May 14, 1999
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West lll
1400 Opus Place, Suite 500
Downers Grove,IL 60515
SUBJECT:
LASALLE SECURITY INSPECTION REPORT 50-373/99010(DRS);
50-374/99010(DRS)
Dear Mr. Kingsley:
On April 26,1999, the NRC completed an inspection at your LaSalle Nuclear Generating Plant
reactor facility. The enclosed report presents the results of that inspection.
Areas examined within your security program are identified in the report. Within those areas,
the inspection consisted of a selective examination of procedures and representative records,
observation of performance, and interviews with staff. The objective of the inspection effort was
to determine whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
Based on the results of this inspection, the NRC has determined that a previously unresolved
item involving the failure to adequately implement your Fitness-for-Duty (FFD) program is a
l
Non-Cited Violation for which no response is necessary (Section S8.5). Mr. Brady of your staff
discussed this issue with us. Although this matter relates to a previously cited violation, our~
,
additional review determined that the facts relating to the three additional contractors who did
d
not report potential violations were separate from the initial issue. The corrective action you
took for the initial issue was extensive and comprehensive, and adequately prevented future
violations. Consequently, in accordance to Appendix C of the NRC enforcement policy, the
matter will be dispositioned as a Non-Cited Violation.
Your physical securiy program was determined to have met regulatory requirements, with
security force perforn'ance and your self-assessment program being strengths. We did note,
however, that deficiencies in the security lighting system have required you to implement
compensatory measures for a long period of time.
1
1
9905210151 990514
y
ADOCK 05000373
3
!
e
pg
)
)
r
.
.
O. Kingsley
-2-
If you contest the violation or severity level of the Non-Cited Violation, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to the
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001,
with a copy to the Regional Administrator, Region 111, and the Director, Office of Enforcement,
United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
i
enclosure will be placed in the NRC Public Document Room.
{
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original /s/ James R. Creed
James R. Creed, Safeguards Team Leader
.
Division of Reactor Safety
Docket Nos. 50-373; 50-374
Enclosure:
Inspection Report 50-373/99010(DRS);
50-374/99010(DRS)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Vice President, Regulatory Services
DCD - Licensing
J. Benjamin, Site Vice President
)
T. O'Connor, Station Manager
R. Brady, Jr., Regulatory Assurance Supervisor
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
DOCUMENT NAME: G:DRS\\LAS99010.wpd
To receive a copy of this cocument, indicate in the box: "C" a Copy wthout attachment / enclosure 'li" s Copy wth attachment /endosure
"N" a No copy
OFFICE
R!ll Jfx14g
l6 Rlli
lN RlllQ7gA
/l
l
NAME h GPirtle:tb
MLeach p;' A 2
JCre6d
d
DATE (/ 05/12/99
05/4/99
05N /99
OFFICIAL RECORD COPY
.
.
O. Kingsley
-3-
Distribution:
AJM (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
B. Clayton, Rlll w/enct
SRI LaSalle w/enci
DRP w/ enc!
DRS w/enci
r
Rlll PRR w/ encl
v
PUBLIC lEff4/enci
,
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
/
\\
'
am