e T Auf M COUNTY NUCLEAR GENERATING STACCN N.P.D.E.S. PERMIT NO:        ILOO48151 NONCCMPLIANCE REPCRT DISCHARGE NLHEER AND DESCRIPTION: Outfall 001c Low Volume Waste Regen. Wastes Soln. Discharge Tank PARAMETER AND PE EIT LIMIT
* Total Iron, 1.0 mg/l
)                              NONCCMFtIANCI, DATE, AND DURATTON:
2'.3 mg/1, September 3, 1982, 2-i hours                                                        .
l l
CAUSE 07, NONCOMPLIANCE:
The excessive total tron found on August 10, 1982, was due to the temporary hydrogen peroxide system not' operating properly.
\                                                                                                                                                                                                .            .
CORRECTIVE ACTION:
A permanent hydrogen peroxide injection system is to be Installed as soon as equipment can be. purchased and delivered. Expected completion
                                  ~
date is approximately January 1,1983. Corrective Actions have been Initiated during the interim period to attempt to control this noncompliant condition administratively.
September 11                            1982 DATE ?ICCGNITED M A VICI.ATION:
September 16, 1982 DATE I T:.STICATED:
                                                                                                    . . .  ~
                        ~ 8210190494 820929
                                                                                                              )-
_pgR
                            .          ADOCK 05000p7
  -+            .                            .
 
LASALLE COUNTY NUCLEAR GENERATING STATION N.P.D.E.S. PERMIT NO:          ILOO48151 NONCOMPLIANCE REPORT DISCHARGE NUMBER AND DESCRIPTION:          001c - Low Volume Waste Radwaste Discharge Tanks PARAMETER AND PERMIT LIMIT:          Total Suspended Solids - 15 mg/l Total tron - 1.0 mg/l NONCOMPLIANCE, DATE, AND DURATION:
TSS, 22 mg/1, August 1, 1982, 13 hours                                                .
Total tron, 6.0 mg/1, August 1, 1982, 13 hours CAUSE OF NONCOMPLIANCE:
Mechanical problems with the Radwaste evaporators resulted poor quality water being processed to this out fall. This water was known to have tr.en of poor quality prior to processing forward, but was not acted upon due to high water inventories in Radwaste. Once the water was discharged to this out fall tank, it could not be reprocessed, and must be discharged. to the cooling Pond Blowdown line.
                                  .          .                        , .. g.          ,
CORRECTIVE ACTION:                            -
Operating personnel were rotified of the need to reprocess poor quality water, instead of procetting it forward. Operating personnel agreed wi th this, and will reprocess poor quality water. They are also attempting to correct the problems with the evaporators, which will alleviate the need for reprocessing.
August 3, 1982 DATE RECOGNIZED AS,A VIOLATION:
                                                                                          "9"*    '
DATE I::VESTIGATED:
h sf              0-o**$G$$G Yb}}

Latest revision as of 05:46, 6 January 2021

NPDES Noncompliance Notification:On 820903,total Iron in Outfall 001c Low Vol Waste Regeneration Wastes Solution Discharge Tank Exceeded Allowable Limit.Caused by Temporary Hydrogen Peroxide Sys Not Operating Properly
ML20065L592
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/29/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20065L585 List:
References
NUDOCS 8210190494
Download: ML20065L592 (1)


Text

,

e T Auf M COUNTY NUCLEAR GENERATING STACCN N.P.D.E.S. PERMIT NO: ILOO48151 NONCCMPLIANCE REPCRT DISCHARGE NLHEER AND DESCRIPTION: Outfall 001c Low Volume Waste Regen. Wastes Soln. Discharge Tank PARAMETER AND PE EIT LIMIT

  • Total Iron, 1.0 mg/l

) NONCCMFtIANCI, DATE, AND DURATTON:

2'.3 mg/1, September 3, 1982, 2-i hours .

l l

CAUSE 07, NONCOMPLIANCE:

The excessive total tron found on August 10, 1982, was due to the temporary hydrogen peroxide system not' operating properly.

\ . .

CORRECTIVE ACTION:

A permanent hydrogen peroxide injection system is to be Installed as soon as equipment can be. purchased and delivered. Expected completion

~

date is approximately January 1,1983. Corrective Actions have been Initiated during the interim period to attempt to control this noncompliant condition administratively.

September 11 1982 DATE ?ICCGNITED M A VICI.ATION:

September 16, 1982 DATE I T:.STICATED:

. . . ~

~ 8210190494 820929

)-

_pgR

. ADOCK 05000p7

-+ . .

LASALLE COUNTY NUCLEAR GENERATING STATION N.P.D.E.S. PERMIT NO: ILOO48151 NONCOMPLIANCE REPORT DISCHARGE NUMBER AND DESCRIPTION: 001c - Low Volume Waste Radwaste Discharge Tanks PARAMETER AND PERMIT LIMIT: Total Suspended Solids - 15 mg/l Total tron - 1.0 mg/l NONCOMPLIANCE, DATE, AND DURATION:

TSS, 22 mg/1, August 1, 1982, 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> .

Total tron, 6.0 mg/1, August 1, 1982, 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> CAUSE OF NONCOMPLIANCE:

Mechanical problems with the Radwaste evaporators resulted poor quality water being processed to this out fall. This water was known to have tr.en of poor quality prior to processing forward, but was not acted upon due to high water inventories in Radwaste. Once the water was discharged to this out fall tank, it could not be reprocessed, and must be discharged. to the cooling Pond Blowdown line.

. . , .. g. ,

CORRECTIVE ACTION: -

Operating personnel were rotified of the need to reprocess poor quality water, instead of procetting it forward. Operating personnel agreed wi th this, and will reprocess poor quality water. They are also attempting to correct the problems with the evaporators, which will alleviate the need for reprocessing.

August 3, 1982 DATE RECOGNIZED AS,A VIOLATION:

"9"* '

DATE I::VESTIGATED:

h sf 0-o**$G$$G Yb