LASALLE COUNTY NUCLEAR GENERATING STATION N.P.D.E.S. PERMIT NO:

ILOO48151 NONCOMPLIANCE REPORT DISCHARGE NUMBER AND DESCRIPTION:

Outfall 001c t.ow Volume Waste Radwaste Discharge Tanks s

PAkAMETER AND PERMIT LIMIT:

pH, 6.0-9 0 S.U.

l'ONCOMPLIANCE, DATE, AND DURATION:

4.6, 24SEP82, 8 Hours CAUSE OF NONCOMPLIANCE:

At 0550 Hrs. 23SepS2, the tank was sampled to verify neutralization

"~

prior to discharge. The result was 6.1 S.U. pH.

At the end of the discharge a second sample was pulled which showed the pH to be 4.6 S.U.

A third sainple,was pulled that verified the 4.6 pH.

The cause of the pH change is unknown all inputs to the tank were isolated from the time

~

of the first sample on.

CORRECTIVE ACTION:

An error in the sampling or analysis is suspected. A review of the flush time used for flushing the sample line is being done to insure the time is adequate to obtain a representative sample.

F DATE RECOGNIZED AS A VIOLATION:

September 24, 1982 September 24, 1982

/

DATE INVESTIGATED:

/

l 8211060128 820924 PDR ADOCK 05000373 S