Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr
ML17355A226
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/1999
From: Hovey R, Shukla G
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-033, L-99-33, NUDOCS 9902220174
Download: ML17355A226 (12)


Text

4 CATEGORY REGULAR RY INFORMATION ly DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9902220174 DOC.DATE: 99/01/31 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C DOCKET 05000250 I

50,-251 'urkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION SHUKLA,G.S. Florida Power & Light Co.

HOVEY,R.J. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Jan 1999 for Turkey Point, Units 3 & 4.With 990211 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:'

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 '

JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ILE CE ER 0 1 1 OC/DBA/PAD 1 GN 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 1

1 NOAC 1 . l.

D 0

'N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

~ ~ ~

FFFI >1~999 L-99-033 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and, the guidance of Generic Letter 97-02, attached are the January, 1999 Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant GSS Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant g go) )6 9902220174 990iSi, PDR ADQCK 05000250 R

PDR'n FPL Group company

~ ~ ~

,' ~

6 AVERAGE DAILYVNIT POWER LEVEL DOCKET NO. 50-250 UNIT: I ¹ DATE: 9 999 COMPLETED BY: G. S. Shukla TELEPHONE: 6660 6-60 EEPOEI'ONTH ~J9 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 1/1/99 729 1/2/99 727 1/3/99 725 1/4/99 728 1/5/99 738 1/6/99 742 1/7/99 740 1/8/99 735 1/9/99 731 1/1 0/99 727 1/11/99 735 1/12/99 737 1/13/99 733 1/14/99 729 1/1 5/99 726 1/16/99 724 1/17/99 720 1/18/99 718 1/19/99 716 1/20/99 715 1/21/99 712 1/22/99 717 1/23/99 720 1/24/99 722 1/25/99 729 1/26/99 729 1/27/99 728 1/28/99 726 1/29/99 725 1/30/99 722 1/31/99 720

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE COMPLETED BY G. S. Shukla TELEPHONE (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 744.0 161 654.0
4. Number of Hours Generator Was On Line 744.0 744.0 159461.6
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 540584.0 540584.0 102361443.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DNIINAME: 9 I M DATE: *9 9 9 COMPLETED BY: G. S. Shukla TELEPNDM!. QM 6-6 EEPDET MDNTN 9~999 Type'uratio Reason Method of Corrective Action No.

Reactor'ause a

n Shutting Coaraents (Hours) Down N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continued E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT. 9 P I 63 DATE: 9 COMPLETED BY: G. S. Shukla I'ELEPHONE: ~6-60 REPORT MONTH ~I99 Unit 3 operated at essentially 100% for the entire month of January, 1999.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT'.

DATE:

50-251 9

I 'I 999 COMPLETED BY:

I'ELEPEDNE. '~6-60G. S. Shukla KIPDEI'DNTN~J¹9 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1/1/99 726 1/2/99 723 1/3/99 722 1/4/99 725 1/5/99 734 1/6/99 735 1/7/99 733 1/8/99 730 1/9/99 725 1/10/99 723 1/11/99 730 1/12/99 732 1/13/99 730 1/14/99 660 1/1 5/99 720 1/1 6/99 719 1/1 7/99 717 1/1 8/99 716 1/1 9/99 715 1/20/99 714 1/21/99 714 1/22/99 717 1/23/99 720 1/24/99 721 1/25/99 726 1/26/99 728 1/27/99 726 1/28/99 725 1/29/99 724 1/30/99 720 1/31/99 720

OPERATING DATAREPORT 50-251 DOCKET NO.

UNIT NAME TURKEY POINT UNIT 4 DATE Februa 4 1999 COMPLETED BY TELEPHONE LW "'""

G. S. Shukla

. (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 744.0, 158811.5
4. Number of Hours Generator Was On Line 744.0 744.0 154480.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 536896.0 536896.0 100209994.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251

¹I DIET NAME:

DATE: ~b9 T ¹ COMPLETED BY: G. S. Shukla I

9 TELEPHDNH: M¹06-60 MIPDET MDNI'H I 999 No. Duration Reason* Method of & Corrective Action to (Hours)

Reactor'ause Shutting Down Prevent Recurrence 19990001 01/14/1999 0.0 Turbine Valve Test P - Forced Reason Method S - Scheduled A - Equiprent Pailure 1 - Manual E - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 Load Reduction License Examination 9 - Other (Explain)

P - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point ¹4 DATE: Februa 4 1999 COMPLETE BY: G. S. Shukla TELEPHONE: L0D 6-6 MIPDRT MONTH J~

Unit 4 operated essentially at 100% in the beginning of the month of January, 1999. On January 14, 1999 the power was reduced to 65% to perform the Turbine Valve Test. Unit 4 resumed 100% power the same day and stayed essentially at 100% for rest of the month of January, 1999.

j Q~ 1