Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr
ML17355A398
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1999
From: Hovey R, Shukla G
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, L-99-179, NUDOCS 9908170162
Download: ML17355A398 (12)


Text

UA."j.Jt'GUS, Y 3. .

REGULA'l Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSXON NBR:9908170162 DOC.DATE: 99/07/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

,50-.251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION Florida Power & Light Co.

'HUKLA,G."ST HOVEY,R.J. Florida Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthly operating repts for July 1999 for Turkey Point, Units 3 S 4.With 990809 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCZ1 ID CODE/NAME LTTR ENCL JABBOUR,K 1 1 XNTERNAL ILE CENTER 01 1 1 OC/DBA/PAD 1 1 DRAA OE 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

0

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

'AUG 09 lg9g AUt'> <see L-99-179 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort- Jul 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant GSS Attachments cc: Regional Administrator, Region II, USNRC

, Senior Resident Inspector, USNRC, Turkey Point Plant K6W 99073i '908i70ib2 ADOCX 05000250 'DR

(

R PDR an FPL Group company

II W

)

f "'"

W I' Ql H

~ ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT:

DATE:

~ki 50-250 A~4999

¹ COMPLETED BY: G. S. Shukla 9¹LE¹EONE: L¹6 46-69 REPORT MONTH ~Jul 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 7/1/99 704 7/2/99 705 7/3/99 709 7/4/99 707 7/5/99 703 7/6/99 702 7/7/99 697 7/8/99 695 7/9/99 693 7/1 0/99 698 7/1 1/99 699 7/12/99 695 7/1 3/99 695 7/14/99 695 7/1 5/99 696 7/1 6/99 699 7/1 7/99 701 7/1 8/99 700 7/19/99 697 7/20/99 697 7/21/99 691 7/22/99 688 7/23/99 685 7/24/99 686 7/25/99 686 7/26/99 683 7/27/99 683 7/28/99 681 7/29/99 686 7/30/99 690 7/31/99 693

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE COMPLETED BY G. S. Shukla TELEPHONE 305 246-6047 REPORTING PERIOD ~Jul 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 5060.6 165970.6
4. Number of Hours Generator Was On Line 744.0 5054.3 163771.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 516908.0 3564206.0 105385065.0

UNIT SHUTDOWNS DOCKET NO. 50-250 DNIINAME: 9 P I ¹ DAI'E: ~6999 COMPLETED BY: G. S. Shukla I'ELEPNDNE: 4220 246-60 REPORT MONTH J~ul 1999 Date Types Duration Reason'ethod of corrective Action No.

(Hours)

Reactor'ause Shutting Down a

Cocaents N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

~¹i 50-250 6" 99

¹ COMPLETED BY: G. S. Shukla TELE¹EUMI: ~06-6 REPORT MONTH ~Jul 1999 Unit 3 operated at essentially 100% for the month of July, 1999.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT. I 96 DATE: 999 COMPLETED BY: G. S. Shukla TELEPEUNE. ~05 6-60 REPORT MONTH ~Jul 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 7/1/99 695 7/2/99 704 7/3/99 709 7/4/99 707 7/5/99 702 7/6/99 701 7/7/99 697 7/8/99 690 7/9/99 694 7/10/99 698 7/11/99 699 7/12/99 696 7/13/99 696 7/14/99 695 7/1 5/99 688 7/16/99 646 7/17/99 204 7/18/99 531 7/19/99 695 7/20/99 698 7/21/99 696 7/22/99 693 7/23/99 691 7/24/99 691 7/25/99 690 7/26/99 688 7/27/99 688 7/28/99 684 7/29/99 690 7/30/99 693 7/31/99 694

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Au ust 4 1999 COMPLETED BY G. S. Shukla TELEPHONE 305 246-6047 REPORTING PERIOD J~ul 1999 (MonthNear)

1. Design Electricai Rating (MWe-Net) 720
2. Maximum Dependable Capacity(MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 4533.7 162601.2
4. Number of Hours Generator Was On Line 744.0 4512.8 158249.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 500220.0 31 40554.0 102813652.0

UNIT SHUTDOWNS DOCKET NO. 50-251 UNIT NANE:

DATE:

COMPLETED BY:

~AI T 9 P G. S. Shukla I 90 99 TELEPEONE 69906 6-606 REPORT MONTH ~Jul 1999 No. Date Duration Reason Method of Cause a Corrective Action (Hours) Shutting Comments Down Reactor N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Exa1aination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

¹ ¹ ¹p V ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: ¹ i ¹ DATE: Au st 4 1999 COMPLETE BY:

TELEPHONE: ~6-<<

G. S. Shukla REPORT MONTH J~ul 1999 Unit 4 operated at essentially 100% for the entire month of July, 1999, except between July 17 - 18, 1999, when power was reduced to perform Turbine Valve Test, and maintenance work on the Turbine Plant Cooling Water Heat Exchanger and the Moisture Separator Reheater.

{ 'oy

~ ~