Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr
ML18008A046
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-297, NUDOCS 9812160080
Download: ML18008A046 (14)


Text

REGULA'1 . Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

'll ACCESSION NBR:9812160080 DOC.DATE: 98/11/30 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point'lant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY, C. L. Florida Power 5 Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1998 for Turkey Point, Units 3 & 4.With 981209 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 , JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 C R 0 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 NOAC 1 1 NRC PDR 1 1 0

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 -.

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

PPK DEC 091998 L-98-297 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 1998 Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9812160080 981130

/y PDR ADQCK 05000250 R PDR an FPL Group company

1" AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 DNT: 6 6 M DATE: December 2 1998 COMPLETED: C.

6'ELE EDNE: ~6-6 REPORT MONTH November 1998 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 11/1/98 409 11/2/98 679 11/3/98 712 11/4/98 716 11/5/98 722 11/6/98 729 11/7/98 730 11/8/98 728 11/9/98 725 11/1 0/98 720 11/11/98 722 11/12/98 721 11/1 3/98 722 11/14/98 722 11/1 5/98 720 11/16/98 716 11/1 7/98 717 11/1 8/98 712 11/1 9/98 711 11/20/98 712 11/21/98 711 11/22/98 714 11/23/98 719 11/24/98 718 11/25/98 719 11/26/98 719 11/27/98 718 11/28/98 722 11/29/98 724 11/30/98 723

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE December 2 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD November 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 7048.2 160166.0
4. Number of Hours Generator Was On Line 720.0 7014.7 157973.6
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 509570.0 4870517.0 101283073.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point P3 DATE: December 2 199 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTHNovember 1998 No. Duration Reason* Method of Cause r Corrective Action (Hour ) Shutting Co ents Down Reactor N/A N/A N/A N/A F - Forced Reason Method 1 Manual S - Scheduled A Equipment Failure 2 Manual Scram

() - Maintenance or Test 3 Automatic Scram C - Refueling 4 Continued D - Regulatory restriction 5 - Load Reduction E - Operator Training & 9 - Other (Explain)

License Examination F - Administrative G Operational Error (Explain)

H Other (Explain)

r J

SUMMARY

OF( OPKRATING KXPKRIKNCK DOCKET NO. 50-250 DN DATE: December 2 1998 CDNPLEPED: C.

E DNE:

REPORT MONTH November 1998 Unit 3 started the month at approximately 49% reactor power, ramping up aAer the Cycle 17 refueling outage. Unit 3 achieved 100% power on November 2, 1998, and stayed at about 100%

power for the remainder of the month.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT:

DATE: December 2 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH November 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/98 713 11/2/98 710 11/3/98 711 11/4/98 712 11/5/98 718 11/6/98 725 11/7/98 728 11/8/98 726 11/9/98 724 11/1 0/98 722 11/11/98 720 11/12/98 717 11/1 3/98 717 11/14/98 718 11/1 5/98 715 11/1 6/98 711 11/1 7/98 712 11/1 8/98 708 11/1 9/98 707 11/20/98 706 11/21/98 706 11/22/98 709 11/23/98 713 11/24/98 712 11/25/98 714 11/26/98 714 11/27/98 713 11/28/98 717 11/29/98 719 11/30/98 718

A OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE December 2 1998 COMPLETED BY C. L. Mowre TELEPHONE REPORTING PERIOD November 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 8016.0 157323.5
4. Number of Hours Generator Was On Line 720.0 8016.0 152992.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 514873.0 5646501.0 99138138.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: k k kk DATE: December 2 1998 COMPLETED BY: C.. M TELEPHONE: 305 246-6204 REPORT MONTH November 1998 No. Duration Reason~ Method of e Corrective Action to (Hours)

Reactor'ause Shutting Oown Prevent Recurrence N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipnent Failure 1 - Manual B - Maintenance or Test 2 Manual Scraz C - Refueling 3 - Autoxkatic Scran D - Regulatory restriction 4 - Continued E - Operator Training r 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OI'PERATING EXPERIENCE DOCKET NO. 50-251 UNIT: k DATE: December 2 1998 COMPLETE BY:

TELEPHONE: (~6 C. L, Mowre REPORT MONTH November 1998 Unit 4 operated at essentially 100% for the entire month of November, 1998.