ML20042F172

From kanterella
Jump to navigation Jump to search
Environ Protection Plan,1989 Annual Operating Rept
ML20042F172
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/31/1989
From: Diederich G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9005070322
Download: ML20042F172 (2)


Text

..... - -.....

............... dd

[

.~

1 g

r

Ccmm:nw0alth Edison-e b

7 LaSalle County Nuclear Station -

9%u Rural Route #1. Box 220

- Marseilles, Illinois 61341

, NINIIY IIE0 l'

i

- Telephone 815/357 6761 11rst 5.qg April 25, 1990 g_

Z j

fr -W st(etI&[25:

mb

.Mr. Bert Davis d

Administrator y

U.S. Nuclear.Reguletory Commission i

Region-III 799 Roosevelt Rood

. Glen Ellyn, IL.60137,

[

SUBJECT:

Environmental Protection Plan Operating Report Appendix B to: Facility

' License No'.,NPF-11 and NPY-18.

Attached is the Annual Environmental Operating Report for the year of 1989 for

.the Environmental Protection. Plan as required by Section 5.4~of Appendix D to Facility License No. NPF-ll and NPF-18.

This report includes information required by.the following subcections of.

Appendix Bt.

}l 3.1 Plant Design and Operation 4. 2.1 --

Vegetative Integrity on Cooling Pond Dike-i t

5.4.1 EPP Noncomp?..x os and,the Corrective hetions to Remedy Them i

g 5.4.2 Nonroutine Reports j

y 4

In-accordance with Regulatory Guide '0.1, one copy of thic report is.providedt 1

E for your use and 18 copies are being submitted directly to the Document-

'i Control Desk, U.S. Nuclear' Regulatory Commission, Washington, D.C., 20555.

L

~

h

.j G.

U. IIi9 der.ich 1 ;

Statinn. Manager i

LaSulle County' Station

~GJD/KFK/sjj i

1 cc NRC Document Control Desk 418 Copies}

NRC Resident Inspectot 1

Environmental Affairs I

' Charles Sprunger Wayne Morgan 4,. {

)

/.'i yh o

50 3

R

'ZCADRAD/68-e e-

)

i y

p.

4 e

k M'MYNhbN '

OO E

Eb

ne : r. -

f f.-

j n

LaSalle County. Station a

Environmental Protection Plan 1989 Annual Operating Report 1). Plant Design and Operation No changes in station design or operation, tests or experiments were'made in accordance'with~ subsection 3.1 which involve'a potentially significant.

t

~

.unreviewed environmental: Issue.

2) ;Eggniative Integrity on Cooling Pond. Dike 3

TheTvegetative. integrity-of the cooling pond dike-was inspected in:

accordance with LaSalle County. Surveillance HTS-1000-5.:. Inspections wero-perfcomed-on 3/17/89, 4/28/89,'5/17/89, 6/23/89, 7/20/89, 8'28/89,.9/28/89 and 30/20/89. The.results of these inspections were as'followss' a)

Ground cover, Crown Vetch in'particular, remained intact dur.ing the entire growing season of:1989.- The only exceptions were a small path up the slope of the dike'near; marker 140 and a smalliarea'of degraded vegetation at the top of the dike near marker 215.

There was a hole

'5 in the fence near marker-140 and itJappeared that people were using; it as an access to the lake,for fishing.

The holeLin the fence:was 1;

repaired and the vegetation began,to grow back. ;The-small, j

approximately 5' by 5',-area of degraded vegetation near the top of the dike'near marker 215'was:noted'inithe May inspection.

This area 3

was recovered by the June? inspection'and=no appreciable! erosion has I

occurred.

.\\

b)

Canadian Thistle was present onEthe cooling lake l dike. -The level off i

infestation was approximately the same as that=seen inl1988.- No application of herbicide _was necessary.tx> control.this weed..

3)

EPP Noncompliances and Action Taken to Remedy Them f

j There were no EPP noncompliances.

4) Honroutine Reports i

i:

i

-i No nonroutine reports were submitted.

l

- 1 q

5 e

w

']

1 p'

i n

f

'ZCADRAD/68 0

i

.Il