ML17347A243: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:REGULATORY I RNATION DISTRIBUTION SYB l (R IDB)ACCESSION NBR: 8701130250 DOC.DATE: 87/01/07 NOTARXZED:
{{#Wiki_filter:REGULATORY     I   RNATION DISTRIBUTION SYB     l (R IDB)
NO DOCKET I FACIL:50-250 Tuv keg Point Plant.Unit 3I Flov ida Potoer and Light C 05000250 50-251 Tuv keg Point Plant.Unit 42 Flov ida Pokier and Light C 05000251 AUTH.NAl'1E AUTHOR AFFILIATION WOODY'.O.Fl orida Powev Sr Light Co.RECIP.NANE RECIPIENT AFFXLIATION Recov'd Services Branch (Document Contv ol Desk)
ACCESSION NBR: 8701130250           DOC. DATE: 87/01/07 FACIL:50-250 Tuv keg Point Plant. Unit 3I Flov NOTARXZED: NO ida Potoer and Light     C DOCKET 05000250 I
50-251 Tuv keg Point Plant. Unit 42 Flov         ida Pokier and Light     C 05000251 AUTH. NAl'1E         AUTHOR AFFILIATION WOODY'. O.           Fl orida Powev Sr Light Co.
RECIP. NANE           RECIPIENT AFFXLIATION Recov'd   Services Branch (Document Contv ol Desk)


==SUBJECT:==
==SUBJECT:==
Forwards special v ept v e breached five barriev's pev Tech Spec 6.9.3.DIBTRIBUTION CODE:*DODD COPIEB RECEIVED;LTR~ENCL j BIIE: TXTLE: OR/Licensing Submittal:
Forwards special v ept v e breached five barriev's pev Tech Spec 6. 9. 3.
Fire Protection NOTES: RECIPIENT ID CODE/NANE PWR-A PD2 LA I 1cDONALDi D INTERNAL: ADN/LFl)B XE WHITNEY>L NRR WERl1EIL.SOh COPIES LTD ENCL 1 0 1 1 0 1 0 RECIPIENT ID CODE/NANE PWR-A PD2 PD 01 PWR-A PSB ELD/HDS4 Q>S 07 FXL 04 COP IES LTTR ENCL 5 5 1 0 2 2 1 EXTERNAL: LPDR NSXC 03 05 NRC PDR 02 TOTAL NUBBER OF COP IEB REQUIRED: LTTR 18 ENCL 14 h.h S'I vh P.O.BOX 00, JUNO BEACH, FL 33408-0420
DIBTRIBUTION CODE: *DODD TXTLE:
..JANUARY 07 198I L-87-I 0 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
COPIEB RECEIVED; LTR OR/Licensing Submittal: Fire Protection
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-25 I S ecial Re ort-Breached Fire Barriers In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.
                                                            ~ ENCL  j  BIIE:
Should there be any questions on this information, please contact us.Very truly yours, O.Woody roup Vice President Nuclear Energy COW/PLP/gp Attachment cc: Regional Administrator, Region ll, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Harold F.Reis, Esquire 8701130250 870107 PDR ADOCK 05000250 O'S PDR PLP I/020/I PEOPLE...SERVING PEOPLE  
NOTES:
~aaa''I u~I'(4 I 8 I I s Pl J i>i l A II R~4'll~~lt Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-25 I S ecial Re ort-Breached Fire Barriers~Pur ose: Technical Specification 3.I4.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days.In accordance with the above requirement, this special report on the breached barriers is being generated in order to notify the NRC.This special report will be updated on a 30 day basis until the Appendix R associated work is complete.Event: The plant has been and is continuing to implement numerous modifications, mainly in accordance with Appendix R Alternate Shutdown requirements.
RECIPIENT           COPIES          RECIPIENT          COP IES ID CODE/NANE         LTD  ENCL    ID CODE/NANE        LTTR ENCL PWR-A PD2 LA               1    0    PWR-A PD2 PD 01        5      5 I 1cDONALDi D               1    1    PWR-A PSB INTERNAL: ADN/LFl)B                         0    ELD/HDS4              1    0 XE WHITNEY> L                     1              Q>S  07      2      2 NRR WERl1EIL. SOh                 0         FXL       04             1 EXTERNAL: LPDR               03                   NRC PDR       02 NSXC              05 TOTAL NUBBER OF COP IEB REQUIRED: LTTR           18   ENCL   14
The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measure to be taken when a barrier is breached, expired on September 30, l986, and on October I, l986.Upon the expiration of the exemptions, the compsensatory measures as described in Attachment of our letter L-85-386 (dated October I I, l985), are continuing to be in place until the Safe Shutdown modifications are complete.Breaches incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions as applicable.
 
