Special Rept:Nonfunctional Fire Barrier Penetrations Not Returned to Svc within 7 Days During Mod Implementation. Caused by Expiration of Schedular Exemptions for Alternate Shutdown Requirements.Compensatory Measurements Continuing
ML17347A243
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/07/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
L-87-10, NUDOCS 8701130250
Download: ML17347A243 (8)


Text

REGULATORY I RNATION DISTRIBUTION SYB l (R IDB)

ACCESSION NBR: 8701130250 DOC. DATE: 87/01/07 NOTARXZED:

NO DOCKET I FACIL:50-250 Tuv keg Point Plant.

Unit 3I Flov ida Potoer and Light C

05000250 50-251 Tuv keg Point Plant.

Unit 42 Flov ida Pokier and Light C

05000251 AUTH. NAl'1E AUTHOR AFFILIATION WOODY'. O.

Florida Powev Sr Light Co.

RECIP. NANE RECIPIENT AFFXLIATION Recov'd Services Branch (Document Contv ol Desk)

SUBJECT:

Forwards special v ept v e breached five barriev's pev Tech Spec

6. 9. 3.

DIBTRIBUTION CODE:

  • DODD COPIEB RECEIVED; LTR

~

ENCL j BIIE:

TXTLE: OR/Licensing Submittal: Fire Protection NOTES:

RECIPIENT ID CODE/NANE PWR-A PD2 LA I 1cDONALDi D INTERNAL: ADN/LFl)B XE WHITNEY>L NRR WERl1EIL. SOh COPIES LTD ENCL 1

0 1

1 0

1 0

RECIPIENT ID CODE/NANE PWR-A PD2 PD 01 PWR-A PSB ELD/HDS4 Q>S 07 FXL 04 COP IES LTTR ENCL 5

5 1

0 2

2 1

EXTERNAL: LPDR NSXC 03 05 NRC PDR 02 TOTAL NUBBER OF COP IEB REQUIRED:

LTTR 18 ENCL 14

h.

h S

I vh

P. O. BOX 00, JUNO BEACH, FL 33408-0420

..JANUARY 07 198I L-87-I0 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours, O. Woody roup Vice President Nuclear Energy COW/PLP/gp Attachment cc:

Regional Administrator, Region ll, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Harold F. Reis, Esquire 8701130250 870107 PDR ADOCK 05000250 O'S PDR PLP I /020/ I PEOPLE... SERVING PEOPLE

~aaa

'I u

~

I'

(

4 I

8 I

I s Pl J i>i l

A II R

~ 4

'll~

~ lt

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers

~Pur ose:

Technical Specification 3.I4.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days.

In accordance with the above requirement, this special report on the breached barriers is being generated in order to notify the NRC. This special report will be updated on a 30 day basis until the Appendix R associated work is complete.

Event:

The plant has been and is continuing to implement numerous modifications, mainly in accordance with Appendix R Alternate Shutdown requirements.

The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measure to be taken when a barrier is breached, expired on September 30,

l986, and on October I,

l986.

Upon the expiration of the exemptions, the compsensatory measures as described in Attachment of our letter L-85-386 (dated October I I, l985), are continuing to be in place until the Safe Shutdown modifications are complete.

Breaches incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions as applicable.

Cause and Corrective Actions:

The major cause of the breached barriers is the Appendix R Alternative Shutdown work which still remains to be completed.

Due to the large volume of work being performed, the plant is reporting the breaches in this one report, rather than on a case-by-case basis.

The breaches are grouped in two categories (see attached list of breached barriers):

2) those breaches which are now closed, but were open for longer than 7 days, and those breaches which were open at the end of December, and were open for longer than 7 days.

The plant continues to implement the compensatory measures as applicable.

PLP I /020/2

4

~(gt I

I 4

I 4 4

'4 H

~ il 4 ~

A I

~

~ II 4

II jI 4

\\

~

~ 1 II e

I A

~

~

4

'I 4

I I

f4 1'll vl'l l" lt 4 Il I44 lt 4

tl 1

4 4

I 1

I I,

1

)

II It

~

4 1

4 il 4

4 I

4 I, I

II '

1 l,,i I I II I

4 J

~

I i

I L

II'I 4

I 4 I

II 1 I ~

~

~

ATTACHMENT CLOSED BREACHES OPEN FOR'LONGER THAN7 DAYS Number 86-0003 86-0037 86-0225 86-0226 Descri tion Structural Steel Fire Proofing New Beam Structural Steel Fire Proofing New Beam Fire Barriers No. 180A-E Structural Steel Fire Proofing Member WI6 x 40 Open

'ate 10/01/86 10/01/86 12/01/86 12/01/86 Closing Date 12/17/86 12/17/86 12/12/86 12/10/86 86-1006 Fire Door No. 1088-1 I I /03/86 I I /28/86 BREACHES OPEN ATTHE END OF DECEMBER ANDFOR MORE THAN7 DAYS Number Descri tion

~Den Date 86-0224 86-0280 86-0304 86-0305 86-306 86-307 86-308 86-309 86-310 86-311 86-312 86-313 86-314 86-315 86-316 86-317 86-1023 Penetration Seals No. 108AN-E006 Raceway Protection No. B-3J1712-4 Conduit Seals No. 96W-E013 Conduit Seals No. 70E-E008 Conduit Seals No. 7 IE-E007 Conduit Seals No. 96E-E003 Conduit Seals No. 67E-E017 Conduit Seals No. 40E-EO I 0 Conduit Seals No. 58E-E005 Conduit Seals No. 98E-E041 Conduit Seals No. 98E-E040 Conduit Seals No. 98W-E015 Conduit Seals No. 108AE-E003 Conduit Seals No. 63W-E005 Conduit Seals No. 106E-E015

'onduit Seals No. 108BE-E002 Fire Door No. 58-2 12/01/86 12/18/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/29/86 12/02/86 PLP I /020/3

~

\\