Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr
ML17354B077
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-206, NUDOCS 9808140158
Download: ML17354B077 (15)


Text

CATEGORY 1

~ ~ REGULA> Y XNFORMATION DISTRIBUTIO SYSTEM (RIDS) t ACCESSION NBR:9808140158 DOC.DATE: 98/07/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION MOWREY,C.R. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for July 1998 for Turkey Point, Units 3 & 4.W/980810 ltr. A DXSTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: T TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT XD CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1

'D RECIPIENT CODE/NAME JABBOUR COPIES LTTR ENCL 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

~ I C

l ~~

t 4

l(

l I t ~

I'510 1998 L-98-206 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 M~ontht Op~cretin Report In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 1998 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9808i40158 ADOCK 05000250 98073'DR R PDR an FPL Group company

~ ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: Turke Point 83 DATE: I DDEDLE EDDY: ~C.

I'ELE DEE:

REPORT MONTH ~Jul 1998 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 7/1/98 692 7/2/98 689 7/3/98 689 7/4/98 688 7/5/98 693 7/6/98 689 7/7/98 689 7/8/98 690 7/9/98 688 7/1 0/98 687 7/11/98 693 7/12/98 697 7/1 3/98 699 7/14/98 702 7/1 5/98 702 7I16I98 696 7/1 7/98 689 7/1 8/98 688 7/1 9/98 689

?/20/98 691 7/21/98 695 7/22/98 624 7/23/98 374 7/24/98 688 7/25/98 695 7/26/98 695 7/27/98 691 7/28/98 690 7/29/98 689 7/30/98 691 7/31/98 691

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Au ust 3 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD ~Jul 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 5006.5 158124.3
4. Number of Hours Generator Was On Line 744.0 4997.8 155956.7
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 505418.0 3519775.0 99932331.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 83 DATE: Au>ust 3 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH ~Jul 1998 Ho. Date Duration Reasons Method of corrective Action TyPe Reactor'ause s

(Hours) Shutting Cosments Down 1067 7(22/98 0.0 Turbine Plant Cooling Mater: heat exchanger cleaning, pump bearing replacement 2

F - Forced Reason Method 1 - Manual S - Scheduled A - Equ/pment failure 2 Manual Scram B - Maintenance or Test 3 - Autolnatic Scram C - Refueling 4 - Continued D - Regulatory restriction 5 Load Reduction E Operator Training 6 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~ ~

~ ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point ¹3 DATE: 3 9 8 COMPLETED BY: C.

TELEPHONE: 305 246-6204 REPORT MONTH ~Jul 1998 Unit 3 operated at essentially 100% power until July 22, when power was reduced to 30% to clean a Turbine Plant Cooling Water (TPCW) heat exchanger, and to replace a bearing on a TPCW pump (due to high vibration). Power was returned to 100% on July 24, and stayed at approximately 100% for the remainder of the month.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

ON:

DATE:

~ki I 50-251 COMPLETE T: C. L TELEP OMI:

REPORT MONTH ~Jikl 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 7/1/98 695 7/2/98 693 7/3/98 692 7/4/98 693 7/5/98 697 7/6/98 693 7/7/98 693 7/8/98 693 7/9/98 690 7/1 0/98 690 7/11/98 696 7/1 2/98 698 7/1 3/98 701, 7/14/98 703 7/1 5/98 704 7/1 6/98 698 7/1 7/98 692 7/1 8/98 691 7/1 9/98 691 7/20/98 692 7/21/98 697 7/22/98 699 7/23/98 698 7/24/98 697 7/25/98 697 7/26/98 697 7/27/98 693 7/28/98 692 7/29/98 691 7/30/98 692 7/31/98 693

J OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Au ust 3 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD ~Jel 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 5087.0 154394.5
4. Number of Hours Generator Was On Line 744.0 5087.0 150063.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 516966.0 3589580.0 97081217.0

~ r~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: k* i 8 DATE: Auoust 3 1998 COMPLETED BY: L.

TELEPHONE: 305 246-6204 REPORT MONTH ~Jul 1998 No. Duration Reasons Method of r Corrective Action to (Hours)

Reactor'ause Shutting Down Prevent Recurrence M/A H/A M/A 2

F - Forced Reason Method S - Scheduled A - Equipment Failure -

l Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training s 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

4 ft I

SlJMMARY OF OPERATfNG EXPERIENCE DOCKET NO. 50-251

!!M DATE:

CD

!'! !! DN!I::P~

!!!'! BY:

REPORT MONTH J~ul 1998 Unit 4 operated at essentially 100% for the entire month.