Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr
ML17355A191
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-004, L-99-4, NUDOCS 9901210036
Download: ML17355A191 (15)


Text

CATEGORY 1

~

C.

REGULAJ.ORY INFORMATION DISTRIBUTIO SYSTEM (RIDS) 4 ACCESSION NBR:9901210036 DOC.DATE: 98/12/31 NOTARIZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point<<Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. , Florida Power &. Light Co.

HOVEY,R.J. Florida Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATION SUBJECT': Monthly operating repts for Dec 1998 for Turkey Point, Units 3 6 4.With 990112 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 JABBOUR,K 1 INTERNAL: AEOD/SPD/RRAB 1 1 LE CENTER 0 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDSn RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

JANET t999 L-99-004 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 1998 Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant c~ Q

!rr'rr0i2i0036 98123 PDR ADOCK 05000250 i

R PDR ~

an FPL Group company

a 'l N

AVERAGE DATLYVNITPOWER LEVEL DOCKET NO. 50-250 CM: k k M DATE: L CCMPLNYEC BY ~C.. M C ONe:

REPORT MONTH December 1998 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 12/1/S8 722 12/2/98 723 12/3/98 722 12/4/98 721 12/5/98 720 12/6/98 722 12/7/98 723 12/8/98 723 12/9/98 720 12/1 0/S8 720 12/1 1/98 722 12/12/98 722 12/1 3/98 722 12/1 4/98 721 12/1 5/98 731 12/1 6/98 734 12/1 7/98 728 12/1 8/98 736 12/1 9/98 732 12/20/98 726 12/21/S8 720 12/22/98 718 12/23/98 718 12/24/98 ?19 12/25/98 717 12/26/98 717 12/27/98 722 12/28/98 722 12/29/98 715 12/30/98 722 12/31/98 730

~ ~

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE COMPLETED BY ~C. L. Mowle TELEPHONE REPORTING PERIOD December 1998 (MonthlYear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 7792.2 160910.0
4. Number of Hours Generator Was On Line 744.0 7758.7 158717.6
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 537786.0 5408303.0 101820859.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAAM:

DATE:

~ki 50-250 I

N P

COMPLETED BY: C.L. M TELEPNDMI:

REPORT MONTH December 1998 No. Date Type Duration Reason~ Method of Corrective Action Reactor'ause c

(Hours) shutting Ccements Down N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method 1 - Manual S - Scheduled A Equipment Failure 2 - Manual Scram B - Maintenance o Test 3 - Automatic Scram C Refueling 4 - Continued D Regulatory restriction 5 Load Reduction E - Operator Training 6 9 - Other (Explain)

License Examination F Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OFi OPERATING KXPKRIKNCK DOCKET NO. 50-250 DNPP: l H DATE:

CDLDLHPHDBP: C.

PHLHPHDNB:

REPORT MONTH December 1998 Unit 3 operated at essentially 100% for the entire month of December, 1998.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT: I I N DATE:

CONPLHTH Y: C. L.

TH HPNONH REPORT MONTH December 1998

'DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/98 716 12/2/98 717 12/3/98 717 12/4/98 716 12/5/98 716 12/6/98 718 12/7/98 718 12/8/98 718 12/9/98 716 12/1 0/98 715 12/11/98 718 12/12/98 718 12/1 3/98 718 12/1 4/98 717 12/1 5/98 726 12/1 6/98 729 12/1 7/98 732 12/1 8/98 733 12/1 9/98 729 12/20/98 722 12/21/98 717 12/22/98 715 12/23/98 716 12/24/98 715 12/25/98 713 12/26/98 713 12/27/98 719 12/28/98 718 12/29/98 713 12/30/98 717 12/31/98 726

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD December 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 8760.0 158067.5
4. Number of Hours Generator Was On Line 744.0 8760.0 153736.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 534960.0 6181461.0 99673098.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 IINIYNAMI: I P I 6

~6 I'ATE:

CDMPLEYED BY: C. L. M I'ELEPHDNB REPORT MONTH December 1998 No. Date Type'uration Reasons Method of r Corrective Action to (Hours)

Reactor'ause Shutting Down Prevent Recurrence N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

M - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: Janua 6 1999 COMPLETE BY: C. L. Mowre TELEPHONE:

II REPORT MONTH December 1998 Unit 4 operated at essentially 100% for the entire month of December, 1998.

/

Pf

~

~ ~ Pv