CATEGORY 1 REGULATO Z INFORMATION DISTRIBUTXO STEM (RXDS)

ACCESSION NBR:9712220353 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 r'-50'~'251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power E Light Co.

HOVEY,R.J. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1997 for Turkey Point, Units 3 & 4.W/971215 A CODE: IE24D COPIES RECEIVED:LTR i SIZE:

ltr.'ISTRIBUTION ENCL T TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 XLE CENTER 1 1 1 OC/DBA/PAD 1 1 G 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

P, ie

DEC 15 1997 L-97-305 FIPI! 10 CFR 550.36

/

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC 84%'7 Senior Resident Inspector, USNRC, Turkey Point Plant amaOS53 en<SO PDR ADOCX aSoomSO~ I R

lllll lllllllllllllllllIlllllIIllllll

>rr FPL Group compooy

C) y A "I

i L

~' ( << ". 't W

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point 0'3 DATE Dec 02, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH November, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1101197 709 11/02/97 710 11/03/97 714 11/04/97 727 11/05/97 732 11/06/97 729 11107197 721 11/08/97 727 11/09/97 731 11/1 0/97 729 11/11/97 725 11/12/97 721 11/1 3/97 718 1111 4197 716 11/15/97 714 11/16/97 717 1111 7197 641 11/1 8/97 371 11/19/97 628 11/20/97 724 11/21/97 723 11/22/97 722 11/23/97 716 11/24/97 719 11/25/97 727 11/26/97 731 11/27/97 729 11/28/97 727 11129197 725 11/30/97 722

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE December 2 1997 C. L. Mowre COMPLETED BY TELEPHONE WW REPORTING PERIOD November 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 6922.3 152373.8
4. Number of Hours Generator Was On Line 720.0 6827.8 150214.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 507437.0 4711505.0 95871711.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: ~k ~

DATE: December 3 1997 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTHNovember 1997 No. Date Type Duration Reason~ Method of Corrective Action Reactor'ause (Hours) Shutting Comments Down 1056 11/17/97 0.0 Turbine valve testing 10S7 11/17/97 0.0 Cleaning/inspection of condenser water boxes and Turbine Plant Cooling Water system F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative 6 Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: 6 I N DATE: December 2 1997 COMPLETED BY:

TELE NONE: ~6

~C. L. M REPORT MONTH November 1997 Unit 3 operated at essentially 100% power until November 17, when power was reduced for turbine valve testing. Power was held at 50% through all of November 18 to allow for cleaning and inspection of condenser water boxes and the Turbine Plant Cooling Water system. Power was returned to 100% on November 19, and remained there for the rest of November.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point ¹4 DATE Dec 02 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH November, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/97 713 11/02/97 713 11/03/97 718 11/04/97 726 11/05/97 730 11/06/97 726 11/07/97 722 11/08/97 725 11/09/97 729 11/1 0/97 727 11/11/97 723 11/1 2/97 719 11/1 3/97 718 11/1 4/97 716 11/15/97 716 11/1 6/97 717 11/1 7/97 718 11/1 8/97 727 11/1 9/97 727 11/20/97 720 11/21/97 691 11/22/97 - 717 11/23/97 712 11/24/97 716 11/25/97 725 11/26/97 728 11/27/97 726 11/28/97 725 11/29/97 722 11/30/97 720

~4

~

~

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE December 2 1997 COMPLETED BY C. L. Mowre TELEPHONE 305 246%204 REPORTING PERIOD November 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 7110.5 'l 48563.5
4. Number of Hours Generator Was On Line 720.0 7066.5 144232.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 518639.0 4902561.0 92951639.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 CNP T'AME T~k i PP DATE: December 3 1997 CCMPLETBC BY:

TELEPHONE: ~P-C. L.

REPORT MONTHNovember 1997 No. Date Type Duration Reasons Hethod Cause & Corrective Action to (Hours) of Prevent Recurrence Shutting Down Reactor~

N/A F - Forced Reason Hethod S - Scheduled A -

- Equipment Failure l - Manual B Haintenance or Test 2 - Hanual Scram C - Refueling 3 Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training ( S - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: December 2 1997 COMPLETE BY: C. L. Mowre TELEPHONE:

REPORT MONTH November 1997 Unit 4 operated at approximately 100% power for the entire month of November.

0 C

'