ML20043C108
| ML20043C108 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/23/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20043C109 | List: |
| References | |
| NUDOCS 9006040052 | |
| Download: ML20043C108 (3) | |
See also: IR 05000382/1990008
Text
. .
.'
- m,.
,
MAY 2 3 !990
n
.
In Reply Refer To:
Docket: 50-382/90-08
Louisiana Power & Light Company
.
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
P.O. Box 60340
New Orleans, Louisiana .70160
Gentlemen:
This refers to the inspection conducted by Messrs. R. B. Vickrey, J. E. Bess,
and D. R. Hunter of this office and an NRC consultant a contractor during the
period April 16-20, 1990, of activities authorized by NRC Operating
License NPF-38 for Waterford-3, and to the discussion of our findings with
Mr. J. R. McGaha and other members of your staff at the conclusion of the
inspection.
The principal. areas examined during the inspection included training.and
qualification effectiveness, the followup of previously identified inspection
findings, and the followup of the weaknesses identified in the maintenance team
inspection (NRCInspectionReport 50-382/89-01) conducted in January and
February 1989 at the Waterford 3 site. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors. The inspection
findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By:
Samuel J. Gottes
Samuel J. Collins, Director
Division of Reactor Projects
Enclosure:
<
, Appendix - NRC Inspection Report
n
50-382/90-08
c8 8' cc w/ enclosure:
Nga
So .
Louisiana Power & Light Company
7
jg
ATTH:
R. P. Barkhurst, Vice President
Nuclear Operations
d,
[@
-P.0
Box B
f
.
gg
K111ona, Louisiana 70066
/
.I
na
-8
'
RIV:0PS *
RI:0PS'*
RI:0PS *-
C:0PS *
f D:
S
i
8g
RBVickrey:1m
JEBess
DHunter
JEGagliardo 1t40 Callan
lins
'
.
4
o' a. a
-/ /90
/ /90
/ /90
/ /90
fgj90
$ 23 /90
- Previously concurred
-_
_ - _ - _ _ - - _ _ _ _
_ - _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ _ _ - - - _ _ _ _ - _ _ - _ -
.
,
-
n
,Y
!
'
c
.
.
Louisiana Power & Light Company
-2-
i
Louisiana Power & Light Company
>
' ATTN:
J. R. McGaha, Jr., Plant Manager
.,
P.O. Box B
-
,
K111ona, Louisiana 70066
j
Louisiana Power & Light Company
1
-
ATTN:
L. W. Laughlin,-Site
Licensing Support Superiisor
P.O. Box B
K111ona, Louisiana 70066
.
Louisiana Power & Light Company
ATTN:
G. M. Davis, Manager, Events
,
Analysis Reporting & Response
P.O. Box B
K111ona, Louisiana 70066
Monroe & Leman
ATTN:
W. Malcolm.Stevenson, Esq.
201 St. Charles Avenue, Suite 3300
New Orleans, Louisiana 70170-3300
Shaw, Pittman, Potts & Trowbridge
ATTN: Mr. E. Blake
2300 N Street, NW
>
Washington, D.C.
20037
>
Middle South Services, Inc.
ATTN:
Ralph T. Lally, Manager
[
of Quality Assurance
P.O. Box 61000
-
New Orleans, Louisiana 70161
L
Chairman
i
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
.
l
Louisiana Power & Light Company
l
ATTN:
R. F. Burski, Manager, Nuclear
Safety and Regulatory Affairs
317 Baronne Street
New Orleans, Louisiana 70112
Department of Environmental Quality
ATTN: William H. Spell, Administrator
Nuclear Energy Division
P.O. Box 14690
Baton Rouge, Louisiana 70898
l
,.
.. -
4
4
I
i
' .-
.
.
i
Louisiana Power & Light Company
-3-
.
li
President, Police Jury
St. Charles Parish
Hahnville, Louisiana 70057
,
Mr. William A. Cross
Bethesda Licensing Office
-
3 Metro Center
Suite 610
Bethesda, Maryland 20814
,
U.S. Nuclear Regulatory Commission
ATTN: Resident Inspector
P.O. Box 822
Killona, Louisiena 70066
U.S. Nuclear Regulatory Commission
i
ATTN:
Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
bec to DMB (IE01)
bec distrib, by RIV:
- R. D. Martin
- Resident Inspector
l
- Section Chief (DRP/A)
- DRP
- DRSS-FRPS
- MIS System
- Project Engineer (DRP/A)
- RSTS Operator
l
- RIV File
- DRS
- D. Wigginton, NRR Project Manager (MS:
13-D-18)
Lisa Shea, RM/ALF
- J.
Bess
- R. Vickrey-
- J. Gagliardo
- D. Hunter
S. Shankman, NRR
,
,
A. Gody, PQEB, NRR
i
- w/766
'
>
4