Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr
ML17355A447
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1999
From: Hovey R, Lafleur D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-221, NUDOCS 9910190173
Download: ML17355A447 (80)


Text

yj~tu Distri-5.txt 99lo/'1 Ol W~

Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

K Jabbour 1, Paper Copy Internal Recipients:

Rids Rgn2MailCenter 0 OK RidsResDraaOerab 0 OK RidsOcfoDpbaPab 0 OK Rids Manager 0 OK RidsAcrsAcnwMailCenter 0 OK RGN2. Paper Copy RES/DRAA/OERAB Paper Copy OCFO/DPBA Paper Copy

.iLE CEHTTER 0 Paper Copy ACR Paper Copy External Recipients:

NOAC Internet: dsq@ornl.gov INEEL Marshall

~r Paper Copy Paper Copy v.

Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03691931:1

Subject:

February, 2000, Operating Data Report and Summary of Operating Experience for Turke y Point Units 3 and 4.

Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003691931 ~

Page 1

'a if 1

kl r

E I

Distri-5.txt IE24 - Monthiy Operating Report (per Tech Specs)

Docket: 05000250 Docket: 05000251 Page 2

R 07,moo L-2000-062 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort - Februa 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company oo@LoQAB i

W r

AVERAGE DAILYUNIT PO%'ER LEVEL DOCKET NO. 50-250 UNIT: 6 DATE: March 2 2000 COMPLETED BY: O.I. Hanek TEE HONE. H0066-660 ltE OliT MON H 00 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 2/1/2000 717 2/2/2000 717 2/3/2000 719 2/4/2000 719 2/5/2000 723 2/6/2000 730 2/7/2000 726 2/8/2000 724 2/9/2000 728 2/1 0/2000 729 2/1 1/2000 727 2/1 2/2000 721 2/1 3/2000 715 2/1 4/2000 712 2/1 5/2000 709 2/1 6/2000 708 2/17/2000 711 2/18/2000 711 2/19/2000 709 2/20/2000 706 2/21/2000 706 2/22/2000 718 2/23/2000 723 2/24/2000 723 2/25/2000 715 2/26/2000 314 2/27/2000 281 2/28/2000 0 2/29/2000 0

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE March 2 2000 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 648.3 1392.3 171009.7
4. Number of Hours Generator Was On Line 648.3 1392.3 168794.4
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 444470 981826 108915034

UNIT SHUTDOWNS DOCKET NO. 50-250 ONIP NAME: I I M DATE: March 2 2000 COMPLETED BY: O. I. Hanek PHLEPHOMI: ~6-000 RHPORP MONER I' 000 No. Date Duration Reason Method of Corrective Action Reactor'ause

{Hours) Shutting Cocntents Down 2000005 2/28/2000 41.7 Shut down for refueling.

F - Forced Reason Method S - Scheduled A - Equipment Failure

- Maintenance or Test l - Manual 2 - Manual Scram B

C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continuation E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF>> OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELE <<ONE. '~6-660

~¹ 50-250 March 2 2000 O. I. Hanek EEPOET MONTE ~b2000 Unit 3 operated essentially at 100% reactor power until February 25, 2000. Then reactor power was lowered in preparation for a refueling outage which started on February 28, 2000. The unit remained shutdown for refueling for the remainder of the month, and is expected to restart on or about March 26, 2000.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT'. ~kP I PP DATE: March 2 2000 COMPLETED BY:

E E <<ONE: ~6-<<

O. I. Hanek TEPEE MONTE I DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2/1/2000 719 2/2/2000 719 2/3/2000 720 2/4/2000 721 2/5/2000 725 2/6/2000 731 2/7/2000 728 2/8/2000 726 2/9/2000 729 2/1 0/2000 731 2/11/2000 730 2/12/2000 724 2/13/2000 719 2/14/2000 717 2/15/2000 714 2/1 6/2000 710 2/17/2000 712 2/18/2000 714 2/19/2000 712 2/20/2000 713 2/21/2000 713 2/22/2000 722 2/23/2000 728 2/24/2000 729 2/25/2000 726 2/26/2000 724 2/27/2000 724 2/28/2000 722 2/29/2000 717

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE March 2 2000 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 696 1387.6 167661.8
4. Number of Hours Generator Was On Line 696 1369.3 163291.6
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 502055 980345 10638871 5

UNIT SHUTDOWNS DOCKET NO. 50-251 DNIINBMB: ~k* I 66 DATE: March 2 2000 COMPLETED BY: O. I. Hanek TBLBPHDNB: MPPP-66 RBPDRTMDNTH ~bOOO No. Duration Reason* Method of & Corrective Action (Hours)

