Category:INSPECTION REPORT
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs ML14181B0101998-06-0808 June 1998 Insp Rept 50-261/98-05 on 980329-0509.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function IR 05000261/19950281995-12-14014 December 1995 Insp Rept 50-261/95-28 on 951030-1103.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000261/19950261995-10-0404 October 1995 Insp Rept 50-261/95-26 on 950827-0916.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950211995-08-10010 August 1995 Insp Rept 50-261/95-21 on 950618-0715.Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950201995-07-10010 July 1995 Insp Rept 50-261/95-20 on Stated Date.No Violations or Deviations Noted.Major Areas Inspected:Licensee Efforts Re Violations & Open Items Noted During SW Operational Performance Insp IR 05000261/19950151995-06-28028 June 1995 Insp Rept 50-261/95-15 on 950530-0602.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Occupational Radiation Protection Program During Extended Outages IR 05000261/19950171995-06-26026 June 1995 Insp Rept 50-261/95-17 on 950605-09.No Violations Noted. Major Areas Inspected:Emergency Operating Procedures & CA for Previously Identified Deficiencies IR 05000261/19950111995-05-0202 May 1995 Insp Rept 50-261/95-11 on 950403-07.No Violations Noted. Major Areas Inspected:Emergency Response Training,Emergency Notifications & Communications & Protective Action Decision Making IR 05000261/19950101995-04-28028 April 1995 Insp Rept 50-261/95-10 on 950327-31.No Violations Noted. Major Areas Inspected:Insp Conducted in Areas of Risked Based Operational Safety Including Control Room Observation & Review of Corrective Action Taken on Previous Insp Items IR 05000205/20030181995-04-17017 April 1995 Insp Rept 50-261/95-06 on 950205-0318.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation & follow-up IR 05000227/20030031995-04-0909 April 1995 Insp Rept 50-261/95-07 on 950227-0303.Violations Noted. Major Areas Inspected:Design Changes & Plant Mods, Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000103/20020111995-03-0606 March 1995 Insp Rept 50-261/95-03 on 950103-0211.Noncited Violations Identified.Major Areas Inspected:Plant Operations,Maint Observation,Engineering Evaluation & Plant Support Activities IR 05000261/19950041995-02-24024 February 1995 Insp Rept 50-261/95-04 on 950123-27.No Violations or Deviations Noted.Major Areas Inspected:Semiannual Radiological Effluent Release Rept,Radiological Environmental Program & Process & Effluent Monitoring IR 05000261/19940281995-01-20020 January 1995 Insp Rept 50-261/94-28 on 941204-950102.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance Observation,Plant Safety Review Committee Activities & Followup IR 05000261/19940251994-10-13013 October 1994 Insp Rept 50-261/94-25 on 940912-16.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities ML14181A6151994-10-0505 October 1994 Insp Rept 50-261/94-23 on 940821-0924.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Operator Overtime & Followup ML14181A6101994-10-0404 October 1994 Insp Rept 50-261/94-24 on 940912-16.Violations Noted.Major Areas Inspected:Review of Licensee Status Re Implementation of SBO Rule & Corrective Actions for Previous Inspection Findings in Electrical Area 1999-07-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:UTILITY
MONTHYEARIR 05000261/19900211990-10-16016 October 1990 Insp Rept 50-261/90-21 on 901001-05.Violation Noted.Major Areas Inspected:Observation of Inservice Insp & Work Activities IR 05000261/19900191990-09-11011 September 1990 Insp Rept 50-261/90-19 on 900820-24.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings IR 05000261/19900181990-09-0606 September 1990 Insp Repts 50-261/90-18 on 900813-17.Violations Noted,But Not Cited.Major Areas Inspected:Radiological Effluents,Plant Chemistry,Confirmatory Measurements,Pass & Radiation Monitoring IR 05000261/19900171990-09-0606 September 1990 Insp Rept 50-261/90-17 on 900711-0810.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation,Onsite Review Committee & Written Repts of Nonroutine Events IR 05000261/19900101990-08-0707 August 1990 Insp Rept 50-261/90-10 on 900521-25,0604-08,25-29 & 0713.No Violations or Deviations Noted.Major Areas Inspected: in-depth Team Insp of Maint Program & Implementation IR 05000261/19900161990-08-0202 August 1990 Insp Rept 50-261/90-16 on 900716-20.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing & Followup on Previous Insp Findings.Weaknesses Identified for Valves in Component Cooling Water Sys IR 05000261/19900151990-08-0202 August 1990 Insp Rept 50-261/90-15 on 900710-13.No Violations or Deviations Noted.Major Areas Inspected:Inspector Follow Up Items & Violations Re Electrical & Fire Protection Sys & Licensee Fire Protection Program IR 05000261/19900141990-08-0202 August 1990 Insp Rept 50-261/90-14 on 900611-0710. No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation, self-assessment Capability & Outage Preparations IR 05000261/19900121990-07-0202 July 1990 Insp Rept 50-261/90-12 on 900511-0610.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Esf Sys Walkdown,Maint Observation & Onsite Followup of Events IR 05000261/19900051990-04-24024 April 1990 Insp Rept 50-261/90-05 on 900311-0410.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Maint Observation & Insp of Quality Verification Functions IR 05000261/19900071990-04-19019 April 1990 Insp Rept 50-261/90-07 on 900402-06.No Violations or Deviations Identified.Major Areas Inspected:Design Changes & Mods IR 05000261/19900061990-04-16016 April 1990 Operational Safety Team Insp Rept 50-261/90-06 on 900402-05. No Violations Noted.Major Areas Inspected:Review of Four Violations,One Unresolved Item & Ten Inspector Followup Items IR 05000261/19900041990-04-0404 April 1990 Insp Rept 50-261/90-04 on 900319-23.