Text

CATEGORY 1 REGULAT RY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9902050108% DOC.DATE: 99/01/29 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTHOR AFFILIATION

~

AUTH. NAME HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT. Forwards rev 3 to II Turkey Pox.nt Nuclear Pl a nt R e cove ry

~r C Plan." Rev does not decrease effectiveness of plan.

A DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution T NOTES:

~g)r/~~~',

RECIPIENT COPIES ID CODE/NAME LTTR ENCL LTTR ENCL PD2-3 LA 1 1 1 1 JABBOUR,K 1 1 INTERNAL. FILE HZZi~ 1 1 NRR/DE/ECGB/A 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NRR/SPSB JUNG,I 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 N

WASTETH NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

'I JAN 89 '1999 L-99-014 10 CFR 50.54(q) 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Recove Plan - Revision 03 Florida Power and Light Company (FPL) has issued Revision 03 to the Turkey Point Recovery Plan.

FPL has determined that the revision does not decrease the effectiveness of the Plan.

Attached is a summary of the changes to the Plan. Pursuant to 10 CFR 50.54 (q), enclosed is one copy of the revised Plan.

Should there be any questions, please contact us.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM attachment enclosure cc: Regional Administrator, Region II, USNRC (2 copies) di Senior Resident Inspector, USNRC, Turkey Point Plant (no enclosure)

I giga q902050i08 9'90129 PDR ADOCK 05000250 f P .

PDR an FPL Group company

I 99-014 AYl'ACH MENT Pago of 2 1

The following is a summary of the changes incorporated into Revision 03 of the Turkey Point Recovery Plan. The changes are organizational or administrative in nature, and do not represent a decrease in the effectiveness of the Recovery Plan or the Emergency Plan.

~ Revised the Sample Recovery Organization figure to more correctly illustrate the structure of the recovery organization.

~ Adjusted the recommended actions for the Emergency Control Officer and the Recovery Manager to more accurately rellect the actions of each as detailed in plant procedures.

~ Added additional guidance for field radiological survey actions.

~ Added additional guidance for coordinating ingress and egress of the plant with local authorities.

~ Various editorial changes.

~ t

(