t CATZaoar Z REGULA v Y INFORMATION DISTRIBUTIOh YSTEM (RIDS)

ACCESSION NBR:9910010235 DOC.DATE: 99/09/22. NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-,251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAY< AUTHOR AFFILIATION Florida Power &, Light Co.

'OVEY,R.J.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards response NRC Administrative Ltr 99-03, "Preparation 6 Scheduling of Operator Licensing Examinations." NRC Form 536,encl.

DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Recpxalification Progr~

NOTES:

RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JABBOU 1 1 R

INTERNAL. FILE CENTER 0 1 1 NRR/DIPM/OLHP 1 1 RGN 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

m558u@m E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANZZATIONi CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 6 ENCL 6

SEI 88t999 L-99-197 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Administrative Letter 99-03 h 1'n r 'n Ex in i As requested by NRC Administrative Letter 99-03, "Preparation and Scheduling of Operator Licensing Examinations," issued August 20, 1999, attached is NRC Form 536 with the following information:

(1) estimates of the number of examinations Florida Power and Light Co. intends to prepare during calendar years (CYs) 2000 through 2003; (2) the estimated number of candidates to be tested and the proposed primary and alternate dates of the examination during CYs 2000 through 2003; and (3) the estimated number of candidates that plan to take the Generic Fundamental Examinations scheduled for CYs 2000 and 2001.

Should there be any questions please contact Ms. Maria Lacal at (30 46-6476.

ery t uly yours, Robert J. Hovey Vice President Turkey Point Plant OIH cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

'rr9i00i0235 990922

'oo)

PDR "r,ADQCK V'" "~' 'DR 05000250 an FPL Group company

'I I

'e V

Attachment to L-99-197 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150%131 EXPIRES 07/3V2002

'7-1999)

Estimated burden per response to comply with this voluntary information coltection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments regarding burden

, EXAMINATIONDATA estimate to tho Records Management Branch (TA E6) U S Nudear Regulatory Commission, Washington, DC 205554)001 or by internet email to b~ai ssro. Oo, and so sne Desk sxaner, snake os Infonnaaon and naaosaso\y Affairs, NEOB-10202, (31500131), Office of Management and Budgot Washington, DC 20503. If a means used to fmpose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Florida Power and Light, Turkey Point Units 3 and 4 A. PROPOSED EXAMINATIONPREPARATION SCHEDULE PROPOSED NUMBER CY 00 CY 01 CY 02 CY 03 1 0 2 0 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 0 0 B. INITIALOPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 00 CY 01 CY 02 CY 03 24 0 39 0 NUMBER OF REACTOR OPERATORS 10 10/10 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 5/10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0/4 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0/0 PROPOSED DATES February/ March 2002 (2/I 8/02 and 3/4/02) N/A PRIMARY DATE December 2000 N/A November 2002 (12/4/00 and 12/18/00) 11/4/02 and 11/18/02 Apnl 2002 (4/1 5/02 and 4/29/02)

ALTERNATE DATE N/A (already scheduled) N/A September 2002 N/A (9/9/02 and 9/23/02)

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION(GFE) SCHEDULE CY 00 CY 01 PROPOSED NUMBER FIRST SECOND FIRST SECOND ESTIMATED NUMBER OF CANDIDATES 20 (June examif available) 15 (February exam lf availabte) 20 (October exam) 12 June examir available NRO FORM 538 P.1999) PRINTED ON RECYCLED PAPER THIS FORM WAS DESIGNED USING INFORMS

g j

~

y'

( ~

<S'