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Commercial Grade Procurement & Licensee Action on Previously Identified Insp Findings ML14176A8441990-03-0808 March 1990 Insp Rept 50-261/90-02 on 900111-0220.Violation Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation & Onsite Followup of Events at Operating Power Reactors IR 05000261/19900011990-02-26026 February 1990 Insp Rept 50-261/90-01 on 900129-0202.No Violations or Deviations Noted.Major Areas Inspected:Licensee Corrective Action on Previous Insp Findings,Radiographic Film & 1988 Refueling Outage Inservice Insp 90-day Rept IR 05000261/19890321990-02-0808 February 1990 Insp Rept 50-261/89-32 on 891216-900110.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Followup of Events at Reactors ML14176A8311990-01-29029 January 1990 Insp Rept 50-261/89-31 on 891212-13.No Violations or Deviations Noted.Major Areas Inspected:Sequencing & Loading Electrical Safeguards Equipment Onto Safety Buses in Response to Unresolved Item 89-25-02 Re Overlap Problem IR 05000261/19890291990-01-11011 January 1990 Partially Withheld Insp Rept 50-261/89-29 on 891204-08 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Protected Area Assessment.Major Areas Inspected:Physical Security Program, Including Audits,Barriers,Access Controls & Alarm Stations IR 05000261/19890251990-01-0808 January 1990 Insp Rept 50-261/89-25 on 891111-1215.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Esf Walkdown & Evaluation of self-assessment Capability IR 05000261/19890271989-12-11011 December 1989 Insp Rept 50-261/89-27 on 891113-16.No Violations or Deviation Noted.Weaknesses Noted.Major Areas Inspected: Annual Emergency Response Exercise & Emergency Organization Activation & Response in Control Room IR 05000261/19890241989-11-21021 November 1989 Partially Withheld Insp Rept 50-261/89-24 on 891016-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt Support/Plans & Alarm Stations IR 05000261/19890281989-11-16016 November 1989 Insp Rept 50-261/89-28 on 891030-1103.No Violations or Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Control of Radioactive Matls & Contamination Surveys & Followup on Previous Inspector Identified Items IR 05000261/19890171989-10-0606 October 1989 Insp Rept 50-261/89-17 on 890811-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance & Maint Observations & Event Followup IR 05000261/19890211989-09-29029 September 1989 Partially Withheld Insp Rept 50-261/89-21 on 890911-15 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19890181989-09-14014 September 1989 Insp Rept 50-261/89-18 on 890814-0908.Violations Noted.Major Areas Inspected:Inoperability of Auxiliary Feedwater Sys IR 05000261/19890201989-09-14014 September 1989 Insp Rept 50-261/89-20 on 890827-0901.No Violations Noted. Major Areas Inspected:Selective Exams of Procedures & Representative Records,Interviews W/Personnel & Observation of Activities in Progress IR 05000261/19890151989-09-0707 September 1989 Insp Rept 50-261/89-15 on 890814-17.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies,Organization & Mgt Control & Training IR 05000261/19890131989-08-31031 August 1989 Insp Rept 50-261/89-13 on 890711-0810.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation & Followup on Corrective Action for Violations IR 05000261/19890141989-08-24024 August 1989 Insp Rept 50-261/89-14 on 890731-0804.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Plant Chemistry & Environ Monitoring ML14176A7551989-07-12012 July 1989 Insp Rept 50-261/89-200 on 890522-26.No Violations Noted. Major Areas Inspected:To Determine Whether Motor Operated Valves Designed,Installed & Being Maintained in Manner That Would Ensure Capability to Perform ML14191B1161989-05-18018 May 1989 Insp Rept 50-261/89-08 on 890311-0417.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Followup of Events at Operating Power Reactors ML14191B0991989-03-10010 March 1989 Insp Rept 50-261/89-03 on 890111-0210.Violations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Review Committee IR 05000261/19890061989-03-0303 March 1989 Insp Rept 50-261/89-06 on 890206-09.Licensee-identified Item Re Failure to Follow Procedures for Access Into Radiation Area Noted.Major Areas Inspected:Procedures Re Transfer of Spent Fuel from Spent Fuel Pool to ISFSI IR 05000261/19890041989-02-23023 February 1989 Insp Rept 50-261/89-04 on 890130-0203.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Chemistry & Health Physics Practices Associated W/Spent Fuel Transfer Operations IR 05000261/19880381989-02-0606 February 1989 Insp Rept 50-261/88-38 on 881211-890110.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance & Maint Observation & Onsite Followup of Events at Reactors & Mods ML14191B0731989-01-19019 January 1989 Insp Rept 50-261/88-36 on 881219-21.Violations Noted.Major Areas Inspected:Followup on Recently Identified Operating Events Involving Nonenviron Qualified Splices on Containment Fans & RCS High Point Vent Sys Not on Master List IR 05000261/19880311989-01-11011 January 1989 Insp Rept 50-261/88-31 on 881212-16.No Violations or Deviations Noted.Major Areas inspected:post-fire Safe Shutdown Capability Reverification & Assessment (Module 64510),including Functioning Configuration Mgt Program IR 05000324/19880331989-01-11011 January 1989 Insp Repts 50-324/88-33 & 50-325/88-33 on 880919-23.No Violations or Deviations Noted.Major Areas Inspected: Licensee Program to Maintain Occupational Exposures ALARA IR 05000261/19880351988-12-30030 December 1988 Corrected Rept Cover Sheet to Insp Rept 50-261/88-35 on 881128-1202.No Violations or Deviations Noted.Major Areas Noted:Resistance Temp Detector Bypass Elimination & Svc Water Sys Piping Replacement Mods IR 05000261/19880141988-12-21021 December 1988 Insp Rept 50-261/88-14 on 881128-1202.No Violations or Deviations Noted.Major Areas Inspected:Resistance Temp Detector Bypass Elimination & Svc Water Sys Piping Replacement Mods IR 05000261/19880331988-12-20020 December 1988 Insp Rept 50-261/88-33 on 881114-18.No Violations or Deviations Noted.Major Areas Inspected:Design Control,Design Changes & Mods IR 05000261/19880341988-12-20020 December 1988 Insp Rept 50-261/88-34 on 881111-1210.