Reactor'ause Shutting Down Cosrents N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point ¹4 DATE: March 2 2000 COMPLETE BY: O. I. Hanek TELEPHONE: 305 246-6607 REPORTMQNTH~00 Unit 4 operated at essentially 100% reactor power for the month of February, 2000.

t t v

Distri25.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

K Jabbour 1 Not Found Internal Recipients:

Rids Res DraaOerab OK RGN 2. Not Found RES/DRAA/OERAB Not Found OCFO/DPBA== Not Found 6 FILE-CENTER 01 Not Found ACRS Not Found External Recipients:

NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003683954

Subject:

Turkey Point 3 and 4 Monthly Operation Report- January, 2000. With February 9, 2000 I etter.

Body:

Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

f PEB P9 2000 L-2000-034 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort- Janua 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company f30 Q (Qg ~a]

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT:

DATE: Februa 4 2000 COMPLETED BY: O.I. Hanek TELEPHONE: LOD6-66 ll¹PDET MDNTH ~000 DAY. AVERAGE DAILYPOWER LEVEL (MWe-Net) 1/1/2000 720 1/2/2000 717'17 1/3/2000 1/4/2000 716 1/5/2000 710 1/6/2000 715 1/7/2000 717 1/8/2000 716 1/9/2000 714 1/1 0/2000 714 1/1 1/2000 713 1/12/2000 711 1/1 3/2000 711 1/14/2000 716 1/1 5/2000 730 1/16/2000 735 1/1 7/2000 730 1/1 8/2000 729 1/1 9/2000 726 1/20/2000 726 1/21/2000 728 1/22/2000 730 1/23/2000 726 1/24/2000 720 1/25/2000 728 1/26/2000 733 1/27/2000 736 1/28/2000 735 1/29/2000 729 1/30/2000 725 1/31/2000 719

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Februa 4 2000 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electricai Rating (MWe-Net) 720
2. Maximum Dependable Capacity(MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744 744 170361.4
4. Number of Hours Generator Was On Line 744 744 168146.1
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 537356 537356 108470564

UNIT SHUTDOWNS DOCKET NO. 50-250 ENII NAME: I I M APE: I I 4 EM COMPLETED BY: O. I. Hanek PELHPHHNH: ~66-660 REPQRPMDNI'H I~000 No. Date Type'uration Reason'ethod of a Corrective Action (Hours)

Reactor'ause Shutting Down Cocaents N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test. 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPKRATING KXPKRIKNCK DOCKET NO.

UNIT:

DATE:

~kN 50-250 M

COMPLETED BY:

HIHPHONH: ~6M O. I. Hanek HH OHT MONTH ~0 Unit 3 operated essentially at 100% for the month of January, 2000.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT:

DATE:

~k¹ 50-251 bbb 000 COMPLETED BY:

TEL <<ONE: ~0-<<

O. I. Hanek OETMOIITN DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 1/1/2000 723 1/2/2000 721 1/3/2000 720 1/4/2000 716 1/5/2000 716 1/6/2000 718 1/7/2000 718 1/8/2000 717 1/9/2000 716 1/10/2000 715 1/11/2000 714 1/1/2000 712 1/13/2000 714 1/14/2000 718 1/1 5/2000 730 1/1 6/2000 734 1/1 7/2000 729 1/1 8/2000 730 1/1 9/2000 726 1/20/2000 726 1/21/2000 728 1/22/2000 730 1/23/2000 726 1/24/2000 337 1/25/2000 0 1/26/2000 0 1/27/2000 142 1/28/2000 720 1/29/2000 725 1/30/2000 727 1/31/2000 723

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Februa 4 2000 COMPLETED BY O.I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 691.6 691.6 166965.8
4. Number of Hours Generator Was On Line 673.3 673.3 162595.6
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 478290 478290 105886660

UNIT SHUTDOWNS DOCKET NO. 50-251 UNIT NAME: 0 I ~

DATE: 0~000 COMPLETED BY: O. I. Hanek TEAEPHDNH: H006-660 EEPUET MUNTH ~00 Ho. Date Duration Reason Method of Cause & Corrective Action (Hours) Shutting Comments Down Reactor 20000001 1/24/2000 10.'7 The cause of the feedwater control valve failure, that required a manual reactor trip, was a failure in the valve internals. Disassembly of the valve confirmed that the valve cage had disengaged from the valve body web.

