CATEGORY 1 REGULAT INFORMATION DISTRIBUT10 SYSTEM (RIDS)

ACCESSION NBR:9807140041 DOC.DATE: 98/06/30 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5$ -~551,,Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.'NAME AUTHOR AFFILIATION MOWREY,C.L.

HOVEY,R.J.

RECIP.NAME

'lorida Florida Power &. Light Co.

Power & Light Co.

RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1998 for Turkey Point, Units 3 & 4.W/980709 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL " ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 '

1 E ENTER 1 1 OC/DBA/PAD 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONi CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

r V

~ A '

~

JUL G 9 1998" L-98-187 PPR 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the June 1998 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

~&4 ct807i 4004'i 980b30 PDR ADQCK 05000250 R PDR an FPL Group company

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: k i ¹ DATE: J~L¹1 6 1998 COMPLETED Y:

TELEPEOEE: ~¹-

C.

REPORT MONTH June 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 6/1/98 701 6/2/98 699 6/3/98 698 6/4/98 692 6/5/98 694 6/6/98 693 6/7/98 692 6/8/98 692 6/9/98 699 6/1 0/98 702 6/11/98 698 6/12/98 694 6/1 3/98 693 6/14/98 695 6/1 5/98 696 6/16/98 694 6/17/98 691 6/1 8/98 691 6/1 9/98 690 6/20/98 690 6/21/98 688 6/22/98 689 6/23/98 694 6/24/98 695 6/25/98 693 6/26/98 693 6/27/98 699 6/28/98 695 6/29/98 698 6/30/98 697

r.

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE ~Jul 8 1998 COMPLETED BY C. L. Mowre TELEPHONE REPORTING PERIOD June 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 4262.5 157380.3
4. Number of Hours Generator Was On Line 720.0 4253.8 155212.7
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 499976.0 3014357.0 99426913.0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 CNI I': ~k i H DATE: J~ul 6 1998 CCMILEI'EC BY: C~L. M I'ELE HONE: ~6-6 REPORT MONTH June 1998 Unit 3 operated at essentially 100% power for the entire month of June.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNITNAME:

DATE:

~ki 50-250 6 1998

~

~6

~Jul COMPLETED BY ~C.

TELEPHONE:

REPORT MONTH June 1998 Duration Reason* Method of Corrective Action Date Type (Hours)

Reactor'ause Shutting Down a

Ccmaents N/A N/A N/A N/A N/A N/A F - Forced Reason Method 1 - Manual S - Scheduled A - Equipment Failure 2 - Manual Scram B - Maintenance or Test 3 - Automatic Scram C - Refueling 4 - Continued D - Regulatory restriction 5 Load Reduction E - Operator Training & 9 Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT: I "I 66 DATE: J~ul 6 1998 CCMTLETEC EY: C.. M THLE HONE: ~6-6 REPORT MONTH June 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 6/1/98 696 6/2/98 694 6/3/98 693 6/4/98 688 6/5/98 690 6/6/98 689 6/7/98 688 6/8/98 688 6/9/98 695 6/1 0/98 698 6/11/98 693 6/12/98 689 6/1 3/98 322 6/14/98 340 6/1 5/98 670 6/1 6/98 692 6/1 7/98 693 6/1 8/98 692 6/1 9/98 693 6/20/98 694 6/21/98 691 6/22/98 691 6/23/98 697 6/24/98 698 6/25/98 695 6/26/98 695 6/27/98 702 6/28/98 698 6/29/98 701 6/30/98 699

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE ~Jul 9 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD June 1998 (Month/Yen r)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 4343.0 153650.5
4. Number of Hours Generator Was On Line 720.0 4343.0 149319.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 461525.0 3072614.0 96564251.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point P4 DATE: ~Jul 6 1998 COMPLETED BY L.

TELEPHONE: 305 246-6204 REPORT MONTH June 1998 Ho. Date Type Duration Reason Method of Cause r Corrective Action to (Hours) Shutting Prevent Recurrence Down Reactor 1066 6/13/98 0.0 Turbine valve testing F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:

DATE: J~ul 6 1998 COMPLETE BY: L.

TELEPHONE: 305 246-6204 REPORT MONTH June 1998 Unit 4 operated at essentially 100% power until June 13, when power was reduced to 40% for turbine valve testing. Power was restored to 100% on June 15, and Unit 4 stayed at essentially 100% power for the remainder of the month.