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance Observation,Maint Observation & Onsite Followup of Events ML14191B0321988-12-0909 December 1988 Insp Rept 50-261/88-30 on 881011-1110.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance Observation,Maint Observation & Onsite Followup of Events IR 05000261/19880231988-10-12012 October 1988 Corrected Page to Insp Rept 50-261/88-23 on 880811-0910.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Physical Protection, Surveillance Observation & Maint Observation ML14191B0151988-10-12012 October 1988 Insp Rept 50-261/88-23 on 880811-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance & Maint Observation,Esf Sys Walkdown & Onsite Review Committee IR 05000261/19880271988-10-0505 October 1988 Insp Rept 50-261/88-27 on 880912-14.No Violations or Deviations Noted.Major Areas Inspected:Biofouling of Containment Coolers.Licensee Actions After Identification of Potential Compromise of Containment Integrity Comprehensive IR 05000261/19880251988-09-28028 September 1988 Insp Rept 50-261/88-25 on 880829-0902.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention.Weakness Noted:During Exercise,One Individual Did Not Don self-contained Breathing Apparatus in Auxiliary Bldg IR 05000261/19880221988-09-19019 September 1988 Insp Rept 50-261/88-22 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment, Instrumentation,Supplies & Organization & Mgt Control IR 05000261/19880241988-09-0707 September 1988 Insp Rept 50-261/88-24 on 880725-29.No Violations Noted. Major Areas Inspected:Svc Water Design Verification & Survey of Current Svc Water Initiatives.Potential Deficiencies Identified Re Svc Water Sys Per Updated FSAR Design IR 05000261/19880201988-08-31031 August 1988 Insp Rept 50-261/88-20 on 880801-03.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Key Emergency & Organizational Functions During partial-participation Exercise.Related Info Encl 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-039, on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected1999-09-30030 September 1999 PNO-II-99-039:on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected IR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition ML14181B0101998-06-0808 June 1998 Insp Rept 50-261/98-05 on 980329-0509.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A3961997-12-0909 December 1997 EN-97-111:on 971212,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Identify Promptly & Correct Mispositioned EDG Output Breaker Switch ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing IR 05000261/19963011996-09-20020 September 1996 Exam Rept 50-261/96-301 on 960816-24.Exam results:14 SROs Passed & 1 Failed IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr 1999-09-30
[Table view] |
Text
{{#Wiki_filter:* # NG *
'
>
UNITED STATES
[
o,,
NUCLEAR REGULATORY COMMISSION o
REGION 11 0,
e r 101 M AHiETTA STREET,N.W.
ATLANTA, GEORGI A 30303 os...../
' Report No. 50-261/82-32 Licensee: Carolina Power and Light Company 411 Fayetteville Street
.
Raleigh, NC 27602 Facility Name: H. B. Robinson Steam Electric Plant Docket No. 50-261 License No. DPR-23 Inspection at H. B. Robinson Unit 2 near Hartsville, South Carolina Inspector: N.
ab
[[2 b
w 5.'Weise
'Date Signed Approved by:
e hws
/d / M
,
!
C. Burg 6r, Section JpTef, Division of Date Sfgned Project and Resid6nt Programs SUMMARY Inspection on August 11 - September 10, 1982 Areas Inspected This routine, announced inspection involved 164 resident inspector-hours on site in the areas of technical specification compliance, plant tour, operations performance, reportable occurrences, housekeeping, site security, surveillance activities, maintenance activities, quality assurance practices, radiation control activities, outstanding items review, IE Notice Followup, refueling startup testing, and noncompliance followup.
Results Of the 14 areas inspected, no violations or deviations were identified in 12 areas; one violation was found in two areas.
(Paragraphs 5., and 6.b. failure to establish and to implement procedures).
8211150361 821105 PDR ADOCK 05000261 G
PDR
.
.
.
..
-..
-
.
.
.
,
.
DETAILS
,
1.
Persons Contacted i
Licensee Employees
+*R. B. Starkey, Plant General Manager
+*J. Curley, Manager Technical Support
+F. Gilman, Project Specialist, Regulatory Compliance
- F. Lowery, Unit 2 Operations Supervisor
- W. Crawford, Manager, Operations and Maintenance R. Chambers, Unit 2 Maintenance Supervisor
+*C. Wright, Specialist, Regulatory Compliance
- S. Crocker, Manager, Environmental & Radiation Control
- D. Baur, Project Specialist QA/QC
- A. McCauley, Principal Engineer Nuclear Safety
- W. MacCready, Radiation Control Supervisor
+J. Young, Director Corporate QA/QC Other licensee employees contacted included technicians, operators, mechanics, security force members, and office personnel.
