Text

ACCELERATED DEMONSTPgTION SYSTEM DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007240221 DOC.DATE: 90/07/17 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 900604 & 13,fire barriers breached for more than 7 days. Caused by welding in area.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR TITLE: 50.73/50.9 Licensee Event Report (LER),

ENCL ncide t Rpt,SIZE:etc.

NOTES'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD .

1 1 EDISON,G 1 1 INTERNAL: ACNW 2 2 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB9H3 1 1 NRR/DLPQ/LHFB11 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB11 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR+DS~LBBD1 1 1 NRR/DST/SRXB 8E 1 1 EG RGR2 FIL~ FILE 01 02 1 1

1 1

RES/DSIR/EIB 1 1 EXTERNAL EG&G BRYCE I J ~ H 3 3 L ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHYFG A 1 1 NUDOCS FULL TXT 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 32 gp~

P.O. Box 029100, Miami, FL, 33102-9100 JUL 1 7 1990 L-90-267 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Special Report Breached Fire Barriers and Other Fire Protection S stems Im airments In accordance with Technical Specification 6 '.3.c, the attached Special Report is provided for your information.

Should there be any questions on this information please contact us.

Very truly yours,

~f; ver+

K. N. Harris Plant Vice President Turkey Point Plant Nuclear KNH/JEK/3k Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

SPECIAL REPORT FIRE PROTECTION SYSTEM ZMPAIRMENTS REQUIRING NRC NOTIFICATION PURPOSE CI Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. TS 3.14 also states that certain other conditions require NRC notification. In accordance with the above requirements, this special report is being generated in order to notify the NRC.

EVENT'ee attached list for Fire Protection Impairments (FPI) being reported.

CAUSE AND CORRECTIVE ACTIONS'PI 3418 was issued for the removal and repair of fireproofing impaired for the installation of supports. FPI 3144 is for fire detection taken out of service for welding in the area.

The plant continues,to implement the compensatory measures as applicable.

STATUS UPDATE'lease refer to the attached list for Fire Protection Impairments that were previously reported and are now closed.

SPECIAL REPORT FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE LAST REPORT WHICH HAVE BEEN OPEN LONGER THAN TECH. SPEC. LXMITS FPI FEATURE TYPE OPENED CLOSED 3411 Detector 39-12,14 & 15 06/04/90 3418. Structural Steel 025C 06/13/90 FIRE PROTECTION SYSTEM IMPAIRMENTS PREVIOUSLY NOT REPORTED CLOSED FPI FEATURE TYPE CLOSED FPL LETTER & DATE 2747 Barrier 040S 06/18/90 L-89-364 10/13/89 2795 Barrier 096F 06/27/90 L-89-364 10/13/89

SPECIAL REPORT FIRE PROTECTION SYSTEM IIAPAIRNENTS REQUIRING NRC NOTIFICATION PURPOSE:

Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to func tiona status wi thin 7 days. TS 3. 14 also states 1

that certain other conditions require NRC notification. In accordance with the above requirements, this special report is being generated in order to notify the NRC. Please refer to the attached list for Fire Pro tee tion Impairmen ts (FP I ) being repor ted.

CAUSE AND CORRECTIVE ACTIONS:

FPI 3418 was issued for the removal and repair of fireproofing impaired for the instal lation of supports. FPI 3411 is for f ire detection taken out of service for welding in the area. The plant continues to implement the compensatory measures as applicable.

STATUS UPDATE:

Please refer to the attached list for Fire Protection Impairments that were previously reported and are now closed.

SPECIAL REPORT FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE LAST REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS FPI ¹ FEATURE TYPE OPENED CLOSED 3411 DETECTOR 39-12,14 & 15 06/04/90 / /

3418 STRUCTRUAL STEEL 025C 06/13/90 / /

FIRE PROTECT ION SYSTEM IMPAIRMENTS PREVIOUSLY NOT REPORTED CLOSED FP I ¹ FEATURE TYPE CLOSED FPL LETTER & DATE 2747 BARRIER 040S 06/18/90 L-89-364 10/13/89 2795 BARRIER 096F 06/27/90 L-89-364 10/13/89