ML20147C612
ML20147C612 | |
Person / Time | |
---|---|
Site: | Waterford ![]() |
Issue date: | 02/24/1988 |
From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Dewease J LOUISIANA POWER & LIGHT CO. |
References | |
NUDOCS 8803030116 | |
Download: ML20147C612 (2) | |
Similar Documents at Waterford | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L0421999-10-21021 October 1999
[Table view]Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re EFAS, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits1999-06-24024 June 1999 Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits ML20196G5731999-06-24024 June 1999 Forwards Operator Licensing Exam Outlines Associated with Exam Scheduled for Wk of 991004.Exam Development Is Being Performed in Accordance with NUREG-1021,Rev 8 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20058E8621990-11-0101 November 1990
[Table view]Forwards Understanding of Current Status of Unimplemented GSIs at Facility,Per 900626 Response to Generic Ltr 90-04. Timely Completion of Encl GSIs Urged ML20058G1561990-10-31031 October 1990 Requests That Matl Listed in Encl 1, Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exams, Be Furnished by 901207 for Retake of Operating Exams Scheduled for 910122 ML20058B3101990-10-23023 October 1990 Forwards Insp Rept 50-382/90-22 on 900905-1001 & Notice of Violation ML20058B2681990-10-17017 October 1990 Informs That Util Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2 Part 2, Vendor Interface for Safety-Related Components, Acceptable IR 05000382/19900231990-10-17017 October 1990 Submits Revised Schedule for Electrical Distribution Sys Functional Insp 50-382/90-23.Insp Team Will Arrive at Plant Site on 910107 ML20058A6711990-10-16016 October 1990 Forwards Insp Rept 50-382/90-21 on 900910-14.No Violations or Deviations Noted IR 05000382/19900171990-10-16016 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/90-17 ML20062B6231990-10-12012 October 1990 Confirmation of Action Ltr CAL-90-06,confirming That Plant Will Not Enter Mode 2 Until NRC Confirms Actions Assuring That Adequate Safety Exists for Continued Power Operation ML20059N7041990-10-10010 October 1990 Ack Receipt of Util 900717 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20059K8651990-09-14014 September 1990 Forwards Interfacing Sys LOCA Insp Rept 50-382/90-200 on 900730-0810.Deficiencies in Availability of Design Calculations,Check Valve Maint & Plant Equipment Labeling Noted ML20059K3601990-09-14014 September 1990 Ack Receipt of Scenario for 1990 Emergency Preparedness Exercise ML20059D5901990-08-28028 August 1990 Forwards Insp Rept 50-382/90-17 on 900625-29.No Violations or Deviations Noted.Exercise Weakness Re Performance of Emergency Responders Noted ML20056B4841990-08-22022 August 1990 Forwards Errata to Amend 62 to License NPF-38,consisting of Revised Bases Page Re Time Intervals for Surveillance Requirements,Per 900717 Application & Generic Ltr 89-14 ML20056B2731990-08-16016 August 1990 Ack Receipt of 900720 & 0803 Ltrs Re Objectives & Guidelines for Annual Emergency Preparedness Exercise.Objectives Appear Reasonable.Exercise Scenario & Associated Matls Should Be Submitted at Least 60 Days Prior to Exercise for NRC Review ML20058P3441990-08-15015 August 1990 Advises That Although Adequate Info Provided to Justify Continued Plant Operation Until Plant Completes Final Rept Per Schedule Delineated by NRC Bulletin 88-11,adequate Bases Not Provided for 40-yr Plant Life ML20056A0301990-07-30030 July 1990 Forwards Insp Rept 50-382/90-11 on 900625-29.No Violations or Deviations Noted ML20055G7951990-07-19019 July 1990 Forwards Insp Rept 50-382/90-14 on 900625-29 & Notice of Violation.Actions Taken Re Previously Identified Insp Findings Also Examined ML20055E6501990-07-0909 July 1990 Discusses Generic Implications & Resolutions of Control Element Assembly (CEA) Failures at Maine Yankee.Waterford Unit 3 Does Not Have Old Style CEAs Installed in Reactor Core & Does Not Plan to Use Any in Future ML20055C9751990-06-26026 June 1990 Forwards Page 6a for Insertion in Insp Rept 50-382/90-09 ML20043H8331990-06-21021 June 1990 Forwards Notice of Withdrawal of Application for Amend 60 to License NPF-38,per ML20043G9471990-06-15015 June 1990 Advises That Use of Existing 2-inch Line