CATEGORY j.

REGULAT INFORMATION DISTRZBUTIO YSTEM (RIDS)

~

'CCESSION NBR:9806150286 DOC.DATE: 98/05/31 NOTARIZED: NO DOCKET ¹ FACIL:50-2'50 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Ta)rkey Point Plant, Unit 4, Florida Power and Light 05000251 AUTH. NAME MOWREY,C.L.

'UTHOR AFFILIATION Florida Power 6 Light Co.

C HOVEY,R.J. Florida Power S Light Co.

RECXP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Turkey Point, Units 3 & 4.

W/980611 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR (

TXTLE: Monthly Operating Report (per Tech Specs)

ENCL J SIZE: T E

NOTES:

RECXPIENT COPIES RECXPIENT COPXES ID CODE/NAME LTTR ENCL ZD CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 JABBOUR K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 XLE C ER 01 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

I r ~

Vg

'JUN 11 1998 L-98-163 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the May 1998 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. I-Iovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 980b%5028b 9'8053i PDR mOCX OSOOOaso R PDR an FPL Group company

I l l

h J

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: Turke Point P3 DATE: June 4 1998 CD LE E 'C.

ELE ONE:

REPORT MONTH ~Ma 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 5/1/98 705 5/2/98 709 5I3/98 703 5/5/98 702 5/5/98 705 5/6/98 701 5/7/98 699 5/8/98 699 5/9/98 701 5/1 0/98 700 5/1 1/98 702 5/12/98 706 5I1 3/98 357 5/1 5/98 442 5/1 5/98 699 5/16/98 711 5/17/98 711 5/1 8/98 708 5/19/98 705 5/20/98 703 5/21/98 703 5/22/98 702 5/23/98 702 5/25/98 703 5/25/98 704 5/26/98 703 5/27/98 703 5/28/98 707 5/29/98 700 5/30/98 705 5/31/98 702

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE June 4 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD ~Me 1998 (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 3542.5 156660.3
4. Number of Hours Generator Was On Line 744.0 3533.8 154492.7
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 508839.0 2514381.0 98926937.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point P3 DATE: June 4 1998 COMPLETED BY e.

TELEPHONE: 305 246-6204 REPORT MONTH M~a1998 Date Duration Reasona Method of Cause 4 Corrective Action (Hour ) Shutting Co~nts Down Reactora 1063 5/13/98 0.0 Turbine valve test 1064 5/13/98 0.0 Turbine Plant Cooling Hater heat. exchanger cleaning 1065 5/14/98 0.0 Condenser water box cleaning F - Forced Reason Hethod 1 - Hanual S - Scheduled A - Equipment Failure 2 - Manual Scram B - Haintenance or Test 3 Automatic Scram C - Refueling 4 - Continued D - Regulatory restri,ction 5 - Load Reduction E - Operator Training 6 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OI'PERATING EXPERIENCE DOCKET NO. 50-250 IINIT: I E DATE: June 4 1998 COMPLETE BY.'~C.

TELEPEOMI: ~6-REPORT MONTH ~Ma 1998 Unit 3 operated at essentially 100% power until May 13. Power was reduced to 40% to perform periodic turbine valve testing. Power was then maintained below 50% to perform Turbine Plant Cooling Water heat exchanger cleaning and Condenser water box cleaning. The unit was returned to essentially 100% power on May 14, and operated there for the remainder of the month.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT. ~Tk P I It DATE: June 4 1998 CONPLHTHOBT C I'HLH NONH:

REPORT MONTH ~Ma 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 5/1/98 707 5/2/98 710 5/3/98 705 5/4/98 703 5/5/98 704 5/6/98 703 5/7/98 700 5/8/98 700 5/9/98 701 5/1 0/98 699 5/1 1/98 702 5/1 2/98 706 5/1 3/98 701 5/14/98 697 5/15/98 704 5/16/98 711 5/17/98 710 5/1 8/98 ?06 5/1 9/98 704 5/20/98 698 5/21/98 699 5/22/98 697 5/23/98 697 5/24/98 698 5/25/98 700 5/26/98 698 5/27/98 701 5/28/98 702 5/29/98 695 5/30/98 699 5/3198 697

C~

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Jaae4 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD ~Ma 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 3623.0 152930.5
4. Number of Hours Generator Was On Line 744.0 3623.0 148599.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 522106.0 2591089.0 96082726.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

~k¹4 50-251 June 4 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH M~a1998 No. Date Type Duration Reason Hethod of 8 Corrective Action to

{Hours)

Reactor'ause Shutting Doana Prevent Recurrence N/A N/A N/A N/A N/A F - Forced Reason Hethod S - Scheduled A - Equipment Failure 1 - Hanual B - Haintenance or Test 2 - Hanual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training c 5 - Load Reduction License Examination 9 - Other {Exp)ain)

F - Administrative 6 - Operational Error (Explain)

H - Other (Explain)

t )

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: June 4 1998 COMPLETE BY: C. L. Mowre TELEPHONE:

REPORT MONTH M~a1998 Unit 4 operated at essentially 100% power for the entire month.

E f

u> ~