ML20043B482
| ML20043B482 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/22/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20043B483 | List: |
| References | |
| NUDOCS 9005300090 | |
| Download: ML20043B482 (3) | |
See also: IR 05000382/1990007
Text
i
'
'
'
.
,
'
NAY 2 2 590
-
In Reply Refer To:
D>cket:
50-382/90-07
l
l
Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operctions
P.O. Box 60340
New Orleans, Louisiana 70160
Gentlemen:
'
This refers to the inspection conducted by Messrs. W. F. Smith and S. D. Butler
of this office during the period April 1-30, 1990, of activities authorized by
NRC Operating License NPF-38 for Waterford Steam Electric Station, Unit 3, and
to the discussion of our findings with Mr. J. R. McGaha and other members of
your staff at the conclusion of the inspection.
.
Areas examined during the inspection included plant status, unsite followup of
events, monthly maintenance observation, monthly surveillance observation,
operational safety verification, licensee event report followup, and engineered
.
safety feature system walkdown. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspectors.
The inspection
findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified; however, two issues are brought to your attention in this report
relating to the assurance that control room personnel are aware of the removal
of Technical Specification required equipment from service and the need for
surveillance procedures to provided sufficient instruction.
We have also examined actions you have taken with regard to previously
identified inspection. findings. The status of these items is identified in
paragraph 7 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
.
Sincerely,
OriginalSigned By:
Samuel J. Collins
Samuel J. Collins, Director
Division of Reactor Projects
Enclosure:
(see next page)
RIV:RI
C:DRP/A
.D P
SDButler
WFSmith-
TFWesterman
J
ins
5/ V7/90
5/n/90
5/~7/90
/90
/
\\h
6,\\
9005300090 900522
ADOCK 05000382
O
l
9'-
.s,
-
'
.
l
Louisiana Power & Light Company
-2-
i
!
I
Enclosure:
Appendix - NRC Inspection Report
l
50-382/90-07
i
cc w/ enclosures:
'
Louisiana Power & Light Company
i
ATTN:
R. P. Backhurst, Vice President
Nuclear Operations
P.O. Box B
.
K111ona, Louisiana 70066
'
Louisiana Power & Light Company
ATTN:
J. R. McGaha, Jr., Plant Manager
P.O. Box B
-
,
K111ona,-Louisiana 70066
-
Louisiana Power & Light Company
ATTN:
L. W. Laughlin, Site
Licensing Support Supervisor
.
P.O. Box B
K111ona, Loutslana 70066
Louisiana Power & Light Company
i
ATTN:
G. M. Davis, Manager Events
Analysis Reporting & Response
P.O. Box B
<
Killona, Louisiana 70066
-
- Monroe & Leman
,
L4
ATTN:
W. Malcolm Stevenson, Esq.
'
-201 St. Charles Avenue, Suite 3300
-
New Orleans, Louisiana 70170-3300
Shaw,.Pittman, Potts & Trowbridge-
ATTN: Mr. E. Blake
L
2300 N Street, NW
Washington, D.C.
20037
Middle South Services, Inc.
ATTN:- Ralph T. Lally, Manager
of Quality Assurance
P.O. Box 61000
New Orleans, Louisiana 70161
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
,
--
y, ,
' ,
, ,
1
4
l
Louisiana Power & Light Company
-3-
i
e
Louisiana Power & Light Company
- ATTN:
R. F. Burski, Manager, Nuclear
Safety and Regulatory Affairs
317-Baronne Street
New Orleans, Louisiana 70112
Department of Fnvironmental Quality
ATTN: Williv. H, Spell, Administrator
Nuclea< Energy Division
- P.O. Box 14690
'
Baton Rouge, Louisiana 70898
President, Police Jury
St. Charles Parish
Hahnv111e, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland ~ 20814
U.S. Nuclear Regulatory Commission
ATTN:
Resident Inspector
P.O. Box 822<
K111ona, Louisiana 70066
U.S. Nuclear Regulatory Commission
ATTN:
Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington,-Texas 76011
- bec to DMB (IE01)
. bcc distrib. by RIV:
- R. D. Martin
- Resident Inspector
- Section Chief (DRP/A)
- DRP
l-
- DRSS-FRPS
- MIS System
" Project Engineer (DRP/A)
- RSTS Operator
- RIV File
- DRS
- D. Wigginton, NRR Project Manager (MS:
13-D-18)
Lisa Shea, RM/ALF
- w/766