ML17355A255

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr
ML17355A255
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/28/1999
From: Hovey R, Shukla G
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-063, L-99-63, NUDOCS 9903240195
Download: ML17355A255 (13)


Text

CATEGORY j.

REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9903240195 DOC.DATE: 99/02/28 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

,,50-$ 51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.MME AUTHOR AFFILIATION SHUKLA,G.S. Florida Power &, Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1999 for Turkey Point Nuclear Power Plant, Units 3 &, 4.With 990315 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ILE CENTER Ol 1 1 OC/DBA/PAD 1 1 GN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECZPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS I I I I OR REDUCE THE NUMBER OF COP ES RECE VED BY YOU OR YOUR ORGAN ZAT ON i CONTACT THE DOCUMENT CONTROE DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

MSR >.S 1999 Pl%4; L-99-063 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February, 1999, Operating Dat'a Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant GSS Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

. )ggg3 qqosasoxvs PDR ADQCK

'H~ ~P~

05000250,'DR R

an FPL Group company

It AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 ONPT: l ¹ DATE: March 4 1999 COMPLETED BY: G. S. Shukla TELEPHONE: '06-60 REPORT MONTH 0 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 2/1/99 722 2/2/99 378 2/3/99 667 2/4/99 712 2/5/99 716 2/6/99 718 2/7/99 719 2/8/99 717 2/9/99 713 2/10/99 712 2/11/99 715 2/12/99 718 2/13/99 719 2/14/99 730 2/15/99 734 2/1 6/99 730 2/17/99 728 2/1 8/99 726 2/1 9/99 723 2/20/99 722 2/21/99 725 2/22/99 733 2/23/99 735 2/24/99 733 2/25/99 727 2/26/99 730 2/27/99 727 2/28/99 724

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE March 4 1999 COMPLETED BY G. S. Shukla TELEPHONE 305 246-6047 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 672.0 1416.0 162326.0
4. Number of Hours Generator Was On Lfne 672.0 1416.0 160133.6
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 476413.0 1016997.0 102837856.0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT.

DATE:

~ki ¹ 50-250 March 4 1999 COMPLETED BY:

E HONE. ~5-<<

G. S. Shukla REPORTMONTH~¹999 Unit 3 operated at essentially 100% for the entire month of February, 1999, except for a scheduled power reduction to 40% on February 2, 1999 for performing a turbine valve test.

UNIT SHUTDOWNS DOCKET NO. 50-250 UNIT NHMII: T 9 P I 63 DATE: March 4 1999 COMPLETED BY: G. S. Shukla THLHPHOMI: HPD 46-694 IU! OHTMONTH 9 9 999 No. Date Duration Reason'ethod of . Cause a Corrective Action (Hours) Shutting Gxcsents Down Reactor*

N/A N/A N/A N/A, N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure

- Maintenance or Test l - Manual 2 - Manual Scram B

C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training a 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~~

I

AVERAGE DAILYUNIT POWER LEVEL IINI!'~kki DOCKET NO.

DATE:

50-251 March 4 1999 M

COMPLETED BY: G. S. Shukla BLB HDNB. ~6-6 M! DB! MD H~b9 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 2/1/99 721 2/2/99 722 2/3/99 719 2/4/99 715 2/5/99 713 2/6/99 713 2/7/99 714 2/8/99 712 2/9/99 708 2/10/99 710 2/11/99 711 2/12/99 714 2/13/99 714 2/14/99 727 2/1 5/99 730 2/16/99 728 2/1 7/99 726 2/1 8/99 723 2/1 9/99 721 2/20/99 720 2/21/99 723 2/22/99 732 2/23/99 733 2/24/99 731 2/25/99 726 2/26/99 728 2/27/99 724 2/28/99 721

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE March 4 1999 COMPLETED BY G. S. Shukla TELEPHONE 305 246-6047 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 672.0 1416.0 159483.5
4. Number of Hours Generator Was On Line 672.0 1416.0 155152.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 484252.0 1021148.0 100694246.0

UNIT SHUTDOWNS DOCKET NO. 50-251 ON TT N6 MR: 0 6 04 DATE: March 4 1999 COMPLETED BY: G. S. Shukla TRLRPHONH: ~06-604 RRPORT MONTH 0' 999 Da'to Duration Reason'ethod of Corrective Action Reactor'ause No. Type~ a (Hours) Shutting Cosnents Down N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 04 DATE: March 4 1999 COMPLETE BY: G. S. Shukla TELEPHONE: ~05 6-6 RB 0 TMONTH~Fb 99 Unit 4 operated at essentially 100% for the entire month of February, 1999.

e I

sl