Currently Providing Refueling Water Level Indication Sys Indication Acceptable as Common Header or Tap for Two Sys ML20055C7781990-06-15015 June 1990 Forwards Insp Rept 50-382/90-09 on 900501-31.No Violations or Deviations Noted.One Unresolved Item Identified.Licensee Test Acceptance Criteria Did Not Appear to Account for Effect of Flow on Valve Closing Time ML20059M9171990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20043E7241990-06-0707 June 1990 Forwards Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exams During Wk of 900910 ML20043D5381990-06-0404 June 1990 Advises That 900327 & 0410 Rev 10,Changes 3 & 4 to Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20043B5071990-05-23023 May 1990 Discusses Util 891226 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. NRC Position on Questions Presented During Sept 1989 Workshop Will Be Issued as Suppl to Generic Ltr ML20043B4621990-05-23023 May 1990 Fowards Summary of 900508 Mgt Meeting Re General Items of Interest at Plant.Attendance List Encl ML20043C1081990-05-23023 May 1990 Forwards Insp Rept 50-382/90-08 on 900416-20.No Violations or Deviations Noted ML20043B4821990-05-22022 May 1990 Forwards Insp Rept 50-382/90-07 on 900401-30.No Violations or Deviations Noted ML20042G1241990-05-0404 May 1990 Forwards Insp Rept 50-382/90-05 on 900301-31.No Violations or Deviations Noted.Concern That Failure to Follow Surveillance Procedures Could Preclude Identification of Nonfunctioning Safety Features Addressed ML20043A1761990-05-0303 May 1990 Requests That Util Confirm Understanding Re Rev 6,Change 1 to Inservice Testing Program,Per .Rev 6 & Change 1 Appears to Revise Approved Program & Includes Only Three New Relief Requests Not Yet Acted Upon ML20042F2431990-04-27027 April 1990 Forwards Insp Rept 50-382/90-06 on 900326-30.No Violations or Deviations Noted ML20042E7271990-04-26026 April 1990 Requests That Util Review Info in Encl Synopsis of Investigation Rept 4-88-020 Re Circuit Breakers Mfg by Heinemann Electric Co ML20034C5871990-04-26026 April 1990 Informs of Issuance of NUREG/BR-0122, Examiners Handbook for Developing Operator Licensing Written Exams ML20034B7861990-04-23023 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in 900208 Notice of Violation. Implementation of Corrective Actions Will Be Reviewed During Future Insp ML20034B3781990-04-19019 April 1990 Forwards FEMA to NRC & Radiological Emergency Preparedness Exercise Rept & Drills Held on 891107-08 & 1207.No Deficiencies Identified During Exercise ML20034B2201990-04-12012 April 1990 Advises That Util 900129 Response to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations Acceptable,Based on Certification That Listed Actions Completed ML20033H0011990-04-0505 April 1990 Advises That Next Generic Fundamentals Exam Section of Written Operator Licensing Exam Scheduled for 900606. Nomination Ltrs Requested by 900507.Sample Nomination Ltr Encl ML20033H2601990-04-0404 April 1990 Requests Addl Info Re 891016 Proposed Amend,Extending Test Frequency of Channel Functional Tests for ESFAS & Reactor Protection Sys Instrumentation.Instrument Drift Info for Each Instrument Channel Involved Must Be Reviewed ML20042D8471990-03-30030 March 1990 Forwards Insp Rept 50-382/90-02 on 900129-0202.No Violations or Deviations Noted.Insp Reviewed Certain Areas of Physical Security Program & Matl Control & Accountability Program ML20012E7711990-03-28028 March 1990 Forwards Region IV Organization Charts Re Reorganization of Site Responsibilities for Div of Reactor Projects, Effective 900326 ML20012C1201990-03-0909 March 1990 Forwards NRC Understanding of Current Status of Unimplemented USIs for Plant,Based on 891129 Response to Generic Ltr 89-21,review of NRC Records & Discussions Between Util Staff & Project Manager ML20012C0401990-03-0808 March 1990 Forwards Final SALP for Aug 1989 - Oct 1989,consisting of Initial SALP Rept 50-382/89-36,rev Sheet,Summary of 900125 Meeting,List of Attendees & Util 900202 Response to Initial SALP Rept ML20055C4121990-03-0202 March 1990 Ack Receipt of & Check for $50,000 in Payment for Civil Penalty Imposed by NRC 900202 Order.Corrective Actions Will Be Examined During Future Insp ML20011F4781990-02-26026 February 1990 Advises That 891212 Changes to Emergency Plan Acceptable ML20011F6791990-02-26026 