enclosed safety evaluation.

Sincerely,

/

Stuart A. Richards, Project Director Project Directorate lil-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-373 Distribution:

Docket File PUBLIC PDill-2 r/f

Enclosure:

Safety Evaluation E. Adensam S. Richards C. Moore D. Skay OGC ACRS cc w/ encl: See next page /

G. Hammer R. Lanksbury, Rlli DOCUMENT NAME: G:\\PDlll-2\\CM\\LASALLE\\LA3758.RLF 4A.f To r:ceive a copy of this document. Indigste in the box: "C" = Copy without enclosures *E" = Coptwith enclosures "N" = No copy OFFICE PM:PDill-2 Le LA:PDlll-2 OBC:EMEB A f.

O G 6 P "'

D:PDill-2 NAME DSKAY %/'W Qd60kE RWESSQMH

//7/gtsy SRICHARDS DATE 11/ A/98 11/ l0Y98 11/ 1> /98 11bg /98 11/

/98 OFFICIAL RECORD COPY

~

evnu a

k UNITED STATES

/

g NUCLEAR REGULATORY COMMISSION

[

4 WASHINGTON, D.C. 3000641001 i

December 14, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company l

Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

EVALUATION OF INSERVICE TESTING RELIEF REQUECT - LASALLE COUNTY STATION, UNIT 1 (MA3758)

Dear Mr. Kingsley:

By letter dated October 8,1998, Commonwealth Edison Company (Comed) submitted a one-time request for relief from certain provisions of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) pursuant to 10 CFR 50.55a for certain plant safety / relief valves.

As required by 10 CFR 50.55a, inservice testing (IST) of certain ASME Code Class 1,2, and 3 i

pumps and valves must be performed in accordance with Section XI of the ASME Code, except wnere attematives are authorized or relief is granted by the Commission pursuant to paragraphs (a)(3)(i), (a)(3)(ii), or (f)(6)(i). In order to obtain authorization or relief, the licensee must demonstrate that (1) the proposed allematives provide an acceptable level of quality and safety, (2) complunce would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, or (3) mnformance is impractical for its facility.

Guidance on acceptable altematives to Section XI requirements for certain aspects of the IST program was provided by the NRC in Generic Letter 89-04.

The staff he reviewed the relief request proposed in your letter of October 8,1998. The attemative you have proposed (a two-month extension of the interval) tn the ASME Code testing of the main steam line safety relief valves is authorized pursuant to 10 CFR 50.55a(a)(3)(li) in that compliance with the code requirements would result in hardship without a compensating increase in the level of quality and safety. The specific details are contained in the enclosed safety evaluation.

Sincerely, Stuart A. Richards, Project Director Project Directorate lll-2 l

Division of Reactor Projects - Ill/lV Office of Nuclear Reactor Regulation

(!-

Docket No. 50-373 l'

[

Enclosure:

Safet" Evaluation cc w/ encl: Se, t ext page

-.~. - -

i l

0. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 cc:

I Phillip P. Steptoe, Esquire Michael 1. Miller, Esquire Sidley and Austin Sidley and Austin L

. One First National Plaza C, First National Plaza Chicago, Illinois 60603 Chicago, Illinois 60603 Assistant Attomey General Document Control Desk-Licensing 100 W. Randolph St. Suite 12 Commonwealth Edison Company Chicago, Illinois 60601 1400 Opus Place, Suite A00 Downers Grove, Illinois 60515 l

U.S. NRC-LaSalle Resident inspectors Office 2605 N. 21st Road Commonwealth Edison Company l

Marseilles, Illinois 61341-9756 Site Vice President-LaSalle 2601 N. 21st Road Chairman Marseilles, lilinois 61341-9757

. LaSalle County Board of Supervisors LaSalle County Courthouse Mr. David Helwig Ottawa, Illinois 61350 Senior Vice President Commonwealth Edison Cognpany Attomey General Executive Towers West lil 500 S. Second Street 1400 Opus Place, Suite 900 l

Springfield, Illinois 62701 Downers Grove,IL 60515 Chairman Mr. Gene H. Stanley lilinois Commerce Commission PWR's Vice President 527 E. Capitol Avenue, Leland Building Commonwealth Edison Company Springfield, Illinois 62706 Executive Towers West lli 1400 Opus Place, Suite 900 lilinois Department of Nuclear Safety Downers Grove,IL 60515 Office of Nuclear Facility Safety 1036 Outer Park Drive Mr. Stave Perry l

Springfield, Illinois 62704 BWR's Vice President i

Commonwealth Edison Company l

- Regional Administrator Executive Towers West lll j.

U.S. NRC, Region 111 1400 Opus Place, Suite 900

)

801 Warrenville Road.

Downers Grove,IL 60515

]

Lisle, lilinois 60532-4351 Mr. Dennis FFrar

)

Commonwealth Edison Company Regulatory Services Manager LaSalle Station Manager Commonwealth Edison Company i

2601 N. 21st Road Executive Towers West lil L

Marseilles, Illinois 61341-9757 1400 Opus Place, Suite 500 i

Downers Grove,IL 60515 Robert Cushing, Chief, Public Utilities Division Illinois Attomey General's Office 100 W. Randolph Street l

Chicago, Illinois 60601 4

i

-. -. ~...... -. -.. -.~ --.. -.....

j O. Kingsley LaSalle County Station Commonwealth Edison Company 2-Units 1 and 2 Ms. Irene Johnson, Licensing Director Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500

)

Downers Grove,IL 60515 Commonwealth Edison Company Reg. Assurance Supervisor-LaSalle 2601 N. 21st Road Marseilles, Illinois 61341-9757 Mr. Michael J. Wallace i

Senior Vice President j

Commonwealth Edison Company e

Executive Towers West lli 1400 Opus Place, Suite 900 Downers Grove,IL 60515 J

(

l I

e l'

1 i

l i

4 E

'e '

I E

"*=--*w<

v49 4