!
Other Organizations R. Muth, Westinghouse
- Attended exit interview on August 15, 1982
,
+ Attended exit interview on September 10, 1982 2.
Exit Interview The inspection scope and findings were summarized on August 27 and September 10, 1982 with those persons indicated in paragraph 1 above. The licensee acknowledged the violation presented and has initiated corrective actions.
,
3.
Licensee Action on Previous Inspection Findings
l (Closed) Severity Level V Violation 82-07-02. This item concerns valve
!
lineup deficiencies on the Containment In'egrated Leak Rate Test. The t
licensee has initiated a long-term procedural revision program which will include signoffs for each action required. 'Until ti.ese procedures are revised, the licensee has established Standing Order 18 which requires i
operators to document each step of multipls actions and develop necessary temporary changes to include all necessary actions for safety-related systems. This Standing Order appears adequate until the licensee completes his program for development of a procedure writing standard and upgrades all plant procedures accordingly.
'
!
,'t
,
-
+----y 7--
y n
-
-
y
,
w
.
.
.
,
.
(Closed) Unresolved Item 81-02-05.
Boron Injection Tank (BIT) low level alarm. The licensee vented some non-condensible gases out of the tank and the problem has not appeared. The inspector is continuing to follow
,
licensee corrective action on related BIT issues, however, this item appears
'
resolved.
(Closed) Severity Level IV Violation 82-20-09. This item concerned equipment storage procedures. The inspector reviewed the licensee's response letter dated August 20, 1982, and conducted an inspection of storage locations. The inspector identified several cartons of Q-list sulfuric acid which had not received a hold tag as required. The licensee immediately corrected the discrepancy and conducted an inspection of the chemical warehouse. No other discrepancies were noted and corrective action appears adequate.
-
(Closed) Severity Level V Violation 81-12-02. This item concerned requalification training program deficiencies in the areas of lesson plans and modifications. The ins 1981, reactor operator (RO)pector reviewed licensee response dated June 5, and senior reactor operator (SR0) replacement training lessons plans and outlines, and recent examination questions.
CP&L's contractor has supplied lesson plans, training aids, and reference materials for the R0 replacement training and is generating'such materials
for SR0 replacement training. Completion of the SR0 material is scheduled for March 1, 1983.
Requalification training lesson plans have been developed specifically by CP&L training to utilize those from the R0 program. The inspector's review of chese lesson plans determined thnt, significant improvement has been achieved in lesson plan quality and that the areas of mitigating core damage, plant modifications, and feedback of
'
operating experiences are receiving increased emphasis. The licensee has devoted considerable manpower and expense in the training area and has long range goals for added improvement. The inspector found the corrective actions well developed, well implemented, and far exceeding the scope of the violation.
4.
Unresolved Iteus Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or devia-tions. New unresolved items identified during this inspection are discussed in paragraph 11.c.
5.
Plant Tour a.
The inspector conducted plant tours periodically during the inspection interval to verify that monitoring equipment was recording as required, equipment was properly tagged, operations personnel were aware of plant conditions, and plant housekeeping efforts were adequate. The inspector determined that appropriate radiation controls were properly established, excess equipment or material was stored properly, and combustible material was disposed of expeditiously.
During tours, the inspector looked for the existence of unusual fluid leaks, piping
--
- __
.
-
_
-
_ _ _ _
.
. _
.
.
.
,
.
1 vibrations, pipe hanger and seismic restraint abnormal settings,
various valve and breaker positions, equipment clearance tags and component status, adequacy of firefighting equipment, and instrument calibration dates. Some tours were conducted on backshifts. The inspector performed major flowpath valve lineup verifications and system status checks on the following systems:
(1) Service water system.
(2) Selected containment isolation valves.
i (3) Steam driven auxiliary feedwater system.
(4) A Diesel Generator air start, fuel oil, lube oil, cooling water,
!
and service water sub-systems.
,
b.
During a tour of the containment spray system on August 25, 1982, the inspector found the following normally locked open valves open but not locked:
' A' spray pump eductor discharge (SI-892F), 'B' spray pump eductor inlet and discharge (SI-892 G and H), and eductor feed isolation (SI892A). The chains had been draped over the valves and locked, but could be easily undraped so as not to hold the valve handle. This flowpath is necessary for sodium hydroxide addition to the containment spray water for iodine removal.
The licensee took immediate action to correctly lock the valves. These valves are required to be locked open by FSAR Section 6.3 and Operating Procedure-42A.
Failure to implement this procedure is a violation.
(82-32-01)
c.
During a tour of the emergency diesel generator (EDG) rooms on August 31, 1982, the inspector noted that 'B' EDG air compressor was secured and the starting air system for the EDG's cross-connected. A review of auxiliary operators' logs indicated that this condition had existed frequently since July 26, 1982. This long term cross-connection of starting air due to compressor problems is not a good practice since a single failure in the air start piping can render both diesels
inoperable. The inspector conducted a review of the maintenance history on 'B' EDG air compressor and determined that since November 1981, the compressor has had a history of electrical and mechanical problems which have resulted in the compressor being frequently secured. During the same period, ' A' EDG air compressor has had similar problems but at a lower frequency. A detailed review of
'B' air compressor work requests indicated that problems with the compressor control and protective features were repetitive, and frequently new work requests were written outlining problems supposedly fixed only hours or days before.
