Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr
ML17354A721
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-97-284, NUDOCS 9711280305
Download: ML17354A721 (11)


Text

CATEGORY 1

~O

~ ~

REGULAT . INFORMATION DISTRIBUTIO ~'YSTEM (RIDS)

ACCESSION NBR:9711280305 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET N FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

< 50-)51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAMQi'UTHORAFFILIATION MOWREY,C.L. Florida Power 8 Light. Co.

HOVEY,R.J. Florida Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1997 for Turkey Point, Units 3 &. 4.W/971114 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 . FXLE CENTE 1 1 1 NRR/DRPM/PECB 1 1 O /5B~/P 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I

~ ~

I

NOY 14 fggp L-97-284 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 97ii280305 97i03i PDR ADOCK 05000250 R PDR llllllllllllllllllllllllllllllllllllllll an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point ¹3 DATE Nov 05, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH October, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/97 711 10/02/97 712 10/03/97 710 10/04/97 709 10/05/97 711 10/06/97 715 10/07/97 717 10/08/97 717 10/09/97 716 10/1 0/97 713 10/1 1/97 715 10/1 2/97 716 10/13/97 718 10/1 4/97 719 10/15/97 720

$ 0/1 6/97 719 10/1 7/97 714 10/18/97 713 10/19/97 716 10/20/97 722 10/21/97 723 10/22/97 720 10/23/97 719 10/24/97 718 10/25/97 716 10/26/97 711 10/27/97 709 10/28/97 711 10/29/97 715 10/30/97 713 10/31/97 711

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE November 3 1997 COMPLETED BY ~C. L. Me wre TELEPHONE REPORTING PERIOD October 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 745.0 6202.3 151653.8
4. Number of Hours Generator Was On Line 745.0 6107.8 149494.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 532721.0 4204068.0 95364274.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: k DATE: November 3 1997 COMPLETED BY: ~L. L. M TELEPHONE: 305 246-6204 REPORT MONTH October 1997 No. Date Type Duration Reasons Nethod & Corrective Action

[Hours) of Comments Reactor'ause Shutting Down N/A E - Forced Reason Nethod S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance o Test 2 - Nanual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Train).ng 4 5 - Load Reduction License Examination 9 - Other {Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UN .'

N DATE: November 3 1997 COMPI.E E Y: C.

TE H HDNE::

REPORT MONTH October 1997 Unit 3 operated at essentially 100% power for the entire month of October.

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point ¹4 DATE Nov 05, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH October, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/97 0 10/02/97 0 10/03/97 0 10I04I97 0 10/05/97 0 10/06/97 0 10/07/97 0 10/08/97 0 10/09/97 0 10/10/97 0 10/11/97 0 10/1 2/97 0 10/13/97 0 10/14/97 120 10/15/97 210 10/1 6/97 272 10/17/97 296 10/1 8/97 571 10/1 9/97 709 10/20/97 720 10/21I97 720 10/22/97 715 10/23/97 713 10/24/97 716 10/25/97 716 10/26/97 712 10/27/97 708 10/28/97 712 10/29/97 716 10/30/97 715 10/31/97 712

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE November 3 1997 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD October 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 465.5 6390.5 147843.5
4. Number of Hours Generator Was On Line 434.7 6346.5 143512.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 256243.0 4383922.0 92433000.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TkPi N4 DATE: November 3 1997 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH October 1997 Ho. Date Duration Reason* Hethod & Corrective Action to (Hours) of Prevent Recurrence Reactor'ause Shutting Down 1053 9/8/97 309.0 Refueling outage 1055 10/14/97 1.3 Unit taken offline for turbine overspeed test F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - )4anual 8 - Naintenance or Test 2 Hanual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continued E - Operator Training I 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: November 3 1997 COMPLETE BY: L.

TELEPHONE: @~6-6 REPORT MONTH October 1997 Unit 4 started the month of October shut down for a refueling which began on September 8, 1997. The unit began operation on October 13. The plant shut down as scheduled the next day for a turbine overspeed test returning to power the same day. The unit reached 100% power on October 18, and remained at full power for the remainder of the month.