Corrective actions included repair of the valve and Post Maintenance Testing.

A Licensee Event Report (No. 2000-001-00) is being prepared for submittal to the NRC.

F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Other (Explain)

License Exa~ination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~

~

~

'UMMARY

~ OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point P4 DATE: 000 00 COMPLETE BY: O. I. Hanek TELEPHONE: 305 246-6607 RRPOR MONTH 00 Unit 4 operated at essentially 100% for the month of January, 2000, except between January 24-27, 2000. The reactor was manually tripped on January 24, 2000, aAer experiencing problems with the feedwater control valve to the 4A steam generator. Unit 4 returned to 100% power on January 27, 2000. A Licensee Event Report (No. 2000-001-00) is being prepared for submittal to the NRC.

SAN 0 6 2000 L-2000-004 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-December 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments f

cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant pQp ~~a C)g~~~

an FPL Group company + ~3<griggg

)

Distri61.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients: Copies:

K Jabbour 1 Not Found Internal Recipients:

RGN 2 Not Found RES/DRAA/OERAB Not Found L

eRS =~

OCFO J32BA CENTER Not Not Not Found Found Found External Recipients:

NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003674568

Subject:

Monthly operating reports for December 1999 for Turkey Point, Units 3 and 4. With 000106 letter.

Body:

PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNI: >> I ¹ I

DATE:

COMPLETED BY:

I¹I <<ONE:

REPORT MONTH December 1999

~6 O.I. Hanek DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/99 730 12/2/99 733 12/3/99 732 12/4/99 731 12/5/99 728 12/6/99 724 12/7/99 720 12/8/99 708 12/9/99 719 12/10/99 721 12/11/99 720 12/12/99 718 12/13/99 719 12/14/99 718 12/1 5/99 713 12/16/99 715 12/17/99 720 12/18/99 716 12/19/99 714 12/20/99 711 12/21/99 712 12/22/99 714 12/23/99 710 12/24/99 713 12/25/99 726 12/26/99 733 12/27/99 732 12/28/99 730 12/29/99 730 12/30/99 728 12/31/99 725

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Janua 3 2000 COMPLETED BY O. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD December 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744 870?.4 169617.4
4. Number of Hours Generator Was On Line 744 8684.5 167402.1
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 536729 6112349 107933208

UNIT SHUTDOWNS DOCKET NO. 50-250 UNIT NANH: T~HP I 66 DATE: I >>66 COMPLETED BY: O. I. Hanek TH HPHUNN: ~06-66 REPORT MONTH December 1999 No. Date Duration Reason* Method of Cause 4 Corrective Action (Hours) Shutting Comments Down Reactor*

N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

¹¹¹¹.:

DATE:

COMPLETED BY:

¹¹¹¹ ¹ON¹:

J>>

50-250

" " i O. I. Hanek

~¹¹-66

~

¹ REPORT MONTH December 1999 Unit 3 operated essentially at 100% for the month of December, 1999.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 IINI DATE:

BY: O. I. Hanek

~I""'OMPLETED PPLPPNONN ~06-66 REPORT MONTH December 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/99 730 12/2/99 733 12/3/99 733 12/4/99 732 12/5/99 730 12/6/99 726 12/7/99 718 12/8/99 718 12/9/99 719 12/10/99 721 12/11/99 720 12/12/99 719 12/1 3/99 719 12/14/99 718 12/15/99 714 12/16/99 715 12/17/99 721 12/18/99 718 12/19/99 716 12/20/99 715 12/21/99 715 12/22/99 717 12/23/99 711 12/24/99 714 12/25/99 727 12/26/99 734 12/27/99 734 12/28/99 732 12/29/99 730 12/30/99 729 12/31/99 727

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Janua 3 2000 COMPLETED BY O. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD December 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744 8206.7 166274.2
4. Number of Hours Generator Was On Line 744 8185.8 161922.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 537706 5735272 105408370

UNIT SHUTDOWNS DOCKET NO. 50-251 HNN NAME: 6 6 6 DATE:

COMPLETED BY: O. I. Hanek PE EPHHNE'666 6-666 REPORT MONTH December 1999 No. Date Type'uration Reason Method of & Corrective Action (Hours)

Reactor'ause Shutting Down Comments N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual

- or Test 2 - Manual Scram B

C - Maintenance Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: Janua 3 2000 COMPLETE BY: O. I. Hanek TELEPHONE: ~6-66 REPORT MONTH December 1999 Unit 4 operated at essentially 100% for the month of December, 1999.

