Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr
ML17354A787
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-024, L-98-24, NUDOCS 9802190040
Download: ML17354A787 (12)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

~ ~

~w ACCESSION NBR:9802190040 DOC.DATE: 98/01/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, -Unit 3, Florida Power and Light C 05000250 50.;.251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power 5 Light Co.

HOVEY,R.J. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Jan 1998 for Turkey Point, Units 3 R 4.W/980209 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1

'D RECIPIENT CODE/NAME CROTEAU,R COPIES LTTR ENCL 1 1 0

INTERNAL: AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION~REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

I 4 S A

FEB O8 <<l98 L-98-024 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control. Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January 1998 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9802i90040 980i3i PDR ADQCK" 05000250 1 R

PDR fllfffllllllllffllf Ill Ifll Ifllllflllll an FPL Group company

4,, r E N

AVERAG AILY UNIT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point g3 DATE Feb 03, 1998 COMPLETED BY C. L. Mowfey TELEPHONE (305) 246 - 6204 MONTH January, 1998 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 01/01/98 736 01/02/98 737 01/03/98 734 01/04/98 730 01/05/98 725 01/06/98 723 01/07/98 721 01/08/98 718 01/09/98 717 01/10/98 720 01/11/98 728 01/12/98 728 01/13/98 725 01/14/98 724 01/15/98 725 01/16/98 724 01/17/98 731 01/18/98 731 01/19/98 730 01/20/98 727 01/21/98 723 01/22/98 721.

01/23/98 722 01/24/98 720 01/25/98 728 01/26/98 730 01/27/98 728 01/28/98 731 01/29/98 730 01/30/98 728 01/31/98 731

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Februa 5 1998 COMPLETED BY C. L. Mowre TELEPHONE (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 744.0 153861.8
4. Number of Hours Generator Was On Line 744.0 744.0 151702.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 540534.0 540534.0 96953090.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: k k kk DATE: ~kk COMPLETED BY C.

TELEPHONE: 305 246-6204 kkPORk klDNTH k Date Type'uration Reason~ Method of Cause & Corrective Action (Hours) Shutting Co=.~ents Down Reactor~

H/A F - Eorced Reason Method S - Scheduled A - Equipnent Eailure l - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Autonatic Scran

- Regulatory restriction -

- Continued D 4 E Operator Training r Reduction License Exanination 5

9 - Load Other (Explain)

E - Adxtinistrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: N C~

k I DATE: H CDNPLHTHDBT:

THLHPHONH ~N<<- 0 H

HO DN Unit 3 operated at essentially 100% power for the entire month.

AVERAG AILY UNIT POWER LEVEL DOCKET NO. 50- 251 UNIT Turkey Point g4 DATE Feb 03, 1998 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH January, 1998 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 01/01/98 733 01/02/98 733 01/03/98 732 01/04/98 727 01/05/98 723 01/06/98 721 01/07/98 719 01/08/98 718 01/09/98 712 01/10/98 719 01/11/98 725 01/12/98 725 01/13/98 723 01/14/98 721 01/15/98 716 01/16/98 718 01/17/98 728 01/18/98 '729 01/19/98 728 01/20/98 724 01/21/98 721 01/22/98 720 01/23/98 720 01/24/98 721 01/25/98 727 01/26/98 661 01/27/98 264 01/28/98 711 01/29/98 732 01/30/98 731 01/31/98 730

OPERATING DATA REPORT DOCKET NO. 50-251

,UNIT NAME TURKEY POINT UNIT 4 DATE Februa 5 1998 COMPLETED BY C. L. Mowre TELEPHONE (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 744.0 150051.5
4. Number of Hours Generator Was On Line 744.0 744.0 145720.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 525959.0 525959.0 94017596.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 IINIT NAME: T I P ¹I I DATE: kkk I 9999 CDLDLETBD BY: C.

TELEPNDMI: ~6-6 EEPDBTMDNTNI 99 Date Type Duration Reasons Method a Corrective Action to (Hours) of Prevent Recurrence Reactor'ause Shutting Down 1059 1/26/98 0.0 Turbine valve testing; )3 turbine control valve failed to close during test. Problem determined to be in the test device.

f -- forced Reason

- Method S Scheduled A Equipment failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C >> Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Load Reduction License Examination 9 Other (Explain) f - Administrative G Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: Februa 5 1998 COMPLETE BY: C. L. Mowre TELEPHONE:

lfB OR1'ONTHl~

Unit 4 operated at essentially 100% power until January 26, when power was reduced for turbine valve testing. The P3 turbine control valve failed to close during the test; power was reduced further to allow repairs. Power was returned to 100% on January 28, and remained there for the rest of the month.