Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr
ML17354A882
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-095, L-98-95, NUDOCS 9804150174
Download: ML17354A882 (13)


Text

CATEGORY j.

REGULA '

INFORMATION DISTRIBUTZ SYSTEM (RIDS)

ACCESSION NBR:9804150174 DOC.DATE: 98/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-p!51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power 8 Light Co.

HOVEY,R.J. Florida Power &, Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Mar 1998 for Turkey Point, Units 3 8 4.W/980409 ltr. II DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ZD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CENTER 0 1 1 OC/DBA/PAD 1 1 RG 2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

1 APR 09 1998 L-98-095 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 1998 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9804i50i74 98033f 05000250,'

PDR ADOCK PDR

'n FPL Group company

E AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: ~Tk I ¹ DATE: ¹ CON¹CE: C.

ONE:

REPORT MONTH March 1998 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3/1/98 717 3/2/98 722 3/3/98 729 3/4/98 730 3/5/98 728 3/6/98 727 3/7/98 724 3/8/98 723 3/9/98 721 3/1 0/98 728 3/1 1/98 732 3/12/98 735 3/1 3/98 735 3/14/98 732 3/1 5/98 725 3/16/98 725 3/1 7/98 728 3/1 8/98 725 3/1 9/98 724 3/20/98 723 3/21/98 721 3/22/98 728 3/23/98 729 3/24/98 727 3/25/98 727 3/26/98 727 3/27/98 726 3/28/98 721 3/29/98 718 3/30/98 715 3/31/98 719

r DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE ~Aril 1 1999 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD March 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 2079.5 155197.3
4. Number of Hours Generator Was On Line 744.0 2070.8 153029.7
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 539748.0 1491690.0 97904246.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: k* k S DATE: A ril 1 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH March 1998 No. Date Duration Reasonr Method of Corrective Action Reactor'ause (Hours) Shutting Cocments Down N/A N/A N/A N/A N/A N/A N/A r rotce4 herren

- tqviraest reilvre Ke tho4 5 tcheovle4 a KNoll 5 - KeistesNce or TNt 2 Kennel tcf ae C hefvelist 3 SvtrnetiC tCCSa 0 setvletotp teetclction ~ Ccn t isve4 Ccetetot Tteillkis9 5 loe4 rkevvcclcn licenre txaeisrtion 9 OChet (CxPlela) r - skseisietretive O Ccetetiosel tctot rtxpleta) t ocher rcxpleial

SUMMARY

OF< OPKRATING KXPKRIKNCK DOCKET NO.

DNI I".

DATE:

~B DII 50-250 HH CDNTLETHDBT: ~C.

THLE NDNE:

REPORT MONTH March 1998 Unit 3 operated at essentially 100% power for the entire month.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251

¹¹ C~

UNIT: I DATE:

COMP HTHUBP:

HUH HUNB:

REPORT MONTH March 1998 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3/1/98 715 3/2/98 721 3/3/98 728 3/4/98 729 3/5/98 728 3/6/98 726 3/7/98 724 3/8/98 722 3/9/98 721 3/1 0/98 727 3/1 1/98 731 3/1 2/98 733 3/1 3/98 733 3/14/98 731 3/1 5/98 726 3/16/98 726 3/1 7/98 728 3/1 8/98 726 3/19/98 725 3/20/98 723 3/21/98 722 3/22/98 728 3/23/98 728 3/24/98 726 3/25/98 727 3/26/98 726 3/27/98 725 3/28/98 721 3/29/98 717 3/30/98 714 3/31/98 717

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME DATE COMPLETED BY ALII TURKEY POINT UNIT 4 1 1998 C. L. Mowre TELEPHONE REPORTING PERIOD March 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720 r
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 2160.0 151467.5
4. Number of Hours Generator Was On Line 744.0 2160.0 147136.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 539374.0 1554693.0 95046330.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: ~kk k kk DATE: A nl 1 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH March 1998 Mo. Type'uration Reason~ Method r Corrective Action to (Hours) of Prevent Recurrence Reactor'ause Shutting Down M/A M/A H/A M/A F - Eorced Reason Method S - Scheduled A - Equipment railure l - Manual B - Maintenance or Test 2 Manual Scram C Refueling 3 - Automatic Scram D Regulatory restriction 4 - Continued E Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain) r - Administrative G - Operational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE:

COMPLETE BY: C.

TELEPHONE: 305 246-6204 REPORT MONTH March 1998 Unit 4 operated at essentially 100% power for the entire month.