ha Entergy opergtlons, Inc.
h P. O Box 31995 Jacksoc,. MS 39286-1995 Tel 601368 5290 Jeiry W.Yelverton h E c e Officer June 30,1999 Document Control Desk United States Nuclear Regulatory Commission Mail Stop P1-37 Washington, DC 20555-0001
Subject:
Entergy Operations, Inc.
Response to NRC Generic Letter 98-01 Supplement 1, " Year 2000 Readiness of Computer Systems at Nuclear Power Plants" Arkansas Nuclear One - Units 1 & 2 Grand Gulf Nuclear Station Docket Nos. 50-313 & 50-368 Docket No. 50-416 License Nos. DPR-51 & NPF-6 License No. NPF-29 River Bend Station Waterford Steam Electric Station - Unit 3 Docket No. 50-458 Docket No. 50-382 License No. NPF-47 License No. NPF-38 CNRO-99/00018 Ladies and Gentlemen:
The purpose of this letter is to respond to the Nuclear Regulatory Commission's request for information regarding Year 2000 (Y2K) readiness at nuclear power plants. Generic Letter (GL) 98-01, " Year 2000 Readiness of Computer Systems at Nuclear Power Plants,"
requested a response on the status of facility Y2K readiness by July 1,1999.
On January 14,1999, the Commission issued Supplement 1 to Generic Letter 98-01 to modify the request for information in the original generic letter. The Supplement states:
1 "In responding to this supplement to GL 98-01, the addressee should confirm Y2K readiness of the facility with regard to those systems within the scope of the license and I
NRC regulations, and those systems required for continued operation of the facility after January 1,2000. For those systems which are not Y2K ready as of July 1,1999, the addressee should provide a status and completion schedule for achieving readiness by the year 2000."
in response, Entergy Operations, Inc. (Entergy) is voluntarily reporting facility readiness as o
outlined in Supplement 1 to Generic Letter 98-01. Attached is the Year 2000 Readiness Disclosure for Arkansas Nuclear One - Units 1 and 2, Grand Gulf N'iclear Station, River Bend Station, and Waterford Steam Electric Station - Unit 3, reportirg the status of facility 99070702A51990630
~
~
c PDR ADOCK 05000313, p
PDR tW
R:sponsa to Generic Lett:r 98-01 Suppl ment 1
>2*-
Juns 30,1999 -
CNRO-99/00018
- Page 2 of 2 Y2K readiness.- This disclosure is submitted under the guidelines of the " Year 2000 Information and Readiness Disclosure Act" (Public Law 105-271).
If you have any questions pertaining to Entergy's Y2K effort, please contact Ms. Marie Bishop (601-368-5695) or Mr. Guy Davant (601-368-5756) of my staff.
Sincerely, JWY/MRK/MAK/MKB/GHD:baa ec:
Mr. C. M. Dugger (W-GSB-300) ~
Mr. W. A. Eaton (G-ESC 3-VPO)
Mr. R. K. Edington (R-GSB-40)
Mr. C. R. Hutchinson (N-GSB)
Mr. J. R. McGaha (M-ECH-65)
Mr. R. L. Bywater (NRC Senior Resident inspector, ANO)
Ms. J. L. Dixon-Herrity(NRC Senior Resident inspector, GGNS)
Mr. T. R. Famholtz (NRC Senior Resident inspector, W3)
Mr. R. J. Fretz (NRRProject Manager, RBS)
Mr. N. D. Hilton (NRR P'roject Manager, ANO-1)
' Mr. E. W. Merschoff (NRC Regional Administrator)
Mr. M. C. Nolan (NRR Project Manager, ANO-2)
Mr. S. P. Sekerak (NRR Project Manager, GGNS)
]
Mr. C. P. Patel (NRR Project Manager, W3)
Mr. T. W. Pruett (NRC Senior Resident inspector, RBS)
)
i
CNRO-99/00018 Attachment Page 1 of 1 Year 2000 Readiness Disclosure This Year 2000 Readiness Disclosure is made for Arkansas Nuclear One - Units 1 and 2, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station -
Unit 3 under the " Year 2000 !nformation and Readiness Disclosure Act"(Public Law 105-271).
This disclosure addresses the Y2K readiness of these facilities with regard to those systems within the scope of the license, NRC regulations, and other systems required for continued operation of the facilities after January 1,2000. A facility that is "Y2K Ready" has followed a prescribed program to identify and resolve Y2K issues so the facility can operate reliably while meeting commitments.
Entergy has conducted a Y2K readiness program similar to that outlined in NEl/NUSMG 97-07, Nuclear Utility Year 2000 Readiness. The program applies to software, hardware and firmware whose failure due to a Y2K problem would prevent the performance of the safety function of a structure, system or component. Additionally, the program applies to any software, hardware, or firmware whose failure due to a Y2K problem would prevent continued operation of the nuclear facility well beyond December 31,1999. The Entergy program also includes identifying and, where appropriate, remediating embedded systems.
The program provides for risk management efforts and development of contingency plans for key rollover dates.
In accordance with Entergy's Y2K readiness program, those systems required for operation of Arkansas Nuclear One - Units 1 and 2, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station - Unit 3 are Y2K ready. Further, contingency plans have been developed to mitigate the impact of Y2K-induced events at key rollover dates.
i l