ML20067C917

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 821105,temporary Hydrogen Peroxide Sys Not Injecting Hydrogen Peroxide. Injection Pump Repaired
ML20067C917
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/13/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20067C910 List:
References
NUDOCS 8212100275
Download: ML20067C917 (2)


Text

.-

'"D, Ccmmsnw:alth Edis n f

LaSalle County Nuc! ear Station Rural Routa #1, Sex 220 I[ Telephone B15/357-6761 Marssilles, lllinois 61341 qf November 15, 1982 U.S. Environmental Protection Agency Region V, Enforcement Division ATTN:

Chief, Comp 11ance Unit 230 South Dearborn Street Chicago, IL 60604 lilinois Environmental Protection Agency Division of Water Pollution Control Compliance Management Unit 2200 Churchill Road Springfield, IL 62706

Dear Sir:

Subject:

NPDES Noncompliances for LaSalle County Nuclear Generating Station - Permit No. ILOO43151 in accordance with Standard Condition 12, we wish to submit the following notice of noncompliances, which ar,e listed chronologically in the attached

table, if there are any questions, please contact Joe Williams of my staff at (315) 357-6761, extension 201.

Mf G. J. Dieder(ch hSuperintendent LaSalle County Station i

(d.L. $N GJD/FRL/JDW/lrw Di rector of Water quali ty, Envi ronmental Aff ai rs cc:

Manager, Nuclear Stations Division I

8212100275 821202 PDR ADOCK 05000373 S

PDR

LASALLE COUhTl NUCLEAR GENERATING STATION N.P.D.E.S. PERMIT NO:

ILOO48151 NONCOMPLIANCE REPORT DISCHARGE NUMBER AND DESCRIPTION _:

Outfall LJ1c Low Volume Waste Regen. Wastes Soln. Disch. Tank PARAMETER AND PERMIT LIMIT: Total Iron, 1.0 mg/l NONCOMPLIANCE, DATE, AND DURATION: 4.7 mg/1, 5 November 1982, 110,827 gallons CAUSE OF, NONCOMPLIANCE:

The temporary hydrogen peroxide system was not injecting hydrogen peroxide.

CORRECTIVE ACTION _:

A work request was written to repair the malfunctioning pump.

Repairs to the other injection pump in the system had been completed. This pump was put in service, and verification made that it was injecting hydrogen peroxide.

12 November 10A2 DATE RECOGNIZED AS A_ VIOLATION:

DATE INVESTICATED: