ML17355A243

From kanterella
Jump to navigation Jump to search
Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE)
ML17355A243
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/25/1999
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-99-047, L-99-47, NUDOCS 9903090078
Download: ML17355A243 (2)


Text

CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9903090078 DOC.DATE: 99/02/25 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAl& 'UTHOR AFFILIATION HOVEY,R.J. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION REYES,L.A. Region 2 (Post 820201)

SUBJECT:

Informs that FPL does not have any candidates from Turkey Point scheduled to participate in 990407,Generic Fundamentals Examination (GFE).

DISTRIBUTION CODE: IE42D COPIES RECEIVED: LTR TITLE: Operator Licensing Examination Reports I ENCL 0 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD JABBOUR,K INTERNAL I NRR/DRCH/HOHB, RGN2 FILE 01 EXTERNAL: NOAC NRC PDR D

N NOTE TO ALL "RIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL

FEB 25 "999 FPL L-99-047 Mr. Luis A. Reyes Regional Administrator U. ST Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta St., N.W Atlanta, GA 30323

Dear Mr. Reyes:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 By letter dated February 5, 1999 (from Harold O. Christensen to Mr T ~ F ~ Plunkett), the NRC requested a list of candidates that will be participating in the Generic Fundamentals Examination (GFE) section of the written Operator Licensing Examination scheduled for April 7, 1999. Florida Power & Light Company does not have any candidates fxom Turkey Point scheduled to participate in the April 7, 1999, GFE.

Very truly yours, Qi R. J. Hovey Vice President Turkey Point Plant OIH cc: Robert M. Gallo, Chief, Operator Licensing and Human Factors Branch, NRR, USNRC Harold O. Christensen, Chief, Operator Licensing and Human Performance Branch, Region II, USNRC Document Control Desk, USNRC, Washington, DE CD Senior Resident Inspector, USNRC, Turkey Point Plant

'rr903090078 990225 PDR ADOCK 05000250 V PDR an fpL Group companY