Cause and Corrective Actions: The major cause of the breached barriers is the Appendix R Alternative Shutdown work which still remains to be completed.
h h.
Due to the large volume of work being performed, the plant is reporting the breaches in this one report, rather than on a case-by-case basis.The breaches are grouped in two categories (see attached list of breached barriers):
S
2)those breaches which are now closed, but were open for longer than 7 days, and those breaches which were open at the end of December, and were open for longer than 7 days.The plant continues to implement the compensatory measures as applicable.
    ' I vh
PLP I/020/2 4~(gt I I 4 I 4 4'4 H~il 4~A I~~II 4 II jI 4\~~1 II e I A~~4'I 4 I I f4 1'll vl'l l" lt 4 Il I44 lt 4 tl 1 4 4 I 1 I I, 1)II It~'4 1 4 il 4 4 I 4 I, I II'1 l,,i I I II I 4 J~I i I L I I'I 4 I" 4 I''II 1 I~~~
 
ATTACHMENT CLOSED BREACHES OPEN FOR'LONGER THAN 7 DAYS Number 86-0003 86-0037 86-0225 86-0226 Descri tion Structural Steel Fire Proofing New Beam Structural Steel Fire Proofing New Beam Fire Barriers No.180A-E Structural Steel Fire Proofing Member WI6 x 40 Open'ate 10/01/86 10/01/86 12/01/86 12/01/86 Closing Date 12/17/86 12/17/86 12/12/86 12/10/86 86-1006 Fire Door No.1088-1 I I/03/86 I I/28/86 BREACHES OPEN AT THE END OF DECEMBER AND FOR MORE THAN 7 DAYS Number Descri tion~Den Date 86-0224 86-0280 86-0304 86-0305 86-306 86-307 86-308 86-309 86-310 86-311 86-312 86-313 86-314 86-315 86-316 86-317 86-1023 Penetration Seals No.108AN-E006 Raceway Protection No.B-3J1712-4 Conduit Seals No.96W-E013 Conduit Seals No.70E-E008 Conduit Seals No.7 IE-E007 Conduit Seals No.96E-E003 Conduit Seals No.67E-E017 Conduit Seals No.40E-EO I 0 Conduit Seals No.58E-E005 Conduit Seals No.98E-E041 Conduit Seals No.98E-E040 Conduit Seals No.98W-E015 Conduit Seals No.108AE-E003 Conduit Seals No.63W-E005 Conduit Seals No.106E-E015'onduit Seals No.108BE-E002 Fire Door No.58-2 12/01/86 12/18/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/02/86 PLP I/020/3  
P. O. BOX   00, JUNO BEACH, FL 33408-0420
~\I~II KK~'h KK K iih IK 1 h}}
                                                                          ..JANUARY 07 198I L-87-I 0 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.
Should there be any questions on this information, please contact us.
Very truly yours, O. Woody roup Vice President Nuclear Energy COW/PLP/gp Attachment cc:     Regional Administrator, Region ll, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Harold F. Reis, Esquire 8701130250 870107 PDR     ADOCK 05000250 O'S                     PDR PLP I /020/ I                                                                   PEOPLE... SERVING PEOPLE
 
                                                        ~ aaa
                                                              '
'I u       ~ I' ( 4 I   8 I Pl I s                     J i>i l
R II A
                                        ~ 4 'll~
                                                  ~ lt
 
Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers
        ~Pur ose:
Technical Specification 3.I4.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. In accordance with the above requirement, this special report on the breached barriers is being generated in order to notify the NRC. This special report will be updated on a 30 day basis until the Appendix R associated work is complete.
Event:
The plant has been and is continuing to implement numerous modifications, mainly in accordance with Appendix R Alternate Shutdown requirements. The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measure to be taken when a barrier is breached, expired on September 30, l986, and on October I, l986.           Upon the expiration of the exemptions, the compsensatory measures as described in Attachment of our letter L-85-386 (dated October I I, l985), are continuing to be in place until the Safe Shutdown modifications are complete.         Breaches incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions as applicable.
Cause and Corrective Actions:
The major cause of the breached barriers is the Appendix R Alternative Shutdown work which still remains to be completed. Due to the large volume of work being performed, the plant is reporting the breaches in this one report, rather than on a case-by-case basis. The breaches are grouped in two categories (see attached list of breached barriers):
those breaches which are now closed, but were open for longer than 7 days, and
: 2)    those breaches which were open at the end of December, and were open for longer than 7 days.
The plant continues to implement the compensatory measures as applicable.
PLP I /020/2
 