Failure to implement adequate corrective action as required by plant administrative and maintenance policies is a violation.
(82-32-02).
l
- -. __
-.
.-
.
_ _ _ -.
,
.
_
_
..
.
.
.
,
.
6.
Technical Specification Compliance a.
During this reporting interval, the inspector verified compliance with selected limiting conditions for operation (LC0's) and reviewed results of selected surveillance tests. These verifications were accomplished by direct observation of monitoring instrumentation, valve positions, switch positions, and review of completed logs and records. The licensee's compliance with selected LC0 action statements were reviewed as they happened.
b.
The inspector reviewed Periodic Test (PT) 12.2, Radiation Monitoring System, for technical adequacy and proper performance. This PT is performed biweekly to satisfy the monthly functional test requirements of Technical Specification Table 4.1-1 Item 19. The inspector reviewed a sampling of PT 12.2's performed during 1982. The following deficiencies were noted:
(1) Radiation monitor readings are recorded for local, control room, and recorder indication for comparison under background and maximum source level conditions. No acceptance criteria exists for initiation of maintenance.
Readings on the following monitors were noted that differed by at least a factor of ten with no corrective action taken:
Plant vent radioactive gas monitor (R-14), Liquid waste effluent monitor (R-18), Steam generator blowdown monitor (R-19), and Containment fan cooling monitor (R-16).
(2) The high alarm setpoints are recorded but are not required to be compared with the current setpoint recorded on the radiation monitor setpoint log and change record. The following setpoint discrepancies were noted:
Date Monitor Expected Setpoint As-found 1/15/82 R-11 1.8 K cpm 13 K cpm 1/15/82 R-15 6 K cpm 400 K cpm 3/11/82 R-12 125 cpm 65 K cpm 4/23/82 R-20 5.1 K cpm'
60 K cpm
The containment air particulate monitor (R-11), containment l
gaseous activity monitor (R-12), condenser air ejector gas monitor (R-15), and lower fuel handling building monitor (R-20) high alarm features perform automatic safety functions affecting effluent flow and containment ventilation isolation. The above uncorrected as-found conditions are nonconservative with respect to those
!
functions.
(3) Several process monitors (R-11, R-12, R-20) have high and low air flow alarms which are tested but have no acceptance criteria.
These alarms are to warn of inadequate or excessive flow through the monitor.
,
I J
___
-_,
_
-
_ _. _ _ -... _ _ _ _ _
_
_, _ _., _ _. _ _
.
.
.
,
,
5 (4) Process monitor readings are recorded for the check source position, range switch test position, and high voltage position.
These readings have no acceptance criteria. High voltage variations can affect detector response.
(5) PT documentation discrepancies such as checking-off steps vice initialing, recording similar readings in different units, values not recorded, and a data sheet not filled out on post-maintenance testing were noted.
(6) Condenser air ejector gas diversion valves were labeled under the old valve number system vice the current system.
(V6-80 and 81 vice 1436 A and B).
(7) Supervisory reviews did not identify the above discrepancies.
Through discussions with the licensee and review of other tests and logs, the inspector determined that other documentation overlaps portions of the PT 12.2 testing. For this reason, it appears that the radiation monitoring system operability has been maintained. However, due to the disjointed nature of these other tests and records and the fact that PT 12.2 is the designated auditable record, this lack of acceptance criteria and failure to initiate corrective action reflects inadequate surveillance practices.
Items (1) through (4) above consititute a violation for failure to establish and implement an adequate surveillance procedure.
(82-32-03).
Items (5), (6), and 7 constitute an open item (82-32-04) requiring additional inspector review to determine relevance to other surveil-lances.
7.
Plant Operations Review a.
The inspector, periodically during the inspection interval, reviewed shift logs and operations records, including data sheets, instrument l
traces, and records of equipment malfunctions. This review included control room logs, auxiliary logs, operating orders, standing orders, jumper logs, and equipment tagout records. The inspector routinely l
observed operator alertness and demeanor during plant tours. During l
abnormal events, operator performance and response actions were observed and evaluated. The inspector conducted random off hours inspections during the reporting interval to assure that operations and security remained at an acceptable level. Shift turnovers were
,
observed to verify that they were conducted in accordance with approved i
l licensee procedures.
I b.
On August 15, 1982, shortly after pulling the shutdown banks control rods following a reactor trip, rod L-11 dropped into the core. The l
reactor was subcritical at hot shutdown conditions. Operators earlier had received an urgent failure alarm on rod drive cabinet 1BD, had replaced a blown stationary gripper fuse on L-11, and had tested the l
.
_--.
-.
-
.
.
.
-
'
-
-
shutdown bank rod drive operability. The shutdown banks were driven in and licensee investigation begun. A defect was found in the L-11 stationary gripper coil, and the plant was returned to cold shutdown to facilitate coil housing replacement. The L-11 coil was replaced, H-10 rod position indication was repaired, and a checkout of all rod control drive mechanisms and position indication was conducted. Plant heatup commenced on August 18.
c.
