Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr
ML17355A412
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1999
From: Hovey R, Lafleur D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-202, NUDOCS 9909140201
Download: ML17355A412 (13)


Text

REGULA'J Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9909140201 DOC.DATE: 99/08/31 NOTARIZED: NO DOCKET Turkey Point Plant, Unit"3, Florida Power and Light C 05000250 I'AC1L:50-250-5).;25~.- Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAMF. AUTHOR AFFILIATION LAFLEUR,D.k. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION C

SUBJECT:

Monthly operating repts for .Aug 1999 for Turkey Point, Units 3 &, 4. With 990909 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

COPIES RECIPIENT COPIES 0

RECIPIENT'D CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JABBOUR 1 1 1 1 OC/DBA/PAD 1 1 RES/DRAA/OERAB 1 1 RGN2 1 1:

EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

U

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

>f 'r, ~

~

, t 0

SEP 09 1SSS L-99-202 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-Au ust 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region H, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9909i4020i 9'P083i p ( l'i,"< 45 PDR ADQCK 05000250 R PDR an FPL Group company

J-AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250

¹ DATE: Se tember 7 1999 COMPLETED BY: D. R. Lafleur LHLH HONE HH DHLMDNLH>>999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 8/1/99 693 8/2/99 693 8/3/99 693 8/4/99 695 8/5/99 698 8/6/99 698 8/7/99 691 8/8/99 688 8/9/99 686 8/10/99 686 8/11/99 687 8/12/99 687 8/1 3/99 689 8/14/99 695 8/15/99 696 8/16/99 682 8/17/99 693 8/18/99 699 8/19/99 697 8/20/99 693 8/21/99 692 8/22/99 698 8/23/99 704 8/24/99 702 8/25/99 693 8/26/99 691 8/27/99 689 8/28/99 693 8/29/99 693 8/30/99 691 8/31/99 687

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Se tember 7 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 5804.6 1667'I4.5
4. Number of Hours Generator Was On Line 744.0 5798.3 164515.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 515326 4079532 105900391

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT'. I N DATE: Se tember 7 1999 COMPLETED BY: D.R. Lafleur TE 9 HONE: 999 I->>

EETOIIT MONTH ~i999 Unit 3 operated at essentially 100% for the month of August, 1999.

UNIT SHUTDOWNS DOCKET NO. 50-250 UNIT NAME: 9 I M DATE: Se tember 7 1999 COMPLETED BY: D. R. Lafleur TELEPHOMI: ~6->> 9 EEPOET MONTH 999 No. Type'uration Reason'ethod of Shutting Cause & Corrective Action Cocments (Hours)

Down Reactor N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DMD>>'

DOCKET NO.

DATE:

50-251 Se tember 7 1999 COMPLETED BY: D. R. Lafleur PELEPHDNE. ~0 EE D PMDNPH DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 8/1/99 695 8/2/99 696 8/3/99 696 8/4/99 698 8/5/99 701 8/6/99 701 8/7/99 694 8/8/99 692 8/9/99 690 8/10/99 691 8/11/99 694 8/12/99 696 8/13/99 697 8/14/99 702 8/15/99 703 8/16/99 696 8/1 7/99 699 8/18/99 704 8/1 9/99 702 8/20/99 700 8/21/99 697 8/22/99 702 8/23/99 709 8/24/99 706 8/25/99 698 8/26/99 696 8/27/99 694 8/28/99 698 8/29/99 698 8/30/99 696 8/31/99 692

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Se tember 7 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 5277.7 163345.3
4. Number of Hours Generator Was On Line 744.0 5256.8 158993.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy(MWH) 519144 3659698 103332796

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: I'e DATE: tember 7 1999 COMPLETE BY: D. R. Lafleur TELEPHONE: ~6->>

llH 0 T MONTH A~999 Unit 4 operated at essentially 100% for the entire month of August, 1999.

UNIT SHUTDOWNS DOCKET NO. 50-251 DNIT NAME:

  • P I Se tember 7 1999 I'ATE:

COMPLETED BY: D. R. Lafleur TELEPHDM!. HPPE->>

REPDRTMDNTH A 9 9 No. Date Type'uration Reason'ethod of Cause & Corrective Action (Hours) Shutting Cocments Down Reactor N/A N/A N/A N/A N/A N/A N/A P Forced Reason Method S - Scheduled A - Equipment Pailure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Other (Explain)

License Examination P - AcL<nistrative G - Operational Error (Explain)

H - Other (Explain)

0 4 I

)