February 1990 Forwards Exam Results,Including Answer Keys,Grading Results for Facility & Individual Answer Sheets for Each Examinee as Result of Written Operating Licensing Exams Administered on 900207.Results Should Be Forwarded to Examinees ML20012A7951990-02-23023 February 1990 Forwards Insp Rept 50-382/90-01 on 900101-31 & Notice of Violation ML20055C2991990-02-23023 February 1990 Advises That 890410 Changes to Emergency Plan,Acceptable ML20006F1121990-02-14014 February 1990 Ack Receipt of in Response to Notice of Violation ML20006E7461990-02-13013 February 1990 Forwards Insp Rept 50-382/90-03 on 900129-0202.No Violations Noted 1990-09-14 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217L0421999-10-21021 October 1999
[Table view]Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20196E6931999-06-22022 June 1999 Forwards Corrected Ltr Re Changes to Rev 19 to Emergency Plan.Original Ltr Had Error in Subject Line ML20196E0831999-06-21021 June 1999 Forwards Insp Rept 50-382/99-12 on 990524-27.No Violations Noted.Purpose of Insp Was to Conduct Assessment of Emergency Preparedness Program ML20196D9941999-06-18018 June 1999 Forwards Insp Rept 50-382/99-11 on 990524-28.No Violations Noted ML20195J8091999-06-17017 June 1999 Forwards Safety Evaulation Re First 10-yr Interval Inservice Insp Relief Request for Plant,Unit 3 IR 05000382/19990081999-06-15015 June 1999 Discusses Insp Rept 50-382/99-08 & Forwards Notice of Violation Re Unescorted Access Which Was Mistakenly Granted to Individual Whose Background Investigation Indicated That He Had Failed Prior Drug Screening with Another Employer ML20196F3721999-06-0909 June 1999 Corrected Ltr Forwarding Rev 19 to Emergency Plan ML20195G3711999-06-0909 June 1999 Ack Receipt of Ltr Dtd 981223,which Transmitted Waterford 3 Steam Electric Station Emergency Plan,Rev 24,under Provisions of 10CFR50,App E,Section V.No Violations of 10CFR50.54(q) Identified During Review ML20207E8541999-06-0303 June 1999 Forwards SE Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressurizer Safety Valves at Plant,Unit 3 ML20207G3441999-06-0303 June 1999 Forwards Insp Rept 50-382/99-09 on 990411-0522 & Notice of Violation.One Violation Identified & Being Treated as Noncited Violation C ML20207D3771999-05-27027 May 1999 Ack Receipt of 990401 & 0504 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-01 on 990303 ML20207A5121999-05-24024 May 1999 Refers to Which Responded to NOV & Proposed Imposition of Civil Penalty Sent by .Violations A,B & E Withdrawn & Violations C & D Changed to Severity Level IV ML20206U7851999-05-18018 May 1999 Forwards Insp Rept 50-382/99-06 on 990405-09.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations ML20206N6961999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206S4411999-05-10010 May 1999 Forwards Insp Rept 50-382/99-05 on 990228-0410.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3841999-05-0707 May 1999 Informs That on 990407,NRC Administered Generic Fundamental Exam Section of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However Copy of Master Exam,With Answer Key,Encl for Info.Without Encl ML20206K0951999-05-0606 May 1999 Discusses Insp Rept 50-382/99-08 Issued 990503 Without Cover Ltr Documenting EA Number & Subject Line Indicated NOV Which Was Incorrect.Corrected Cover Ltr Encl ML20206K1211999-05-0303 May 1999 Corrected Cover Ltr Forwarding Insp Rept 50-382/99-08 on 990405-07.One Violations Noted & Being Considered for Escalated EA ML20206F4701999-05-0303 May 1999 Forwards Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Re Failure to Review & Consider Derogatory Access Authorization Background Info as Required by PSP Identified & Being Considered for Escalated Enforcement Action ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M0561999-04-0909 April 1999 Forwards Insp Rept 50-382/99-04 on 990301-19.One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20205J8781999-04-0505 April 1999 Forwards Insp Rept 50-382/99-02 on 990117-0227.No Violations Noted.Inspectors Determined That Six Violations Occurred & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20205J0901999-04-0202 April 1999 Informs That Info Submitted by & 970313 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) ML20205A4681999-03-26026 March 1999 Forwards