P S

)AN >~ Kg V ~

999 tI=PIL. L-99-267 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-November 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

f t

$ Nf i

v J

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: Turke Point ¹3 DATE: December 3 1999 COMPLETED BY: O.I. Hanek TELEPHONE: ~5-MO REPORT MONTH November 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/99 710 11/2/99 709 11/3/99 716 11/4/99 724 11/5/99 726 11/6/99 724 11/7/99 718 11/8/99 722 11/9/99 722 11/1 0/99 722 11/11/99 720 11/12/99 720 11/1 3/99 721 11/14/99 720 11/1 5/99 692 11/1 6/99 317 11/17/99 0 11/18/99 348 11/19/99 720 11/20/99 723 11/21/99 722 11/22/99 720 11/23/99 717 11/24/99 717 11/25/99 716 11/26/99 714 11/27/99 716 11/28/99 722 11/29/99 725 11/30/99 726

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE December 3 1999 COMPLETED BY O. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD November 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 693.8 7963.4 168873.4
4. Number of Hours Generator Was On Line 677.2 7940.5 166658.1
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 481025 5575620 107396479

UNIT SHUTDOWNS DOCKET NO. 50-250 LPNNN¹NE: 3 3 ¹3 DATE: December 3 1999 COMPLETED BY: O. I. Hanek PELEPNDNE: 333 6-666 REPORT MONTH November 1999 No. Date Type'uration Reason'ethod of Corrective Action Reactor'ause (Hours) Shutting Cosments Down 19900032 11/16/99 42.8 Turbine control valve inoperable, testing and repairs F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & S Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

~k¹3 50-250 December 3 1999 COMPLETED BY: O. I. Hanek TELE¹NUNE. ~6-66 REPORTMONTH November 1999 Unit 3 operated essentially at 100% in the beginning of the month of November, 1999. On November 15, 1999, power reduction was commenced to test the No. 2 turbine control valve. On November 16, 1999, the unit was taken offline to repair the No. 2 turbine control valve. On November 18, 1999, Unit 3 resumed 100% power operation and remained at that power level for the rest of the month.

l AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT.

DATE:

~ki ¹ 50-251 December 3 1999 COMPLETED BY:

TELEPHONE. '666 O. I. Hanek 6-66 REPORT MONTH November 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/99 710 11/2/99 710 11/3/99 717 11/4/99 725 11/5/99 727 11/6/99 726 11/7/99 723 11/8/99 687 11/9/99 290 11/1 0/99 516 11/11/99 715 11/12/99 720 11/1 3/99 724 11/14/99 723 11/1 5/99 722 11/1 6/99 714 11/1 7/99 724 11/1 8/99 728 11/1 9/99 726 11/20/99 725 11/21/99 722 11/22/99 719 11/23/99 718 11/24/99 719 11/25/99 716 11/26/99 714 11/27/99 716 11/28/99 722 11/29/99 725 11/30/99 725

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE December 3 1999 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD November 1999 (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720 7462.7 165530.2
4. Number of Hours Generator Was On Line 720 7441.8 161178.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 502823 5197566 104870664

UNIT SHUTDOWNS DOCKET NO. 50-251 HNIINENI!.

  • I 66 DATE: December 3 1999 COMPLETED BY: O. I. Hanek TELEPHONE: H666-66 REPORT MONTH November 1999 No. Date Duration Reason* Method of Corrective Action Reactor'ause 6

(Hours) Shutting Comments Down N/A N/A F Forced Reason Method

- Scheduled A - Equipment Failure 1 - Manual S

B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) "

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:

DATE: December 3 1999 COMPLETE BY: O. I. Hanek TELEPHONE: ~6-66 REPORT MONTH November 1999 Unit 4 operated at essentially 100% until November 8, 1999, when reactor power was reduced to approximately 40% for turbine valve testing. The unit returned to 100% power on November 10, 1999, and operated at that power level for the rest of the month of November, 1999.

fp ] 8 girg 0 '

P

~

II

. Distri50.txt Distribution Sheet Priority: Normal From: Linda Eusebio Action Recipients: Copies:

K Jabbour 1 Not Found Internal Recipients:

RGN 2 Not Found RES/DRAA/OERAB Not Found OC Not Found g PEN ER 01 Not Found ACRS Not Found External Recipients:

NRC PDR 1 Not Found NOAC 1 Not Found INEEL Marshall 1 Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993480234

Subject:

Monthly operating reports for November 1999 for Turkey Point, Units 3 and 4.With 991208 letter.

