Text
g h,
May 23,1990 p
F y: e Docket No. 50-382
~
.Mr. - J. G. Dewease Senior Vice President. Nuclear Operations Louisiana Power and Light Company Post Office Box 60340 New Orleans, Louisiana 70160
Dear Mr. Dewease:
g S!'BJECT: RESPONSE TO GENERIC LETTER 89-10. " SAFETY.RELATED MOTOR.
1 E
OPERATEDVALVE(MOV)TESTINGANDSURVEILLANCE"(TACNO.75735)
'On June 28, 1989, the NRC issued Generic Letter (GL) 89-10 requesting the establishment of a program'to-ensure the operability of all safety-related MOVs under design basis' conditions.
The program in GL 89-10 significantly expands.the scope of the program outlined in NRC Bulletin 85 03 and its j
supplement.
In accordance with the schedule provided in the GL, a description of your MOV program should be available for review by the next refueling optage.
Information that should be contained in your program description was discussed i
during the workshoas held in September 1989. The staff positions-on questions presented during tie workshops will be issued in the form of-a supplement to the GL. As your program is developed, justification for any differences between your program and the GL exemplified by the workshop comments should be incorporated into your program description.
0 Your response to GL 89 10 dated December 26, 1989, stated that you intend to meet the' schedule and recommendations of the Generic Letter. Your program description should be retained on-site for possible further NRC staff
(
review.-
i Sincerely,.
V l
/s/
l David L. Wigginton, Project Manager 9005300124 900523 Division of Reactor Projects - III,
'1 Project Directorate IV pDR ADock 05000382 IV, V and Special Projects PDC Office of Nuclear Reactor Regulation ec: See next.page DISTRIBUTION c 55'cTet w e 6 NRC PDR Local PDR PD4 Reading j
G. Holahan MS 13E4 F. Hebdon P. Noonan D. Wigginton
'0GC-Rockville E. Jordan MS MNEC 3701 ACRS(10)MSF-315p pf PD4 Plant File T. Westerman A. Gody L. B. Marsh a
e LOFC-
- PM7El Li.
- PM7PM
- EMEB~
'~'
- PD4/D
..=_.. :.... 4.'.'.l.h'... :.....
....:...........___:. 3 (NAME~:PNoonan
-:DWig on:bj :LBMarsh FHe2on DATE :05/N90-
- 05 90=
- 05/d/90 iO5d3/90 OFFIllAL RECOM PY.
-Document Name: W3 LTR/75T33 i
=n E
w
, M[Jtee:,,(L,
UNITED STATES NUCLEAR REGULATORY COMMISSION p,
-5 wAsmwoTow, o. c. 20sss
[
May 23, 1990
~
Docket No. 50-382' Mr. J. G. Dewease Senior Vice President - Nuclear Operations Louisiana Power and Light Company Post Office Box 60340 New Orleans, Louisiana 70160
Dear Mr. Dewease:
SUBJECT:
RESPONSE TO GENERIC LETTER 89-10. " SAFETY-RELATED MOTOR-OPERATEDVALVE(MOV)TESTINGANDSURVEILLANCE"(TACNO.75735)
On June 28,'1989, the NRC issued Generic Letter (GL) 89-10 requesting the establishment of a program to ensure the operability of all safety-related MOVs under design basis conditions. The program in GL 89-10 significantly expands the scope of the program outlined in NRC Bulletin 85-03 and its-supplement.
In accordance with the schedule pu ded in the GL, a description of your MOV: program should be available for review by the next refuelir.g outage.
Information that should be contained in your program description was discussed during the workshops held in September 1989. The staff positions _on questions presented during the workshops will be issued in the form of a supplement to the GL. As your program is developed, justification for any differences between your program and the GL exemplified by the workshop comments should be incorporated into your program description.
~
Your response to GL 89-10 dated December ~26, 1989, stated that you intend to meet the schedule and recommendations of the Generic Letter. Your program description should be retained on-site for possible further NRC staff reviev.
Sincerely, s
s David L. Wig
'on, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V:and Special Projects Office of Nuclear Reactor Regulation cc: See next page 0
c :f. *
- i
- Mr. Jerrold G. Dewease Waterford 3-Louisiana Power & Light Company
-CC' W. Malcolm Stevenson, Esq.
Regional Administrator, Region IV Monroe & Leman _
U.S. Nuclear Regula' tory Commission 201 St. Charles Avenue, Suite 3300 Office of Executive Director-for New Orleans, Louisiana 70170-3300 Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E. Blake Arlington, Texas 76011 Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Mr. William H. Spell, Administrator Washington, 0.C.
20037 Nuclear Energy Division Department of Environmental Quality Resident Inspector /Waterford NPS Post Office Box 14690 Post Office Box 822 Baton Rouge, Louisiana 70898 Killona, Louisiana 70066
-Mr. Ralph T. Lally President, Police Jury Manager of Quality Assurance St. Charles Parish Middle South Services, Inc.
Hahnville, Louisiana 70057 Post' Office Box 61000 New Orleans, Louisiana 70161 Chairman William A. Cross Louisiana Public Service Commission Bethesda Licensing Office
-One American Place, Suite 1630 3 Metro Center Baton Rouge, Louisiana 70825-1697 Suite 610 Bethesda, Maryland 20814 Mr.'R. F. Burski huclear Safety and Regulatory Affairs Manager Louisiana Power & Light Company 317 Baronne Street New Orleans, Louisiana 70112 e
e