4
                                                                                                                                                      ~(gt   I I
4 4
I 4
                                                                                                                                      '4     H
                                                                                                                                            ~ il 4 ~
A 4
I ~               ~ II                 II jI II 4                         e        I                                                          I
        \
                                                                      ~ ~
A 4 'I   f4                                                     1'll vl'l         l"
                      ~ ~ 1                                          4  I I44 lt 4 Il                                                                     lt 4   tl 1 4   4 I 1 I     I,   1             )
                                                                                          '
II It ~                           4 1 4                                               4                           I 4 I,                 l,,i   I I II I   4 J
                                                                                                                    ~   I il 4                                            I          II '                                                    i 1
I I'I                   4 I    L I "   4   I''
II     1 I ~
                                                                                    ~
                                                                                            ~
 
ATTACHMENT CLOSED BREACHES OPEN FOR'LONGER THAN 7 DAYS Open        Closing Number                 Descri tion              'ate              Date 86-0003 Structural Steel Fire Proofing New Beam 10/01/86        12/17/86 86-0037 Structural Steel Fire Proofing New Beam 10/01/86       12/17/86 86-0225 Fire Barriers No. 180A-E                12/01/86       12/12/86 86-0226 Structural Steel Fire Proofing          12/01/86       12/10/86 Member WI6 x 40 86-1006 Fire Door No. 1088-1                     I I /03/86     I I /28/86 BREACHES OPEN AT THE END OF DECEMBER AND FOR MORE THAN 7 DAYS Number                 Descri tion                       ~Den Date 86-0224 Penetration Seals No. 108AN-E006                 12/01/86 86-0280 Raceway Protection No. B-3J1712-4                 12/18/86 86-0304 Conduit Seals No. 96W-E013                       12/29/86 86-0305 Conduit Seals No. 70E-E008                       12/29/86 86-306  Conduit Seals No. 7 IE-E007                       12/29/86 86-307  Conduit Seals No. 96E-E003                       12/29/86 86-308  Conduit Seals No. 67E-E017                       12/29/86 86-309  Conduit Seals No. 40E-EO I 0                     12/29/86 86-310  Conduit Seals No. 58E-E005                       12/29/86 86-311  Conduit Seals No. 98E-E041                       12/29/86 86-312  Conduit Seals No. 98E-E040                       12/29/86 86-313  Conduit Seals No. 98W-E015                       12/29/86 86-314  Conduit Seals No. 108AE-E003                     12/29/86 86-315  Conduit Seals No. 63W-E005                       12/29/86 86-316  Conduit Seals No. 106E-E015                       12/29/86 86-317            Seals No. 108BE-E002 'onduit 12/29/86 86-1023  Fire Door No. 58-2                               12/02/86 PLP I /020/3
 
~ \ I
      ~ II KK
              ~ 'h KK K
iih IK 1
h}}

Revision as of 08:32, 22 October 2019

Special Rept:Nonfunctional Fire Barrier Penetrations Not Returned to Svc within 7 Days During Mod Implementation. Caused by Expiration of Schedular Exemptions for Alternate Shutdown Requirements.Compensatory Measurements Continuing
ML17347A243
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/07/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
L-87-10, NUDOCS 8701130250
Download: ML17347A243 (8)


Text

REGULATORY I RNATION DISTRIBUTION SYB l (R IDB)

ACCESSION NBR: 8701130250 DOC. DATE: 87/01/07 FACIL:50-250 Tuv keg Point Plant. Unit 3I Flov NOTARXZED: NO ida Potoer and Light C DOCKET 05000250 I

50-251 Tuv keg Point Plant. Unit 42 Flov ida Pokier and Light C 05000251 AUTH. NAl'1E AUTHOR AFFILIATION WOODY'. O. Fl orida Powev Sr Light Co.

RECIP. NANE RECIPIENT AFFXLIATION Recov'd Services Branch (Document Contv ol Desk)

SUBJECT:

Forwards special v ept v e breached five barriev's pev Tech Spec 6. 9. 3.

DIBTRIBUTION CODE: *DODD TXTLE:

COPIEB RECEIVED; LTR OR/Licensing Submittal: Fire Protection

~ ENCL j BIIE:

NOTES:

RECIPIENT COPIES RECIPIENT COP IES ID CODE/NANE LTD ENCL ID CODE/NANE LTTR ENCL PWR-A PD2 LA 1 0 PWR-A PD2 PD 01 5 5 I 1cDONALDi D 1 1 PWR-A PSB INTERNAL: ADN/LFl)B 0 ELD/HDS4 1 0 XE WHITNEY> L 1 Q>S 07 2 2 NRR WERl1EIL. SOh 0 FXL 04 1 EXTERNAL: LPDR 03 NRC PDR 02 NSXC 05 TOTAL NUBBER OF COP IEB REQUIRED: LTTR 18 ENCL 14

h h.

