ML17345A639

From kanterella
Jump to navigation Jump to search
Special Rept:On 890312,16 & 27 Fire Protection Impairments Opened for Repairs & Not Returned to Functional Status within 7 Days,Per Tech Spec 3.14.5.b.Discrepancies Identified by Fire Door Surveillance Being Evaluated
ML17345A639
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/21/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-154, NUDOCS 8904260359
Download: ML17345A639 (7)


Text

AC CELE PATED D1ORl Bt 'Tl 04 DEN 04 STE1 0.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8904260359 DOC.DATE: 89/04/21 NOTARIZED: NO DOCKET I FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. - Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 890312 & 16,fire protection impairments opened for repairs.

DISTRXBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 AEOD/ROAB/DS P 2 2 DEDRO 1 1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE SH 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 1 NRR/DES T/ES B 8D 1 1 NRR/DEST/ICSS 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR DOEA/EAB 11 1 1 NRR/DREP/RPB 10 2 2 SIB 9A 1 1 NUDOCS-ABSTRACT 1 1 02 1 1 RES/DSIR/EIB 1 1 RES/DSR/PRAB 1 1 RGN2 FILE 01 1 1 EXTERNAL EG &G WILLIAMSI S 4 FORD BLDG HOY I A 1 1 R L ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 I NSIC MURPHY,G.A 1 1 D

D Mls, '?O ALL "RXDS" RECIPIENIS'IZAS S

HELP US TO REDUCE HASTE.'ÃI'ACZ 'IHE EOCUMEh"Z 02iTBOL DPI ROCY Pl-37 (EXT. 20079) KO EZJMZNATE YOUR NME FKR DISTRIBVI'ION LISTS FOR DOCUMENIS YOU MN'T NEEDt TOTAL NUMBER OF COPXES REQUIRED: LTTR 44 ENCL 43

P.O. Box 14000, Juno Beach, FL 33408.0420 APR(L 2 1 1989 L-89-154 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re,: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Special Report Breached Fire Barriers and Other Fire Protection S stem Im airments In accordance with Technical Specification 6.9.3.c, the attached Special Report is provided for your information.

Should there be any questions 'on this information, please contact us ~

Very truly yours, Senior Vi e President Nuclear WFC/JRH/cm Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant c;904.>g(l3 PDR AEiOCK

<9 85'0421 0:0002.

PDC 0

y/P S

an O'L Group cang>ut ~

Attachment:

SPECIAL REPORT FIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION PURPOSE Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7. days. TS 3.14 also states that certain other conditions require NRC notification. In accordance with the above requirements, this special report is being submitted in order to notify the NRC.

EVENT Fire Protection Impairment (FPI) 2337 was opened on barrier 093C.

FPI 2347 is on detector alarm point 29. FPI 2348 was opened on thermolag barrier B-3K1811.. FPI 2365 was opened on thermolag barrier 4F141. .FPIs 2379 thru 2383, 2385 thru 2387, 2390 thru 2440 and 2443 thru 2446 were opened for not meeting acceptance criteria

'uring the performance of the semi-annual fire door surveillance.

See the attached list.

CAUSE AND CORRECTIVE ACTIONS FPI 2337, opened March 12, 1989 to repair a cracked barrier, was closed on March 21, 1989. FPI 2347, opened March 16, 1989 -for welding in area, was closed on April 4, 1989. FPI 2348, opened March 16, 1989 for thermolag repair, was closed on March 23, 1989.

FPI 2365, opened March 27, 1989 to remove a pump, is still being worked. Engineering is presently evaluating the discrepancies identified by the fire door surveillance. The plant continues to implement the compensatory measures as applicable.

STATUS UPDATE FPI 2311, reported open in FPL letter L-89-130, dated April 4, 1989,. was closed on March 23, 1989. FPI 2204, reported open in FPL letter L-89-012, dated January 9, 1989, was closed March 30, 1989.

FPI 2257, reported open in FPL -letter L-89-58, dated February 23, 1989, was closed on April 1, 1989. FPI 2297, reported open in FPL letter L-89-114, dated. March 23, 1989, was closed on April 4, 1989.

FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE LAST REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECHNICAL SPECIFICATION LIMITS FPI FEATURE TYPE OPENED CLOSED 2337 Barrier 093C 03/12/89 03/2 1/89 2347 Detector 29-1 & 29-2 03/16/89 04/04/89 2348 Thermolag Barrier B-3K1811 03/16/89 03/23/89 2365 Thermolag Barrier 4F141 03/27/89 2379 Door 61-2 03/27/89 2380 Door 61-1 03/27/89 2381 Door 67-1 03/27/89 2382 Door 67-2 03/27/89 2383 Door 67-3 03/27/89 2385 Door 68-1 03/27/89 2386 Door 63-2 03/27/89 2387. Door 63-1 03/27/89 2390 Door 72-1 03/27/89 2391 Door 74-1 03/27/89 2392 Door 70-1 03/27/89 2393 Door 70-2 03/27/89 2394 Door 71-1 03/27/89 2395 Door 131-2 03/27/89 2396 Door 73-1 03/27/89 2397 Door 75-1 03/27/89 2398 Door 72-2 03/27/89 2399 Door 132-2 03/27/89 2400 Door 104-3 03/27/89

FPI FEATURE TYPE OPENED CLOSED 2401 Door 106-2 03/27/89 2402 Door 132-1 03/27/89 2403 Door 97-1 03/27/89 2404 Door 98-2 03/27/89 2405 Door 104-1 03/27/89 2406 Door 108A-1 03/27/89 Door 58-4 03/27/89 2407'408 Door 30-2 03/27/89 2409 Door 30-1 03/27/89 2410 Door 46-1 03/27/89, 2411 Door 58-3 03/27/89 Door 40-2 03/27/89 2413 Door 40-1 03/27/89 2414 Door 55-1 03/27/89 2415 Door 41-1 22-1'412 03/27/89

'2416 Door 28-1 03/27/89 2417 Door '.

03/27/89 2418 Door 21-1 03/27/89 2419 Door 25-1 03/27/89 2420 Door 20-1 03/27/89 2421 Door 19-1 03/27/89 2422 Door 26-1 03/27/89 2423 Door 108A-2 03/27/89 2424 Door 108A-3 03/27/89 2425 Door 108A-4 03/27/89 2426 Door 98-1 03/27/89

FPI FEATURE TYPE OPENED CLOSED 2427 Door 104-2 03/27/89 2428 Door 106-1 03/27/89 2429 Door 96-2 03/27/89 2430 Door 108B-1 03/27/89 2431 Door 108B-2 03/27/89 2432 Door 95-1 03/27/89 2433 Door 93-1 03/27/89 2434 Door 94-2 03/27/89 2435 Door 94-1 03/27/89 2436 Door 15-1 03/27/89 2437 Door 27-1 03/27/89 2438 Door 58-'2 03/27/89 2439 Door 58-1 03/27/89 2440 Door 58-1 03/27/89 2443 Door 96-1 03/27/89 2444 Door 62-2 03/27/89 2445 Door 62-1 03/27/89 2446 Door 12-1 03/27/89