Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr
ML17354A758
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-002, L-98-2, NUDOCS 9801220010
Download: ML17354A758 (12)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9801220010 DOC.DATE: 97/12/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

.50-251'urkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power &. Light Co.

HOVEY, R. J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1997 for Turkey Point, Unit 3 4.W/980112 ltr. A DISTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: T TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL " ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 '

1 ILE CENTER 1 1 OC/DBA/PAD 1 GN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N I

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US'TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

~

JANI 23998 L-98-002 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 980i2200i0 97i23i PDR R

ADOCK 05000250 PDR

~ QgL.

1'iele4~)

j IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point g3 DATE Jan 05, 1998 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH December, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/97 721 12/02/97 727 12/03/97 727 12/04/97 725 12/05/97 729 12/06/97 735 12/07/97 738 12/08/97 737 12/09/97 732 12/10/97 720 12/11/97 716 12/12/97 716 12/13/97 717 12/14/97 722 12/15/97 732 12/16/97 735 12/17/97 738 12/18/97 737 12/19/97 737 12/20/97 734 12/21/97 729 12/22/97 721 12/23/97 720 12/24/97 717 12/25/97 717 12/26/97 714 12/27/97 715 12/28/97 727 12/29/97 732 12/30/97 735 12/31/97 736

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Janua 5 1998 COMPLETED BY C. L. Mowre TELEPHONE REPORTING PERIOD December 1997 (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 7666.3 153117.8
4. Number of Hours Generator Was On Line 744.0 7571.8 150958.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 540845.0 5252350.0 96412556.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: T~IP COMPLETED BY:

J~999 I'ATE:

C. L. M TELEPEDNB: QMP 9-REPORT MONTH December 1997 No. Date Type Duration Reason'ethod of Corrective Action Reactor'ause 4

(Hours) Shutting Co~ents Dawn N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scran C - Refueling 3 - Autcctatic Scran D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H Other (Explain)

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

~ki 50-250 N

CDNPLETEDBY: C.

I'HLEPHDNE:

REPORT MONTH December 1997 Unit 3 operated at essentially 100% power for the entire month of December.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point g4 DATE Jan 05, 1998 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH December, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/97 719 12/02/97 725 12/03/97 727 12/04/97 725 12/05/97 728 12/06/97 735 12/07/97 737 12/08/97 737 12/09/97 734 12/10/97 725 12/11/97 715 12/12/97 713 12/13/97 714 12/14/97 720 12/15/97 730 12/16/97 736 12/17/97 735 12/18/97 735 12/19/97 735 12/20/97 731 12/21/97 727 12/22/97 724 12/23/97 718 12/24/97 7'I6 12/25/97 715 12/26/97 712 12//27/97 713 12/28/97 725 12/29/97 730 12/30/97 730 12/31/97 733

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD December 1997 Janua TURKEY POINT UNIT 4 5 1998 C. L. Mowre Lu (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 7854.5 149307.5
4. Number of Hours Generator Was On Line 744.0 7810.5 144976.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 539998.0 5442559.0 93491637.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

N~

50-251 DNIT NAME: T I P I 66 DATE:

CDMPLETEDEY: C~L.

T E EDNA: ~6 REPORT MONTH December 1997 Date Type Duration Reasons Method & Corrective Action to (Hours) of Prevent Recurrence Reactor'ause Shutting Down H/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & S - Load Reduction License Examination 9 Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: Janua 5 1998 COMPLETE BY: ~C.

TELEPHONE: 305 246-6204 REPORT MONTH December 1997 Unit 4 operated at approximately 100% power for the entire month of December.