ML17354B206

From kanterella
Jump to navigation Jump to search
Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg
ML17354B206
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/09/1998
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-298, NUDOCS 9812160273
Download: ML17354B206 (4)


Text

1 REGULA'A. Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSXON NBR:9812160273 DOC.DATE: 98/12/09 NOTARIZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-2'5l Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs that request f'r exemption specified in Section II.B.3 will not be needed re fire rating of raceway fire barriers in open turbine bldg.

DISTRIBUTION CODE: A029D COPIES RECEXVED:LTR ENCL SIZE:

TXTLE: Generic Letter 92-008 Thermo-Lag 330 Fire Barrier NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA PD2-3 PD JABBOUR,K INTERNAL: NRR/DE/EELB 1 NRR/DRPW/PD3-1 NRR/DSSA/SPLB 1 NRR/KUGLER,A RGN2 FILE 1 EXTERNAL:.NOAC NRC PDR NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZAT1ON, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 Q

'OTAL NUMBER OF COPTER REQUTRED: LTTR 11 ENCL

. A N

DEC 09 1998 L-98-298 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555

Subject:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Exemption Request - Fire Rating of Raceway Fire Barriers in the 0 en Turbine Buildin By letter L-97-181 dated July 31, 1997, Florida Power 6 Light Company (FPL) submitted a request for exemption from the requirements for

'raceway fire barriers in the open turbine building at Turkey Point Units 3 and 4. In Section II.B.3, FPL requested an exemption to allow taking credit for separation of redundant circuits by a horizontal distance of more than 20 feet.

As requested by the NRC during the December 1, 1998, telephone conversation, this letter documents FPL's intention to protect safe shutdown circuits in the open turbine building, therefore, the request for exemption specified in Section II.B.3 will not be needed.

Furthermore, should Turkey Point elect to take credit for physical separation of redundant circuits in the open turbine building, FPL would submit a separate exemption request for NRC review and approval.

Should there be any questions, please contact us.

Very truly yours, 8iJ.

R. Hov y Vice President Turkey Point Plant OIH cc: Regional Administrator, Region II, USNRC Qt Senior Resident Inspector, USNRC, Turkey Point +o 98i2i60273 98i209 VDR *DOCq O5OOOZSO, )

P PDR an FPL Group company

A, r

'v