Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity.
ML17355A407
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/23/1999
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-01, L-99-174, NUDOCS 9908310219
Download: ML17355A407 (3)


Text

CATEGORY 1 REGULA ~ Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9908310219 DOC.DATE: 99/08/23 NOTARIZED: NO DOCKET FACIL:50-250,Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

.50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AWH.NAME AUTHOR AFFILIATION Florida Power & Light Co.

'OVEY,R.J.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs that FPL 'has completed review of info listed in C reactor vessel integrity database, version 2 & found listed discrepancies,re closure of GL 92-01,rev 1,suppl 1, "Reactor Vessel Structural Integrity."

DISTRIBUTION CODE: A02SD TITLE: Generic Letter 92-01, COPIES RECEIVED:LTR I ENCL Rev 1, Suppl 1 Responses 0(Reactor SIZE:

Vessel Struct E NOTES:

RECIPIENT COPIES RECXPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JABBOUR,K INTERNALlI=FILE~CENTER~01~ 1 NUDOCS-ABSTRACT OGC/RP 1 RES/DET/MEB EXTERNAL: NOAC NRC PDR D

0 U,

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 6

TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL

L-99-174 10 CFR 50, Appendix G U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Closure of Generic Letter 92-01, Revision 1, Su lement 1, "Reactor Vessel Structural Inte rit On July 8, 1999, the NRC issued "Closure of TAC Nos. MA0579 and MA0580 Response to the Requests for Additional Information to Generic Letter 92-01, Revision 1, Supplement 1, 'Reactor Vessel the Turkey Point Plant, Units 3 and 4." The NRC letter requested Integrity,'or that Florida Power and Light Co. (FPL) review and verify the accuracy of the information listed in the Reactor Vessel Integrity Database (RVID), Version 2, for Turkey Point Units 3 and 4. FPL has completed its review of the information listed in the RVID, Version 2, for Turkey Point Units 3 and 4 and found the following discrepancies:

The End of Life (EOL) dates for the Turkey Point units are not correct. The EOL for Unit 3 is July 19, 2012. The EOL date for Unit 4 is April 10, 2013.

2. The wall thickness for the beltline is 7.75 inches for both units.

Should there be any questions, please contact us.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 99083l02l9 990823 PDR ADQCK 05000250 P PDR an FPL Group company