ML20154B012

From kanterella
Revision as of 16:01, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-293/88-07 on 880120-0305 & Notice of Violation.Supplemental Response Re Overtime Implementation,Per Generic Ltrs 82-12 & 83-14,requested within 30 Days
ML20154B012
Person / Time
Site: Pilgrim
Issue date: 05/06/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20154B016 List:
References
GL-82-12, GL-83-14, NUDOCS 8805170030
Download: ML20154B012 (3)


See also: IR 05000293/1988007

Text

r3 0

4

. Y

.

MAY 061988

Docket No. 50-293

Boston-Edison Company-

ATTN: Mr. Ralph G. Bird:

Senior Vice President - Nuclear

800 Boylston Street

Boston, Massachusetts 02199

' Gentlemen:

Subject: NRC Region I Inspection Report No. 50-293/88-07

This refers to the routine safety inspection (50-293/88-07) conducted by

Messrs. C. Warren, J. Lyash and T. Kim of this office on January 20,1988 to

March 5,1988, at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts.

Areas examined. during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter.

In regard to the control of overtime at' Pilgrim Station, the inspection con-

firmed that -your program, as currently documented, meets the guidelines

promulgated in Generic Letters 82-12 and 83-14. However, program implementa-

tion had been such that it did not appear to have been fully meeting the intent

of NRC guidelines. As documented in Section 5, we understand that you have

agreed to supplement the response to this item provided in your October 28, 1987

letter. Please provide this supplemental response within 30 days' of the date

of this letter.

Based on the results of this inspection, it appears that certain maintenance

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation enclosed herewith as Appendix A, Failure to

establish adequate procedures and to . perform adequate technical review were

evident during the blackout diesel generator testing and the plant process

computer point tie-in activities. In addition, ' poor preplanning and control-

of maintenance resulted in an unnecessary engineered safety feature actuations

during an electrical relay replacement. Weaknesses in control of maintenance

was the subject of a previous violation as documented in the inspection report

50-293/87-50.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY IR PILGRIM 88-07 - 0001.0.0

04/22/88 l l

8805170030 880506

JDR ADOCK0500g2j3 M8

_ _ ~ _ _ _

~_ ,

l

4,

'

Boston Edison Company 2

MAY 061988-

.

Your cooperation with us in this matter is appreciated.

Sincerely,

7:3gpal wa ^yyy /

?6 w W'

'

v- Samuel J. Collins, Deputy din etor

Division of Reactor Projecti

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report No. 50-293/88-07

_cc w/encis:

_ K. Highfill, Station Director-

.R. Anderson, Nuclear Operations Manager

B. McIntyre, Chairman, Department of Public Utilities

J. Keyes, Boston Edison Regulatory Affairs and Programs

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

S. Pollard, Secretary of Energy Resources

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

R. Shimshak, MASSPIRG

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

0FFICIAL RECORD COPY IR PILGRIM 88-07 - 0002.0.0

05/06/88

-

-4,

..,

Boston Edison Company 3

K 061988

e,  ;

bec w/encis:

Region.I Docket Room (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o encis)

W. Russell, RA

S. Collins, DRP

J. Wiggins, DRP

R. Blough, DRP

L.' Doerflein, DRP-

M. Kohl, DRP

,R. Bores, DRSS

C. Tinkler, NRR

M. Thadani, NRR

D. Mcdonald, NRR

TI Coordinator, DRP

X

0+\TRI:DRP RI:DRP /RI:DRP 'i[

,

CWarren/mjd R81ough piggins 4 , J1 ns

4dj788 ^

'00 N/)/88 [ // /88

Jf'6/#OFFICIAL RECORD COPY IR PILGRIM 88-07 - 0003.0.0

04/14/88