Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley
ML17355A345
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/24/1999
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-99-115, NUDOCS 9906030287
Download: ML17355A345 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)

ACCESSION NBR:9906030287 DOC.DATE: 99/05/24 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-25.'. Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HOVEY,R.Z. Florida Power 6 Light Co.

RECIP . NAME RECIPIENT AFFXLZATION REYES,L.A. Region 2 (Post 820201)

SUBECT: Requests waiver of 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> (13 wks) required parallel C watchstanding in Control Room prior to license application submittal for W Conley.

DISTRXBUTZON CODE: XE42D COPXES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

RECXPIENT COPIES RECIPIENT COPIES ZD CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL LPD2-2 PD JABBOUR,K INTERNAL ~ZLE C R NRR/DIPM/ZOLB GN2 FILE 01 EXTERNAL: NOAC NRC PDR D

WASTETH NOTF TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPZES REQUIRED: LTTR 7 ENCL

HAY 2 4 1999 L-99-115 10 CFR 2.790 10 CFR 55.31 Mr. Luis A. Reyes Regional Administrator, Region EE Attn: Harold Christensen U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303

Dear Mr. Reyes:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 License A lication Florida Power and Light Co. (FPL) is requesting a waiver of the 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> (13 weeks) required parallel watchstanding in the Control Room prior to license application submittal for Mr. William Conley.

Mr. William Conley (Docket Number 22392) is a license candidate currently enrolled in our initial license class that is scheduled for the NRC license examination starting on August 30, 1999. The class schedule ensures that the candidates meet the 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> (13 weeks) required parallel watchstanding in the Control Room prior to license application submittal. However, Mr. Conley has had personal problems that resulted in his being under a physician's care. During this period, Mr. Conley continued to attend classroom and simulator training but he was temporarily denied access to the protected area.

As a result, Mr. Conley was not able to participate in approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> (5 weeks) of Control Room time. Some of this time will be made up prior to his license application submittal, but it is anticipated that he will be approximately 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> short of the 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> required.

FPL requests that Mr. Conley be allowed to take the NRC'icense examination as scheduled starting on August 30, 1999, and be allowed to complete the '520 hour0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> requirement after the examination but prior to his being issued a license. Mr. Conley has been a top performer and has shown that he has the ability to be a competent and safe operator. lt is desired to afford him the opportunity to examine with the current class. The next scheduled examination is not until late November of 2000.

9906030287 990524 PDR ADQCK 05000250 V PDR an FPL Group company

K L-99-115 Page 2 This letter contains personal information, the disclosure of which would clearly constitute an unwarranted invasion of personal privacy. Pursuant to 10 CFR 2.790(a)(6), we request that this correspondence and the attachments be withheld from public disclosure.

Should there be any questions, please contact Ms. Maria Lacal at (305) 246-6476.

Very truly yours, Ql R. J. Hove Vice President Turkey Point Plant OIH CC: Harold Christensen, Chief, Operator Licensing and Human Performance Branch, Region II, USNRC (original and two copies)

Senior Resident Inspector, USNRC, Turkey Point Plant Document Control Desk, USNRC, Washington, D.C.