S

' I vh

P. O. BOX 00, JUNO BEACH, FL 33408-0420

..JANUARY 07 198I L-87-I 0 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours, O. Woody roup Vice President Nuclear Energy COW/PLP/gp Attachment cc: Regional Administrator, Region ll, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Harold F. Reis, Esquire 8701130250 870107 PDR ADOCK 05000250 O'S PDR PLP I /020/ I PEOPLE... SERVING PEOPLE

~ aaa

'

'I u ~ I' ( 4 I 8 I Pl I s J i>i l

R II A

~ 4 'll~

~ lt

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers

~Pur ose:

Technical Specification 3.I4.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. In accordance with the above requirement, this special report on the breached barriers is being generated in order to notify the NRC. This special report will be updated on a 30 day basis until the Appendix R associated work is complete.

Event:

The plant has been and is continuing to implement numerous modifications, mainly in accordance with Appendix R Alternate Shutdown requirements. The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measure to be taken when a barrier is breached, expired on September 30, l986, and on October I, l986. Upon the expiration of the exemptions, the compsensatory measures as described in Attachment of our letter L-85-386 (dated October I I, l985), are continuing to be in place until the Safe Shutdown modifications are complete. Breaches incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions as applicable.

Cause and Corrective Actions:

The major cause of the breached barriers is the Appendix R Alternative Shutdown work which still remains to be completed. Due to the large volume of work being performed, the plant is reporting the breaches in this one report, rather than on a case-by-case basis. The breaches are grouped in two categories (see attached list of breached barriers):

those breaches which are now closed, but were open for longer than 7 days, and

2) those breaches which were open at the end of December, and were open for longer than 7 days.

The plant continues to implement the compensatory measures as applicable.

PLP I /020/2

4

~(gt I I

4 4

I 4

'4 H

~ il 4 ~

A 4

I ~ ~ II II jI II 4 e I I

\

~ ~

A 4 'I f4 1'll vl'l l"

~ ~ 1 4 I I44 lt 4 Il lt 4 tl 1 4 4 I 1 I I, 1 )

'

II It ~ 4 1 4 4 I 4 I, l,,i I I II I 4 J

~ I il 4 I II ' i 1

I I'I 4 I L I " 4 I

II 1 I ~

~

~

ATTACHMENT CLOSED BREACHES OPEN FOR'LONGER THAN 7 DAYS Open Closing Number Descri tion 'ate Date 86-0003 Structural Steel Fire Proofing New Beam 10/01/86 12/17/86 86-0037 Structural Steel Fire Proofing New Beam 10/01/86 12/17/86 86-0225 Fire Barriers No. 180A-E 12/01/86 12/12/86 86-0226 Structural Steel Fire Proofing 12/01/86 12/10/86 Member WI6 x 40 86-1006 Fire Door No. 1088-1 I I /03/86 I I /28/86 BREACHES OPEN AT THE END OF DECEMBER AND FOR MORE THAN 7 DAYS Number Descri tion ~Den Date 86-0224 Penetration Seals No. 108AN-E006 12/01/86 86-0280 Raceway Protection No. B-3J1712-4 12/18/86 86-0304 Conduit Seals No. 96W-E013 12/29/86 86-0305 Conduit Seals No. 70E-E008 12/29/86 86-306 Conduit Seals No. 7 IE-E007 12/29/86 86-307 Conduit Seals No. 96E-E003 12/29/86 86-308 Conduit Seals No. 67E-E017 12/29/86 86-309 Conduit Seals No. 40E-EO I 0 12/29/86 86-310 Conduit Seals No. 58E-E005 12/29/86 86-311 Conduit Seals No. 98E-E041 12/29/86 86-312 Conduit Seals No. 98E-E040 12/29/86 86-313 Conduit Seals No. 98W-E015 12/29/86 86-314 Conduit Seals No. 108AE-E003 12/29/86 86-315 Conduit Seals No. 63W-E005 12/29/86 86-316 Conduit Seals No. 106E-E015 12/29/86 86-317 Seals No. 108BE-E002 'onduit 12/29/86 86-1023 Fire Door No. 58-2 12/02/86 PLP I /020/3

~ \ I

~ II KK

~ 'h KK K

iih IK 1

h