On August 15, 1982 with the reactor critical and adding heat, operators attempted to conduct surveillance on the steam driven auxiliary feedwater pump (SDAFWP) and discovered the steam supply valve (MS-154)
to the turbine shut. This valve was indicated as open on a valve lineup completed on August 11, 1982. The licensee took action to open the valve and lock it open and initiated an investigation. While the valve did not result in an LC0 violation, not having the pump operable violates licensee administrative requirements for auxiliary feedwater pump operability. The inspector reviewed Operating Procedure (0P)-14A Auxiliary Feedwater (AFW) System Valve lineup, OP-17A Main and Reheat Steam valve lineup, and OP-16A Condensate and Feedwater valve lineup.
The inspector determined that several main steam and feedwater valves required for proper SDAFWP operation had not been included in the independent verification program:
(1) Steam supply valves for the SDAFWP MS-V1-8A, B, and C; MS-V1-48A, B, C; and MS-154.
!
(2) Feedwater valves FW-6A, B and C which are capable of interrupting SDAFWP AFW flow.
(3) Various SDAFWP pump seal and steam header drain valves. Similar ancilliary valves in the AFW system require independent verifi-cation.
l l
The inspector also reviewed Operating Work Procedures (0WP) for the SDAFWP, the motor operated steam isolation valves, and the motor i
operated AFW supply valves. These procedures did require independent verification for maintenance related movement of the above valves. The
'
inspector noted that 0WPs AFW 7, 8, and 9 erroneously called the steam supply valve MS-184 vice MS-154. This was brought to the attention of the licensee, and was corrected. The licensee took immediate action to revise the appropriate procedures to require independent verification and, in some cases, locking of the valves. This corrective action appeared adequate. The licensee's investigation could not determine
'
how or when the valve was shut.
8.
Physical Protection a.
The inspector verified by observation and interview during the reporting interval that measures taken to assure the physical
,
protection of the facility met current requirements. Areas inspected
'
l included the organization of the security force, the establishment and
,
- - - -
.-< -
,, - - --,
,. -,,.
,r
,,- -
,
+.~w
- -. + - - - - - - + - - - - - - - - - - - - - - - - - - - -
.
.._
-
-
o
.
.
!
maintenance of gates, doors and isolation zones in the proper.
condition, that access control and badging was proper, that search practices were appropriate, and that escorting and communications procedures were followed. The inspector observed six individuals achieve acceptable scores on weapons firing qualification in preparation for the armed guard qualification. The inspector also reviewed several corrected qualification written examinations. No violations or deviations were noted.
b.
On September 9,1982, the inspector observed a semi-annual test of the security system power supply reliability.
Sources of power to vital security equipment were de-energized to verify that required backup supplies maintained system operability. The inspector was satisfied that backup power reliability had been increased by a recent plant modification. This partially resolves unresolved item 82-16-01.
9.
Reactor Trips a.
On August 12, 1982, with the plant hot and critical in the interriediate range, a reactor trip occured on two of four power range nuclear instruments. N-44 was out of service with its bistables tripped for use as input to the reactivity computer for low power physics testing.
An instrumentation and control technician was attempting to return N-44 to service when he mistakenly pulled the fuses on N-43.
This resulted in the reactor trip. The licensee declared an unusual event and
'
terminated it upon making the appropriate notifications.
b.
On August 15, 1982, at abcut 10% reactor power, a reactor trip occurred on 'B' steam generator (S/G) low-low level. The unit had been synchronized with the grid fifteen minutes earlier and power was being increased when problems developed with the 'B' feedwater block valve.
Despite attempts to open the valve by motor operator and manually, the motor operator acted to keep the valve shut. Due to feed flow problems and decreasing 'B' S/G level, the turbine governor valves were closed which shrunk S/G level to the trip setpoint. An unusual event was declared and the proper notifications made.
Licensee investigation into the feedwater valve problem determined that the valve needed additional stroking and lubrication and limit switch adjustment.
c.
On August 20, 1982 with the reactor critical at normal temperature and pressure, operators were adjusting 'C' steam generator PORV setpoint when the PORV failed open.
Setpoint adjustments had been completed on
'A'
and 'B' PORVs. The valve opened 100 psig prior to the setpoint
,
value reaching indicated steam header pressure.
The control operator (
tried to shut the PORV from the control board, but the valve did not respond. A safety injection actuation and reactor trip occurred on high differential pressure between the steam header and 'C' steam line.
All safety systems responded as required, although several valves erroneously indicated that they were out of position. Operators isolated instrument air to the PORV's and the valve shut. The valve was open about 1-1/2 minutes and caused the primary system parameters
!
--
-
.
.
._
.
.
.
,
.
,
to decrease to 2070 psig and 504 F.
No safety injection flow occurred due to the plant pressure. An unusual event was declared and the NRC notified. The feedback linkage to the PORV positioner was found disconnected with the retaining screw missing. A check of the PORV feedback linkages determined that the fastener could loosen and that the retaining screw was shorter than desired. The licensee replaced the retaining screws with longer screws and installed a locknut as a fastener to prevent future linkage failure. The following day, after reactor startup, a second attempt to set the PORV setpoint resulted in the valve lifting early. Air to the controller was isolated, shutting
,
the valve. Techniciant determined that the span on the controller had drifted out of tolerance. The controller was recalibrated and returned
,
!
to service later that day, and the setpoint properly set. The valve position indication for three containment isolation valves were also i
repaired. Through discussions with licensee personnel, the inspector determined that the proper locknuts were probably received with the valves and positioners from the manufacturer. Apparently, during installation of the valves in 1980, the correct locknuts were lost and incorrect nuts substituted by construction personnel.
d.