Body:

PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

~ ~

~ g

Distri13.txt Distribution Sheet Priority: Normal

~i/e)(<

From: Stefanie Fountain Action Recipients: Copies:

KJabbour 1 Not Found Internal Recipients:

RGN 2. Not Found RES/DRAA/OERAB Not Found OC/DBA/PAD 1 Not Found F C TEB 1 Not Found ACRS Not Found External Recipients:

NRC PDR Not Found NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993220052

Subject:

Monthly Operating Reports for October 1999 for Turkey Point, Units 3 and 4, With Nove mber 8, 1999 Letter.

Body:

PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

NOV 08 'f999 L-99-242 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-October 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4. r Very truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: I6 DATE: November 2 1999 COMPLETED BY D. R. Lafleur TELEPHONE: 305 246-7150 REPORT MONTH October 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 10/1/99 698 10/2/99 703 10/3/99 707 10/4/99 708 10/5/99 706 10/6/99 702 10/7/99 703 10/8/99 706 10/9/99 707 10/10/99 709 10/11/99 707 10/12/99 698 10/13/99 691 10/14/99 710 10/1 5/99 717 10/16/99 716 10/17/99 711 10/1 8/99 708 10/1 9/99 700 10/20/99 703 10/21/99 702 10/22/99 706 10/23/99 713 10/24/99 719 10/25/99 723 10/26/99 723 10/27/99 723 10/28/99 723 10/29/99 721 10/30/99 719 10/31/99 715

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE November 2 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 REPORTING PERIOD October 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 745.0 7269.6 168179.6
4. Number of Hours Generator Was On Line 745.0 7263.3 165980.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 528619 5094595 106915454

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: N DATE: November 2 1999 COMPLETED BY D.R. Lafleur TELEPHONE: 305 246-7150 REPORT MONTH October 1999 Unit 3 operated essentially at 100% in the beginning of the month of October, 1999. On October 12, 1999, power was reduced to 90% for repair of the Heater Drain Tank Level Control Valve, CV-3-1510A. Unit 3 resumed 100% power on October 13, and stayed essentially at 100% power for the rest of the month of October, 1999.

UNIT SHUTDOWNS DOCKET NO.

NNHHNANH:

DATE:

~i03 50-250 November 2 1999 COMPLETED BY: D. R. Lafleur HHLHHHDNH: 43303 240- 0 REPORT MONTH October 1999 Duration Method of Corrective Action No. Date (Hours)

Reason Reactor'ause Shutting Down Ccecnents N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT:

DATE: November 2 1999 COMPLETED BY: D. R. Lafleur TELEPHONE: 305 246-7150 REPORT MONTH October 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 10/1/99 698 10/2/99 701 10/3/99 706 10/4/99 708 10/5/99 705 10/6/99 703 10/7/99 707 10/8/99 706 10/9/99 708 10/10/99 710 10/11/99 709 10/12/99 706 10/13/99 708 10/14/99 711 10/1 5/99 715 10/16/99 718 10/1 7/99 716 10/18/99 711 10/19/99 705 10/20/99 702 10/21/99 696 10/22/99 698 10/23/99 712 10/24/99 719 10/25/99 721 10/26/99 722 10/27/99 724 10/28/99 723 10/29/99 720 10/30/99 719 10/31/99 716

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE November 2 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 REPORTING PERIOD October 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 745.0 6742.7 164810.2
4. Number of Hours Generator Was On Line 745.0 6721.8 160458.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 529238 4694743 104367841

UNIT SHUTDOWNS DOCKET NO. 50-251 0 0 TNT NAME:

DATE:

2~TEE November 2 i

4 4044 1999 COMPLETED BY: D. R. Lafleur TELEPHONE: 42200 240->> 0 REPORT MONTH October 1999 No. Date Duration Reason'ethod of Corrective Action Reactor'ause (Hours) Shutting Corments Down N/A N/A N/A N/A N/A N/A H/A F - Forced Reason Method S - Scheduled A - Equipment Failure

- Maintenance or Test l Manual 2 - Manual Scram B

C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination "

F - Mministrative G - Operational Error (Explain)

H - Other (Explain)

h

~

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:

DATE: November 2 1999 COMPLETE BY: D. R. Lafieur TELEPHONE: ~06-7 5 REPORT MONTH October 1999 Unit 4 operated at essentially 100% for the entire month of October, 1999.

