CATEGORY 3.

~,

REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION 'NBR: 9710160164 DOC. DATE: 97/09/30 NOTARIZED: NO DOCKET 5 FACIL: 56-250'Turkey Point Planti Unit 3i Florida Power and Light C 05000250 50-251 Turkey Point Planti Unit 4i Florida Poeer and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREYr C. L. Florida Poeer Zc Light Co.

HOVEYi R. J. Florida Poeer h Light Co.

RECIP. NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1997 for Turkey Point> Unit 3 5 4. W/971009 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

, E NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU R 1 1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB I,

1 F IL CENTER BAr~

1 1 RGN2'XTERNAL:

LITCO BRYCEt J H 1 NOAC NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

II OCT 09 1997 L-97-254 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments yj )

cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 97iOib0ib4 970930 05000250 PDR ADQCK R PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company

p AVERAGE DAILY UNIT POWE R LEVEL DOCKET NO. 50- 250 UNIT Turkey PoInt ¹3 DATE Oct 06, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH Se tember. 1997 DAY AVERAGE- DAILY POWER LEVEL (MWe-Net) 09/01/97 708 09/02/97 702 09/03/97 704 09/04/97 703 09/05/97 706 09/06/97 712 09/07/97 713 09/08/97 713 09/09/97 710 09/10/97 708 09/11/97 707 09/12/97. 706 09/13/97 706 09/14/97 709 09/15/97 716 09/16/97 715 09/17/97 710 09/18/97 706 09/19/97 707 09/20/97 707 09/21/97 707 09/22/97 705 09/23/97 705 09/24/97 707 09/25/97 707 09/26/97 707 09/27/97 710 09/28/97 713 09/29/97 713 09/30/97 710

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE October 6 1997 COMPLETED BY TELEPHONE 305 246%204 REPORTING PERIOD Se tember 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity(MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 5457.3 150908.8
4. Number of Hours Generator Was On LIne 720.0 5362.8 148749.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 510042,0 3671347.0 94831553.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point P3 DATE: October 6 1997 COMPLETED BY ~C. M TELEPHONE: 305 246-6204 llEPOR1'MDNTH~Sb 99 No. Date Type'uration Reason~ Method of 4 Corrective Action Co~ents (Hours)

Reactor'ause Shutting Down N/A F - Forced Reason Method

- - 1 - Manual S Scheduled A

- MaintenanceFailure Equipment 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 83 DATE: October 6 1997 COMPLETED BY L. Mowre TELEPHONE: 305 246-6204 RBPDRT MONTH S b 9 Unit 3 operated at essentially 100% power for the entire month of September.

AVERAGE DAlLY UNIT POWER DOCKET NO. 50 - 251 LEVEL'ONTH UNIT Turkey Point ¹4 DATE Oct 06, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246- 6204 Se tember, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/97 701 09/02/97 697 09/03/97 695 09/04/97 690 09/05/97 691 09/06/97 345 09/07/97 285 09/08/97 0 09/09/97 0 09/10/97 0 09/11/97 0 09/12/97 0 09/13/97 0 09/14/97 0 09/15/97 0 09/16/97 0 09/17/97 0 09/18/97 0 09/19/97 0 09/20/97 0 09/21/97 0 09/22/97 0 09/23/97 0 09/24/97 0 09/25/97 0 09/26/97 0 09/27/97 0 09/28/97 0 09/29/97 0 09/30/97 0

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE October 6 1997 COMPLETED BY C. L. Mowre TELEPHONE REPORTING PERIOD Se tember 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 168.0 5925.0 147378.0
4. Number of Hours Generator Was On Line 168.0 5911.8 143077.8
5. Unit Resewe Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 97215.0 4127679.0 92176757.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: T~kk k kk DATE: October 6 1997 COMPLETED BY ~CL. kl TELEPHONE: 305 246-6204 RBPDkk MDkkkkk~Sb 9 Date Type'uratio Reason'ethod of 6 Corrective Action to Prevent Recurrence n

(Hours)

Reactor'ause Shutting Down 1053 9/6/97 0.0 Test )4ain Steam safety valves 1054 9/8/97 552.0 Refueling outage F - Forced Reason Method S - Scheduled A Equipment Failure 1 - Manual 8 - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training 4 5 - Load Reduction License Examination 9 Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~

'UMMARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: October 6 1997 COMPLETE BY: C. L. Mowre TELEPHONE: 305 246-6204 RBP QR1'ONTH ~sb Unit 4 operated at essentially 100% power until September 6, 1997. Power was lowered to 50%

to begin testing on Main Steam Safety valves. On September 8, 1997, Unit 4 was shut down to begin the Cycle 17 refueling outage, and remained shut down for the remainder of the month.