On August 21, 1982, with the reactor at about 20% power, a reactor and turbine trip occurred on high level in
'C' steam generator when 'C'
feedwater regulating valve (FRV) stuck partially open and the feedwater
block valve could not be closed quickly enough. An unusual event was declared and the NRC notified. All FRV's were inspected, had their stems lubricated, and were stroked with no flow through the valves. No problems were encountered and the unit was restarted after about an hour and a half. About four and a half hours later at about 20% power,
'C' FRV stuck about 1/4 open and the block valve was not shut in time to prevent the reactor and turbine trip which occurred on high
'C'
steam generator level. An unusual event was declared and the NRC
,
notified. The licensee contacted the valve vendor, who recommended
'
that the spring tension be adjusted for additional closing force. All three FRV's were so adjusted and the plant returned to power operation.
During power operation at about 28% power, 'B'
and 'C' FRV's were placed in automatic and operated properly.
'A' FRV, however, experienced binding problems at 1/5th open and would not shut if placed in automatic control.
Plant power was held constant until August 22, when the plant was taken off-line to investigate the
'A'
FRV problems.
The licensee now believes that foreign material was responsible for the valve binding problems. The FRV plugs and cages were replaced during the refueling outage with a new ported flow design for smoother operation. The tolerances in the valve are sufficiently close that they are more susceptible to foreign material binding. The licensee dismantled and inspected ' A' and 'C' FRV's and observed several scuffs where foreign matcrial may have lodged. The valves were reassembled, and the plant returned to power operation August 23. The inspector will continue to monitor FRV performance and review licensee efforts to improve feed system cleanliness.
.
- --
.
--
-
- - _ _ -
-.
-
-
.
.
.
,
e.
On September 5,19o2, with the reactor operating at 93% power, a loss of feedwater flow occurred when all three feed regulating valves (FRV)
failed shut. The reactor and turbine tripped on
'B' steam generator low level coincident with steam flow-feedwater flow mismatch. An unusual event was declared, and the NRC was notified. All safety systems responded as required. The cause of the FRV failure was identified as a short on the 'A' train feedwater isolation solenoid on
'C' FRV. This short blew the fuses for the common power supply, resulting in isolation of instrument air to each FRV. The solenoid was replaced and the reactor returned to power operation.
f.
On September 9, 1982 at 90% power, the plant experienced a loss of 'B'
condensate pump causing a low suction pressure trip of 'B' Main Feed Pump. Operators attempted to rapidly reduce turbine load to within the capabilities of one feed pump, but the reactor tripped at about 70%
power when steam dump actuation caused a low-low level in 'C'
steam generator. All safety systems responded as required. The cause of the condensate pump trip was a faulty hotwell level switch in the pump trip ci rcuitry. An unusual event was declared and the NRC was notified.
10.
Indepenoent Inspection a.
During review of liquid waste releases, the inspector noted that tank level curves were used to determine the number of gallons released during a batch release. Through further review of release forms the inspector also noted that tank level quantity was generally higher than flow integrator quantity. Through discussions with the licensee, the inspector learned that a comparison program was established between October 1976 and June 1979 to determine comparability and to use for trend analysis. The inspector reviewed a June 14, 1979 memo which concluded that waste tank curves gave quantities from 6% to 16% greater than flow integrator readings. Because of this study, in October 1979 the liquid waste release accountability procedure (HP-14) was revised to require a plot of integrator and tank curve gallons and required a calibration of the instruments if a discrepancy greater than 10%
existed. When the new procedure for liquid waste releases (ES-3) was implemented in 1980, this reonirement was eliminated. The inspector has three concerns from this review:
(1) Procedure ES-3 Revision 7 requires use of tank level gallons regardless of whether it is conservative with respect to integrator readings. The largest quantity should be used in the calculation unless the instrument is known to be out of cali-bration.
(2) The licensee has not placed criteria in ES-3 to require corrective maintenance when the indicated gallons released from the two methods show significant differences.
(3) The study conducted indicated that the monitor tanks' level indication yielded 16% higher release values than by integrato '
.
.
,
.
.
,
Based on a review of licensee effluent accountability reports, the inspector concluded that effluents have not been significantly underestimated, and generally appear conservatively high, additional procedural guidance is warranted to ensure conservatism and address instrument operability. These items will remain open pending licensee corrective action.
(82-32-05).
i b.
During a plant tour on September 1,1982 the inspector noted wide variation in readings on the containment dewpoint recorder. Specifi-
'
cally, two of the six humidity monitors had readings which were invalid low.
For a containment temperature of 120 F, four monitors read from 171-176 F, and two monitors read 114 F and 138 F respectively.
Auxiliary operators log these readings every shift. A review of shift logs revealed that one low reading has existed since March, and the other since August 12, 1982. This humidity detection instrumentation is discussed in FSAR Section 5.2.5 and Technical Specification Section 3.1 as a backup system to the containment particulate and gas radiation monitors for reactor coolant system leakage detection. Despite logging and Shift Foreman reviews of the data on a shiftly basis, no work request was initiated to repair the equipment. This was brought to the licensee's attention for corrective action.
MFI 82-32-06).