.~ ~ ~

Itl res

~ r'

CATZaOaz 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9910190173 DOC.DATE: 99/09/30 NOTARXZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-253, Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION LAFLEUR,D.R. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1999 for Turkey Point, Units 3 & 4.With 991008 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR ENCL SXZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 JABBOUR,.K 1 1 RES/DRAA/OERAB INTERNAL: FILE CENTER 01 1 OC/DBA/PAD 1 1 1 RGN2 1 1 EXTERNAL: LMXTCO MARSHALL 1 NOAC 1 1 NRC PDR' 1 1 D

N i.>su>tjfJ<Jil~4 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 8 ENCL 8

OCTO8 1999 L-99-221 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 t Docket Nos. 50-250 and 50-251 k Monthl 0 eratin Re ort-Se tember 1999 1k In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

l'ery truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

'I 99iQi90i73 990930 l PDR'ADOCK 05000250, I I R PDR an FPL Group company

II if

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UM DATE:

. ~ki 50-250 October 5 1999 N

COMPLETED BY: D. R. Lafleur TELWHDMI: ~56-REPORT MONTH Se tember 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/99 687 9/2/99 686 9/3/99 687 9/4/99 686 9/5/99 687 9/6/99 686 9/7/99 689 9/8/99 694 9/9/99 697 9/1 0/99 666 9/11/99 230 9/12/99 458 9/1 3/99 698 9/14/99 707 9/1 5/99 711 9/1 6/99 708 9/17/99 701 9/18/99 701 9/19/99 705 9/20/99 707 9/21/99 710 9/22/99 714 9/23/99 709 9/24/99 709 9/25/99 712 9/26/99 712 9/27/99 708 9/28/99 700 9/29/99 703 9/30/99 703

~ s ~

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE October 5 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 REPORTING PERIOD Se tember 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 6524.6 167434.6
4. Number of Hours Generator Was On Line 720.0 6518.3 165235.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 486444 4565976 106386835

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNI1'.: i N DATE: October 5 1999 COMPLETED BY: D.R. Lafleur TELEPHONE: ~36->> 0 REPORT MONTH Se tember 1999 Unit 3 operated essentially at 100% in the beginning of the month of September, 1999. On September 10, 1999, power was reduced to 35% for Turbine Plant Cooling Water Heat Exchanger cleaning, turbine valve testing, and waterbox cleaning. Unit 3 resumed 100% power on September 12, 1999 and stayed essentially at 100% power for the rest of the month of September, 1999.

UNIT SHUTDOWNS DOCKET NO.

ONIIN¹MH:

DATE:

~k' 50-250 October 5 1999 .

COMPLETED BY: D. R. Lafleur THLHPHONH: 999 9->> 9 HH OHT'ONTH ~Sb 999 Date Duration Reason'ethod of Corrective Action No. Type (Hours)

Reactor'ause Shutting Down a

Coements N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT: N DATE: October 5 1999 COMPLETED BY: D. R. Lafleur TELEPHONE: 6->>

REPORTMONTH Se tember 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/99 693 9/2/99 693 9/3/99 695 9/4/99 693 9/5/99 693 9/6/99 694 9/7/99 697 9/8/99 702 9/9/99 705 9/10/99 705 9/11/99 705 9/12/99 699 9/13/99 700 9/14/99 706 9/1 5/99 708 9/1 6/99 706 9/1 7/99 699 9/1 8/99 700 9/19/99 703 9/20/99 705 9/21/99 709 9/22/99 711 9/23/99 707 9/24/99 708 9/25/99 712 9/26/99 711 9/27/99 706 9/28/99 704 9/29/99 705 9/30/99 702

e ~ ~

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE October 5 1999 COMPLETED BY D. R. Lafleur TELEPHONE REPORTING PERIOD Se tember 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 5997.7 164065.2
4. Number of Hours Generator Was On Line 720.0 5976.8 159713.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 505807 4165505 103838603

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point P4 DATE: October 5 1999 COMPLETE BY: D. R. Lafleur TELEPHONE: ~06->>

REPDHTMONTHS b 999 Unit 4 operated at essentially 100% for the entire month of September, 1999.

UNIT SHUTDOWNS EM!:

DOCKET NO. 50-251 D Ill N ~9k** I October 5 1999 M'ATE:

COMPLETED BY: D. R. Lafleur PELEPHDMI: tktl I->> I REPDRP MDNtH 9* I 999 No. Date TFpe'uration Reason'ethod of Corrective Action Reactor'ause (Hours) Shutting Coaments Down N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

l

/

h