MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULATO Z INFORMATION DISTRIBUTXO STEM (RXDS)
ACCESSION NBR:9712220353 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 r'-50'~'251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power E Light Co.
HOVEY,R.J. Florida Power &. Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Nov 1997 for Turkey Point, Units 3 & 4.W/971215 A CODE: IE24D COPIES RECEIVED:LTR i SIZE:
ltr.'ISTRIBUTION ENCL T TITLE: Monthly Operating Report (per Tech Specs)
E NOTES:
RECIPIENT COPIES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 XLE CENTER 1 1 1 OC/DBA/PAD 1 1 G 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9
P, ie
DEC 15 1997 L-97-305 FIPI! 10 CFR 550.36
/
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC 84%'7 Senior Resident Inspector, USNRC, Turkey Point Plant amaOS53 en<SO PDR ADOCX aSoomSO~ I R
lllll lllllllllllllllllIlllllIIllllll
>rr FPL Group compooy
C) y A "I
i L
~' ( << ". 't W
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point 0'3 DATE Dec 02, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH November, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1101197 709 11/02/97 710 11/03/97 714 11/04/97 727 11/05/97 732 11/06/97 729 11107197 721 11/08/97 727 11/09/97 731 11/1 0/97 729 11/11/97 725 11/12/97 721 11/1 3/97 718 1111 4197 716 11/15/97 714 11/16/97 717 1111 7197 641 11/1 8/97 371 11/19/97 628 11/20/97 724 11/21/97 723 11/22/97 722 11/23/97 716 11/24/97 719 11/25/97 727 11/26/97 731 11/27/97 729 11/28/97 727 11129197 725 11/30/97 722
DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE December 2 1997 C. L. Mowre COMPLETED BY TELEPHONE WW REPORTING PERIOD November 1997 (Month/Year)
- 1. Design Electrical Rating (MWe-Net) 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Was Critical 720.0 6922.3 152373.8
- 4. Number of Hours Generator Was On Line 720.0 6827.8 150214.9
- 5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
- 6. Net Electrical Energy (MWH) 507437.0 4711505.0 95871711.0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: ~k ~
DATE: December 3 1997 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTHNovember 1997 No. Date Type Duration Reason~ Method of Corrective Action Reactor'ause (Hours) Shutting Comments Down 1056 11/17/97 0.0 Turbine valve testing 10S7 11/17/97 0.0 Cleaning/inspection of condenser water boxes and Turbine Plant Cooling Water system F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)
F - Administrative 6 Operational Error (Explain)
H - Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: 6 I N DATE: December 2 1997 COMPLETED BY:
TELE NONE: ~6
~C. L. M REPORT MONTH November 1997 Unit 3 operated at essentially 100% power until November 17, when power was reduced for turbine valve testing. Power was held at 50% through all of November 18 to allow for cleaning and inspection of condenser water boxes and the Turbine Plant Cooling Water system. Power was returned to 100% on November 19, and remained there for the rest of November.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point ¹4 DATE Dec 02 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH November, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/97 713 11/02/97 713 11/03/97 718 11/04/97 726 11/05/97 730 11/06/97 726 11/07/97 722 11/08/97 725 11/09/97 729 11/1 0/97 727 11/11/97 723 11/1 2/97 719 11/1 3/97 718 11/1 4/97 716 11/15/97 716 11/1 6/97 717 11/1 7/97 718 11/1 8/97 727 11/1 9/97 727 11/20/97 720 11/21/97 691 11/22/97 - 717 11/23/97 712 11/24/97 716 11/25/97 725 11/26/97 728 11/27/97 726 11/28/97 725 11/29/97 722 11/30/97 720
~4
~
~
OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE December 2 1997 COMPLETED BY C. L. Mowre TELEPHONE 305 246%204 REPORTING PERIOD November 1997 (Month/Year)
- 1. Design Electrical Rating (MWe-Net) 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Was Critical 720.0 7110.5 'l 48563.5
- 4. Number of Hours Generator Was On Line 720.0 7066.5 144232.5
- 5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
- 6. Net Electrical Energy (MWH) 518639.0 4902561.0 92951639.0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 CNP T'AME T~k i PP DATE: December 3 1997 CCMPLETBC BY:
TELEPHONE: ~P-C. L.
REPORT MONTHNovember 1997 No. Date Type Duration Reasons Hethod Cause & Corrective Action to (Hours) of Prevent Recurrence Shutting Down Reactor~
N/A F - Forced Reason Hethod S - Scheduled A -
- Equipment Failure l - Manual B Haintenance or Test 2 - Hanual Scram C - Refueling 3 Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training ( S - Load Reduction License Examination 9 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
OF< OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: December 2 1997 COMPLETE BY: C. L. Mowre TELEPHONE:
REPORT MONTH November 1997 Unit 4 operated at approximately 100% power for the entire month of November.
0 C
'