11. Refueling Startup Testing (72700)
The inspector reviewed and witnessed performance of the following licensee
'
procedures:
PT-R-6.0, Refueling Startup Procedures
,
PT-R-9.1, Operational Alignment of Nuclear Instrumentation (NIS)
PT-R-9.2, Operational Alignment of Process Temperature Instrumentation PT-R-9.3, Thermal Fewer Measuiement PT-R-9.4, Power Distribution Maps PT 1.8, NIS Power Range Axial Offset Calibration PT 1.7, Power Range Calculation FF-4, Flux Mappi g Procedures FF-7, F (DELTA I Calibration Procedure These procedures were used to perform the startup testing discussed below.
a.
Core Power Distribution Limits (61702). The inspector reviewed testing procedures and data for distribution limits at 70%, 90%, and 93% power.
Under the present temperature average program, reacter power is limited by governor valve position.
For the above power levels, the inspector verified that the licensed distribution limits and the acceptance criteria for further pcser escalation were met. The licensee uses the INCORE computer program to process the incore data. Quadrant power tilts were also verified within limits.
.
_
-
'
-
.
.
.
The inspector identified one concern, in that the site reactor engineering staff were not involved in the changes to core evaluation computer codes. These changes and evaluations are done by the Corporate Fuels Department. Because these codes are used to verify Technical Specification requirements, the site staff should be kept current of any changes and the attendant safety evaluations.
Review of Corporate controls over analysis code changes will be conducted during a future inspection.
b.
Incore/Excore Detector Calibration (61705)
The inspector observed portions of the data collection at 70% power and verified that the procedures addressed precautions and xenon oscillations. The inspector reviewed the data and results from the FDELTAI computer code, verified that the calibration data was provided to the instrumentation and control department, and that calibrations were performed in accordance with maintenance procedure NP2-1. The inspector reviewed the observed versus expected detector currents at 93% power and noted that detector N44 was outside the acceptance criteria of PT 1.8.
This was discussed with the site nuclear engineer and appears to be caused by detector nonlinearity with increasing power. The licensee's present plans are to determine the full power current based on detector linearity above 70% power and perform a recalibration of the instrumeat. Westinghouse is also evaluating the detector data. This item wil' remain open pending long term resolution.
(82-32-07).
c.
Core Thermal Power Evaluation (61706)
'
The inspector reviewed the licensee's calorimetric procedures for technical adequacy. The inspector noted that the procedure did not j
specifically consider the heat loss due to steam generator blowdown, however, the licensee's assumption that steam mass flowrate equals feed mass flowrate conservatively accounts for blowdown. The inspector performed independent calculations to confirm selected licensee results
!
and verified that instruments had been calibrated.
Power level i
instruments were set to correspond with calorimetric data. The
inspector asked the licensee to provide the basis for the heat added l
constant used in Periodic Tests 1.7 and R-9.3.
The inspector found differing values which were determined during hot functional testing in the plant files. The present value was incorporated into the procedure
,
May 21, 1971 without any record of a formal procedure change. The l
l licensee has been unable to provide the basis for the value, and until it is determined, this item is unresolved.
(82-32-08).
,
'
d.
Shutdown Margin Determination (61707)
l The inspector reviewed the facility shutdown margin for the plant in
the hot shutdown condition. Licensee Technical Specifications do not
'
require periodic shutdown margin determination. The inspector verified that adequate shutdown margin was maintained for core reactivity
. -..
.-
.
-
.
-
.
-.
-
.
.
-.
-
.
.
-
.
.
changes since the most recent criticality.
Shutdown margin met Technical Specification requirements.
e.
Target Axial Flux Difference Calculation (61711)
The inspector reviewed the licensee's procedures and results. The data
-
at 93% power indicated that the N44 detector currents did not meet the acceptance criteria of PT 1.8.
The licensee decided to input the target values for detectors N41, N42, and N43 while continuing to investigate N44.
Further corrective action for N44 is discussed under paragraph b. above. Operators are currently using the three acceptable detectors for axial offset determination.
12. Licensee Event Report (LER) Followup The inspector reviewed the following LER's to verify that the report details met license requirements, identified the cause of the event, described appropriate corrective actions, adequately assessed the event, and addressed any generic implications. Corrective action and appropriate licensee review of the below listed events was verified. When licensee identified violations were noted, they were reviewed in accordance with the enforcement policy. The inspector had no further comments.
LER Event 80-19 Canopy seal weld defects 80-21 Containment spray seismic supports 82-08 Failure of delta flux summator 82-10 Control rod drive mechanism leak 13. Review of IE Notices The inspector verified that IE Notice 82-15 had been received onsite and reviewed by cognizant licensee personnel.
14. Outstanding Items Review (Closed) Open item 81-27-37. The inspector conducted a review of the planners' work request indexes for outstanding safety-related maintenance.
While the indexes were not always current, the work had generally been completed. The inspector identified no outstanding 1981 safety-related maintenance of concern. Additionally, the licensee revised Maintenance Procedure MP1-1 to require a quarterly review of overdue safety-related work requests.
(Closed) Open item 82-11-03. The licensee has implemented Periodic Tests 48.2 and 48.3 and has incorporated dedicated shutdown instrumentation into the calibration program. About half the instruments have been calibrated, with the remainder covered by outstanding work request *
.
.
.
.
.
(Closed) Inspector followup item 81-05-02. This item concerned the nitrogen supply to the Isolation Valve Seal Water system from an auxiliary building nitrogen header. The deficiency was determined to be a plugged nitrogen line which was found and replaced during the refueling outage. The supply line was tested satisfactorily and will be placed in service at the completion of the modification package turnover.
,
.
l l
1,
.
}}