IR 05000482/1986005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20207F458
| number = ML20207F458
| issue date = 07/16/1986
| issue date = 07/16/1986
| title = Ack Receipt of 860605 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/86-05
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/86-05
| author name = Gagliardo J
| author name = Gagliardo J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8607220545
| document report number = NUDOCS 8607220545
| title reference date = 06-05-1986
| package number = ML20207F463
| package number = ML20207F463
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 22:28, 5 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/86-05
ML20207F458
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/16/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
Shared Package
ML20207F463 List:
References
NUDOCS 8607220545
Download: ML20207F458 (1)


Text

-- . _ _ -.

.

.

JUL 16196b In Reply Refer To:

Docket: STN 50-482/86-05

Kansas Gas and Electric Company ATTN
Glenn L. Koester <

4 Vice President - Nuclear P. O. Box 208 Wichita, Kansas 67201

,

'

Gentlemen:

Thank you for your letter of June 5,1986, in response to our letter and I Notice of Violation dated May 7, 1986. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

1

Sincerely, Original Signed By J. E. Gagliardo J. E. Gagliardo, Chiet Reactor Projects Branch '

CC*

Kansas Gas and Electric Company ATTH: Otto Maynard, Manager of Licensing P. O. Box 309 (Sharp Road)

Burlington, Kansas 66839 Forrest Rhodes, Plant Superintendent Wolf Creek Generating Station P. O. Box 309 Burlington, Kansas 66839 Kansas Radiation Control Program Director bec to DMB (IE01) g72gg G PDR bec distrib. by RIV:

RPB Myron Karman, ELD, MNBB (1)

Resident Inspector R. D. liartin, RA SectionChief(RPB/B) ORSP R. P. Mullikin MIS System 0\

R&SPB RIV File D. Weiss, LFMB (AR-2015)

RSB RSTS Operator M y

i 'RPB/B C:RPB C:RPB /f rdo RPMullikin:cs DRHunt r JEGa '

7/0/86 7/ \V86 7/>