Insp Rept 50-382/99-03 on 990308-12.Two Violations of Radiation Protection Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205A6141999-03-25025 March 1999 Forwards SE Accepting Request to Use Mechanical Nozzle Seal Assemblies (Mnsas) as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Application at Plant,Unit 3 ML20205F3311999-03-19019 March 1999 Advises of Planned Insp Effort Resulting from Plant,Unit 3 PPR Review,Which Was Completed on 990211.Performance at Plant,Unit 3 Was Acceptable ML20204E4941999-03-17017 March 1999 Discusses TSs Bases Change Re 3/4.4.1,3/4.6.1.7,3/4.6.3, 3/4.7.12 & 3/4.8.4.Forwards Affected Bases Pp B 3/4 4-1, B 3/4 6-3,B 3/4 6-4,B 3/4 7-7 & B 3/4 8-3 ML20207F1251999-03-0303 March 1999 Forwards Insp Rept 50-382/99-01 on 990125-29 & 0208-12 & Notice of Violations ML20203H8501999-02-17017 February 1999 Forwards SE Accepting Licensee 970701 Submittal of Second Ten Year ISI Program & Associated Relief Request for Plant, Unit 3.Nine Relief Requests Had Been Authorized Previously & Proposed Alternatives Remain Authorized ML20203D7211999-02-11011 February 1999 Forwards Request for Addl Info Re Licensee 970317 & 990111 Responses to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. Response Should Be Provided within 60 Days ML20203C2131999-02-0909 February 1999 Forwards Year 2000 Problem Audit Rept for Waterford Steam Electric Station,Unit 3.Observations Noted in Rept Discussed with Util Staff at Exit Meeting on 981217 1999-09-09 |
Text
ep f 4 [- *
'. RB 2 41988 -
In Reply Refer-To:
Docket: 50-382 Louisiana Power & Light Company ATTH: J. G. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street-New Orleans Louisiana 70160' <
Gentlemen:-
This is to advise you of a special inspection initiative that is in the late-stages of p'anning. It will include an inspection to be performed at the Waterford 3 Steam Electric Station. The initiative is entitled the "E0P Inspection Program."
The purpose of the inspection is to verify at selected sites that the emergency operating erhedur.n (EOPs) are technically accurate; that their specified actions ean be meaningfully accomplished using existing equipment, controls, and instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating tool.
The inspection program includes a team inspection of four plants for each of the NSS vendor types and the Waterford 3 plant was selected as one of the four Combustion Engineering plants.to be inspected. The inspections are to be performed in the April through June 1988 timeframe.
The inspection team will include two or three senior reactor inspectors, a licensing examiner, a human factors specialist, and your senior resident inspector (Mr. Ward Smith). The team leader for your inspection will be Mr. J. Perry Stewart from Region IV. Mr. Stewart, or one of his supervisors, will be contacting you in the near future to discuss the . inspection and to begin negotiating the inspection schedule. ,
Additional information and details of the program will be provided by your inspection team.
/
C:0PS/
\ D:DR Reconcur JEGag srdo:csi J boan 'a LJCallan pEGagliardo 2/s0/J 2 /88 2 8 2p/88 2/m/88 9
to 4
'8803030116 880224 DR ADOCK 05000 g
I
- ~. ,
t Louisiana Power & Light Company If ycu have any questions in the interim regarding this inspection program, we would be pleased to discuss them with you.
Original Signed 11y L. J. Callan L. J. Callan, Director Division of Reactor Projects cc:
Louisiana Power & Light Company ATTN: G. E. Wuller, Onsite Licensing Coordinator P.O. Box B Kiliona, Louisiana 70066 Louisiana Power & Light Company ATTN: N. S. Carns, Plant Manager P.O. Box B Killona, Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally P.O. Box 61000 New Orleans, Louisiana 70161 Louisiana Power & Light Company ATTN: K. W. Cook, Nuclear Safety and Regulatory Affairs Manager 317 Baronne Street P.O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec to DMB (IE01) bec distrib. by RIV:
RRI R. D. Martin, RA SectionChief(DRP/A) DRP RPSB-DRSS MIS System Project Engineer. DRP/A RSTS Operator RIV File J. Wilson, NRR Project Manager R. Hall DRS TSS Lisa Shea, RM/ALF F. Gillespie, NRR W. Regan, NRR J. Persensky, NRR J. Gagliardo, RIV J. P. Stewart, RIV Division Director, RI Division Director, RII Division Director F.III Division Director, RV