Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr
ML17355A291
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1999
From: Hovey R, Shukla G
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-087, L-99-87, NUDOCS 9904220223
Download: ML17355A291 (14)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9904220223 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50'-25l 'Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION SHUKLA,G.S. Florida Power & Light Co.

HOVEY,RE J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Mar 1999 for Turkey Point, Units 3 & 4.With 990414 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPXENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CxxLE=GENTE~R 01 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

APR 14 1999 L-99-087 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant GSS Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9904220223 990331 PDR ADOCK 05000250 R PDR an FPL Group company

~ ~

k h

~ ~

AVKRAGKDAILYUNIT POWER LKVKL DOCKET NO.

UNIT:

DATE:

~kN 50-250 6 '6 999 COMPLETED BY: G. S. Shukla 0'ELEPHQHE: H00 6-60 REPORT MONTH March 1999 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 3/1/99 725 3/2/99 729 3/3/99 728 3/4/99 730 3/5/99 730 3/6/99 729 3/7/99 727 3/8/99 719 3/9/99 730 3/1 0/99 722 3/11/99 721 3/12/99 720 3/13/99 714 3/14/99 719 3/1 5/99 725 3/1 6/99 731 3/1 7/99 731 3/18/99 728 3/19/99 725 3/20/99 724 3/21/99 722 3/22/99 718 3/23/99 723 3/24/99 718 3/25/99 715 3/26/99 718 3/27/99 712 3/28/99 715 3/29/99 717 3/30/99 720 3/31/99 722

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE April 5 1999 COMPLETED BY G. S. Shukla TELEPHONE 305 246-6047 REPORTING PERIOD March 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 2160.0 163070.0
4. Number of Hours Generator Was On Line 744.0 2160.0 160877.6
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 537849.0 1554846.0 103375705.0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 ENI DATE:

COMPLETED BY: G. S. Shukla TELE EQNE: NEE="

REPORT MONTH March 1999 Unit 3 operated at essentially 100% for the entire month of March, 1999.

I

UNIT SHUTDOWNS DOCKET NO. 50-250 DNIINAM!: I I 03 DATE: AHI I 999 COMPLETED BY: G. S. Shukla TELEPHDNE.: 6330 6-60 REPORT MONTH March 1999 No. Duration Reason Method of Corrective Action (Hours)

Reactor'ause Shutting Down Cocrrrent s N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continuation E - Operator Training & 5 - Other (Explain T icense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UM¹:

DATE:

~ki 50-251

¹ '

¹ COMPLETED BY:

TELE HDN¹: ~¹-

G. S. Shukla REPORT MONTH March 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 3/1/99 721 3/2/99 723 3/3/99 722 3/4/99 724 3/5/99 727 3/6/99 724 3/7/99 721 3/8/99 715 3/9/99 705 3/10/99 701 3/11/99 695 3/12/99 690 3/13/99 324 3/14/99 292 3/15/99 0 3/1 6/99 0 3/1 7/99 0 3/1 8/99 0 3/1 9/99 0 3/20/99 0 3/21/99 0 3/22/99 0 3/23/99 0 3/24/99 0 3/25/99 0 3/26/99 0 3/27/99 0 3/28/99 0 3/29/99 0 3/30/99 0 3/31/99 0

k

~ '

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE April 5 1999 COMPLETED BY G. S. Shukia TELEPHONE 305 246-6047 REPORTING PERIOD March 1999 (Month/Yaar/

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 336.0 1752.0 159819.5
4. Number of Hours Generator Was On Line 336.0 1752.0 155488.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 218998.0 1240146.0 100913244.0

UNIT SHUTDOWNS DOCKET NO. 50-251 UNIT NANE:

~ AI'E:

T~¹i A I 999

¹I COMPLETED BY: G. S. Shukla TELEPHUNH a¹D 6 69-REPORT MONTH March 1999 No. Date Duration Reason* Method of a Corrective Action Type (Hours)

Reactor'ause Shutting Down Comments 1999 0005 3/15/99 408.0 Shut down for refueling.

P - Porced Reason Method S - Scheduled A - Equipment Pailure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination P - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point ¹4 DATE: A 1115 1999 COMPLETE BY: G. S. Shukla TELEPHONE: ~56-66 REPORT MONTH March 1999 Unit 4 operated at essentially 100% reactor power until March 10, 1999. Then power was lowered in preparation for a refueling outage which started on March 15, 1999. The unit remained shut down for refueling for the remainder of the month, and is expected to restart on or about April 8, 1999.